CORRIGENDUM
P.72/2008 E n ergy from Waste Facility: establishment and acceptance of tender
(1 ) O n p age 24, in the 3rd column of the table, for the amount"£11.2M" substitute the amount
"£10.8M".
(2 ) O n p age 30, for the landscapePage 10' of the Appendix 2 document, substitute the page
shown on the reverse of this Corrigendum sheet.
(3 ) O n p age 35 –
( a ) f o r th e t e x t in the 2nd column of the table opposite the text "3.09" in the 1st
column, substitute the following –
" S ta f f in g C o s ts b as e d o n :
1 e le c tr i c ia n @£27,000 and 2 technicians @ £30,784
1 s h if t le a d e r a t £ 4 8 ,0 5 1 , 1 o p e r a to r @£36,000 and 2 labourers
@ £24,000.";
( b ) f o r t h e t e x t in the 2nd column of the table opposite the text "3.12" in the 1st
column, substitute the following –
" B a s e d o n s im il a r s i m p l e I n - V e s sel Composting systems in the UK, the annual power requirement for the facility would be approximately 20 kWh per tonne of input waste.".