This content has been automatically generated from the original PDF and some formatting may have been lost. Let us know if you find any major problems.
Text in this format is not official and should not be relied upon to extract citations or propose amendments. Please see the PDF for the official version of the document.
STATES OF JERSEY
APPROVED GOVERNMENT PLAN AND ANNEX 2024-2027
Presented to the States on 29th February 2024 by the Chief Minister
STATES GREFFE
2024 R.34
14 DEC 2023
Government Plan
2024 -2027
GP
Government
Programme
P.72/2023 as amended and approved by the 2024-27 States Assembly on 14 December 2023
CONTENTS
Government Plan Summary 3 Foreword by the Chief Minister and Minister for Treasury and Resources 7 Economic Context 12 Sustainable Wellbeing 17 Financial Strategy 24 General Revenue Income 31 Public Sector Spending 2024-2027 48 Delivering Value for Money 55 Capital and Other Projects 2024 - 2027 59 New Healthcare Facilities Project 78 The Government of Jersey 81 Balance Sheet and States Funds 81 Financial Matters Under Development 98 Appendix 1: Key to Abbreviations 101 Appendix 2: Proposition and Summary Tables 103 Appendix 3: Supplementary Financial Tables 115 Appendix 4: Administrative Tax Measures 118
Government Plan 2024 – 2027 (P.72/2023) as amended
On 14th December 2023 the States Assembly approved the Government Plan 2024 – 2027 as amended (a list of adopted amendments is included in Appendix 2).
This document sets out:
• The final Government Plan as amended by all amendments agreed by the States Assembly, together with any necessary consequential and minor factual corrections.
• The P.97/2022 Proposition and Summary Tables, as amended by the States Assembly (see Appendix 2).
The Government Plan is the government s budget document for the next 4 years. It sets out the income and expenditure that Ministers are proposing. It also shows how taxpayers money is spent on delivering services, infrastructure and facilities to Islanders. It builds on the Council of Ministers Common Strategic Policy and the Government Plan 2023 to 2026.
This Government Plan covers the period from 2024 to 2027.
For more information on the government s priorities for 2024, visit gov.je/GovernmentProgramme.
2024 Highlights:
General Revenue Income: Government spending on Spending on buildings
delivering services to Islanders: and infrastructure:
£1.2bn £1.16bn £113m
New Healthcare Increased single person Balance in the Strategic Facilities: tax allowance in 2024: Reserve:
£
£52m £20,000 £1.1bn
Government Plan 2024-27 - Delivering on our priorities
Tax allowances Increasing the rate of Improving standards of Housing and increased by 7.7%. home ownership with rental properties through
Cost of living £10m of government the new landlord licensing
support. scheme.
Implementing a new Supporting technological £4.2m new investment in
economic strategy which innovation through the rural and marine sectors. Economy will help ensure Islanders Impact Jersey scheme.
and Skills enjoy a better standard of
living in 2040 than they
do today.
£2.6m new funding for Expanding the free Continuing investment in Children and frontline services to primary school meals facilities, including Mont a
Families support children and project to all States L Abbe secondary school young people. schools. and Le Squez youth club.
Continuing to develop Developing the Jersey Reinstating £77m
the older persons living Pension Saver to improve government funding to Ageing forum to make sure that financial wellbeing in old the Social Security Fund
population the older community are age. to support the state included in government pension.
decision making.
Continued funding for Focus on recruitment and £24m new funding for Health and reduced GP fees funded retention of frontline staff health service pressures
wellbeing from the Health Insurance in health and education. and public health.
Fund.
Responding to the Delivering the first phase Speeding up Jersey s
Climate Emergency of the Carbon Neutral transition to electric Environment through initiatives such as roadmap to deliver our vehicles through the
the ebike scheme and low overall objective of being Electric Vehicle Purchase carbon heating incentive. a net zero Island by 2050. Scheme.
Partnering with charities Dedicating 1% of Spending a total of £11.7m
and community groups government spending on renovating the Jersey Community to deliver activities that to Arts, Heritage and Opera House.
improve Islanders wellbeing Culture.
through the community
compass scheme.
Government Finances 2024
£286m Health and Community Services
£206m Children, Young People, Education and Skills |
| ||
£160m Treasury and Exchequer* |
|
| |
£107m | Customer and Local Servic | es | |
Spending by Department
|
| |
£77m | Cabi | net Office |
in 2024:
|
| |
£57m | Infr | astructure |
|
| |
£40m | Ju | stice and Home Affairs |
|
| |
£37m | Economic Development, Tourism, Sport & Culture | |
£27m States of Jersey Police £20m Jersey Overseas Aid
| £11m Environment |
| £11m Financial Services |
*Treasury and Exchequer budget £3m Ministry of External Relations
includes £94.9 million grants to
Social Security Fund and Long £43m
Non-Ministerial and Other States Bodies Term Care Fund.
