Skip to main content

Energy from Waste Facility - establishment and acceptance of tender CORRIGENDUM TO P.72/2008

This content has been automatically generated from the original PDF and some formatting may have been lost. Let us know if you find any major problems.

Text in this format is not official and should not be relied upon to extract citations or propose amendments. Please see the PDF for the official version of the document.

CORRIGENDUM

P.72/2008 E n ergy from Waste Facility: establishment and acceptance of tender

(1 ) O n p age 24, in the 3rd column of the table, for the amount"£11.2M" substitute the amount

"£10.8M".

(2 ) O n p age 30, for the landscapePage 10' of the Appendix 2 document, substitute the page

shown on the reverse of this Corrigendum sheet.

(3 ) O n p age 35

( a ) f o r th e t e x t in the 2nd column of the table opposite the text "3.09" in the 1st

column, substitute the following –

" S ta f f in g C o s ts b as e d o n :  

1 e le c tr i c ia n @£27,000 and 2 technicians @ £30,784

    1 s h if t le a d e r a t £ 4 8 ,0 5 1 , 1 o p e r a to r @£36,000 and 2  labourers

@ £24,000.";

( b ) f o r t h e t e x t in the 2nd column of the table opposite the text "3.12" in the 1st

column, substitute the following –

" B a s e d o n s im il a r s i m p l e I n - V e s sel Composting systems in the UK, the annual power requirement for the facility would be approximately 20 kWh per tonne of input waste.".