£113m Capital expenditure
in 2024 including:
£45.7m Estates
£30m Infrastructure
£113m £20m IT
£10.6m Replacement assets
£6.7m Feasibility and contingency
£452m expenditure from Social Security Funds
in 2024 including:
£80m
Long Term Care benefits (Long Term Care Fund)
£320m £52m Health Pensions and other benefits benefits (Health
(Social Security Fund) Insurance Fund)
Budget measures for 2024
Measures to support innovation and enterprise
£450,000 • 150% super-deduction for RegTech in tax incentives to grow Jersey's economy investment
• 60-day tax exemption period for short-term business visitors
• Credit-based relief for foreign tax on employment income
Personal income tax thresholds and child allowances
£1,450 £250
Increase for individuals Increase in child allowance
£400
£2,300 Increase in additional allowance Increase for married and
civil partners £ £550
Increase in childcare tax relief £600 £1,400
Increase for second earners Increase in higher childcare tax relief
Alcohol duty Fuel duty
+2p 0p
on a pint of beer per litre
(below RPI increase) (frozen for 2024)
Tobacco duty Vehicle Emissions Duty
30% +£1.38
increase for per 20 pack highest CO2
emitting vehicles
(201g/km or more)
Foreword by the Chief Minister and Minister for Treasury and Resources
Investing now and into our future.
It is our privilege as Chief Minister and Minister for Treasury and Resources to introduce the Government Plan 2024-2027, which reflects the commitment of the Council of Ministers to the well-being and prosperity of our Island community.
The proposals contained in the plan express our ambition to deliver on Islanders' current needs and invest in their future. It puts the needs of Islanders first and supports hard-working individuals and families.
This plan follows the endorsement of the Common Strategic Priorities by the States in October 2022 and builds on the foundation laid out in the Government Plan 2023-2026, as we continue to ensure the prudent and effective allocation of public funds.
We want to ensure that taxpayer's money is spent in a way which reflects our wish to meet new priorities whilst continuing to invest in existing essential services and safeguarding the long-term financial sustainability of our Island. Our focus is on encouraging consistency, resilience and maintaining a steady course with our public finances.
The Government Plan 2024-2027 is linked to individual Ministerial Plans, each developed to outline specific objectives and priorities for 2024. These Ministerial Plans execute the broader vision of this Government Plan, which is to deliver tangible improvements in the lives of Islanders and to create a community where families thrive.
Investing now
Supporting Islanders through the Cost-of-Living crisis:
• Keeping money in Islanders' pockets through increased support and allowances, with a special focus on those most affected by rising prices. Building on tax threshold increases from the previous Government Plan, we are proposing to further raise the threshold before tax is paid – for individuals to £20,000; for married and civil partners to £32,050; and for second earners to £7,950.
• Balancing alcohol duty[1] increases in a manner which recognises the health consequences of alcohol consumption and supports the hospitality industry with below inflation increases.
• After freezing road fuel duties[2] in 2023, fuel duties are frozen once again following an amendment to the Government Plan.
• Continuing to subsidise GP fees[3] through funding from the Health Insurance Fund, making healthcare more affordable for those most in need.
Improving access to housing:
• We are renovating the Assisted Purchase Home Ownership scheme, to help address the Island's housing crisis. New criteria will aim to make homeownership more attainable for a broader range of Islanders, particularly first-time buyers who require financial assistance to enter the housing market.
• Recognising the housing needs identified in the Bridging Island Plan and further supporting our policy response to the Island's housing crisis, we are investing in the Island's surface water and foul sewage drainage network. This Government Plan provides an initial investment of £15.6m to meet the needs of the project in 2024 and 2025.
• We are proposing to increase the first-time buyer stamp duty threshold to £700k, thus easing part of the financial burden and helping people to get on the property ladder.
• Improving standards of rental properties through the new landlord licensing scheme.
• We will develop a scheme to encourage and incentivise right-sizing, to be presented to the States Assembly before 31st May 2024, with the financial implications forming part of the Government Plan 2025-2028[4]
Providing good quality healthcare for the future:
• This Government Plan proposes significant additional investment in the Island's healthcare system, with an increase in spending on health and community services from £249m to £286m.
• In addition to inflation allocations for all departmental budgets, a further £8m per annum has been provided to maintain health & community care standards.
• As part of the turnaround of health and community services a financial recovery plan has been developed and will deliver £25m in efficiencies per year by 2025.
• The financial recovery plan has developed over 50 schemes which are expected to deliver these savings, through focusing on delivering value for money in healthcare services including improved recruitment and retention of frontline staff in health.
• The recovery plan has identified a £15m structural deficit in the financing of the Health and Community Services department. The Government Plan has provided for that legacy underfunding and a further £6m in 2024 whist the financial turnaround is delivered.
• Covid-19 has shown the need for greater resilience and support for the public health function, therefore this plan provides £3m on an ongoing basis. The funding provided for the public health function is predicated upon a freeze on any recruitment within the service, whether due to increases in staff numbers or fulfilment of vacancies, until a full business case for the public health function has been produced, scrutinised, and approved by the States Employment Board.[1]
Delivering public services:
• This Government Plan funds the provision of affordable public services, supporting the sustainable wellbeing of Islanders whilst protecting services from the worst impacts of inflation.
• This includes the provision of education to our children, providing healthcare to Islanders and ensuring public safety through our blue light services and the justice system.
• In addition to the investment set out above, Ministers continue to invest in public services for islanders, by providing an additional £27m per year.
• We are also investing in long-term projects through a £113m capital programme in 2024 including infrastructure and public estate developments.
Investing in our future
Helping children & families:
• Raising childcare allowances to £3,700; with an increase in additional child allowance to £5,550, increasing childcare tax relief to £7,600, and increasing higher childcare tax relief to £19,700.
• Increasing investment in facilities, including Mont à L'Abbé secondary school and Le Squez youth club. Investing £1.7m in running additional specialist children's homes to support our most vulnerable children. Investing £2.6m in frontline services to support pandemic recovery among children and young people.
• Ministers are committed to creating an innovative and inclusive education system to ensure that we have opportunities available for all children and young people to learn, progress and prosper both academically and socially.
• Maintaining investment in the Education Reform and the Inclusion Programme, as well as Early Years and improvements in Children's Social Care, so we continue to ensure all children, young and their families, especially our most vulnerable, can thrive.
• We will review feasibility options for expanding Early Years nursery provision and childcare support to benefit all children in Jersey from nine months to three years old, with a report detailing any action plan from the Government to be presented to the States Assembly before 1st September 2024, and any financial implications forming part of the Government Plan 2025-2028.[1]
• Expanding the free primary school meals project.
Delivering New Healthcare Facilities:
• The Council of Ministers has agreed to proceed under a phased approach to delivering New Healthcare Facilities by spreading multiple projects over a longer period to manage financial and economic risk and enable greater benefit for the local economy.
• This approach allows Ministers and the Assembly the flexibility to proceed with these projects once we are confident they are affordable. It will also provide better opportunities for modern methods of construction and minimise delays in construction due to site size and accessibility.
• £52m in 2024 will allow for the development of the necessary design and planning work to a more advanced stage. We will continue to monitor expenditure carefully whilst delivering the necessary work to provide a robust proposition for the States Assembly to debate in summer next year.
• Delivering New Healthcare Facilities and getting the best possible value for Jersey, without further delay, is a top priority. We are working on the programme, which estimates that the total additional funding to deliver an acute facility at Overdale to be a maximum of £675m and a further £35m to make meaningful progress on development of the plans for future phases over this Government plan period. These are current estimates including provisions for inflation and other contingencies.
Developing our economy and skills:
• Supporting our farmers and fishers with £4.2m investment in rural and marine sectors.
• Investing in innovation and enterprise technology through the Impact Jersey scheme.
• £450,000 in tax incentives to grow Jersey's economy including:
• 150% tax super-deduction for RegTech investment.
• 60-day tax exemption period for short-term business visitors.
• Credit-based relief for foreign tax on employment income.
Creating a more inclusive and vibrant community:
• Partnering with charities and community groups to deliver activities that improve Islanders' wellbeing through the community compass scheme.
• Maintaining 1% of government spending to Arts, Heritage, and Culture.
• Continuing to progress the redevelopment of fort regent.
• Investing a total of £11.7m for renovating the Jersey Opera House.
The Government Plan 2024-2027 is evidence of our dedication to the prosperity, well-being, and sustainable future of our Island and its residents. We are resolute in our commitment to building, investing, and supporting Islanders, both for the present and the generations to come.
Economic Context
The International Economic Outlook
The latest forecast (July 2023) from the International Monetary fund (IMF) has projected a fall in global growth from an estimated 3.5% in 2022 to 3% in both 2023 and in 2024, which remains weak compared to historical standards[1]. International growth levels of around 3% are generally characterised as very poor. Whilst growth appears to have stabilised in emerging economies, growth in advanced economies may fall in 2023, as monetary policy continues to tighten to combat inflationary pressures, before stabilising through 2024. Downside risks to the global economy include persistent high inflation, geopolitical and economic factors including the ongoing war in Ukraine, a slowdown in China's growth and financial sector turbulence.
Inflation in the UK has peaked and has been falling through the first half of 2023 (as energy and food prices ease). However, it remains above the Bank of England's target of 2% and with some concern on the trajectory of core[2] inflation, is likely to now remain so for longer than previously projected and well into 2024. As such, the Bank of England has raised the Bank Rate five times[3] in 2023 with latest forecasts suggesting that inflation will return to the target rate of 2% by the middle of 2025. Both the continuing inflationary pressures and the higher interest rates pose risks to the economy of Jersey, with interest rates also providing some opportunity for the financial services sector.
Figure 1: Economic growth forecasts for advanced and emerging and developing economies. Source: International Monetary Fund, World Economic Outlook July 2023
Jersey's Economic Outlook
Despite the poor global outlook and a weak UK economy, Jersey's economy continues to prove resilient to these negative macroeconomic pressures. The 2021 Gross Value Added (GVA) for the island was £5,132m with a particularly strong rebound from the construction sector. The size of the economy has returned to slightly below 2019 levels in 2021 and is expected to have grown strongly in 2022[4] and remain positive until 2025.
Increases in the Bank of England's Bank Rate are expected to benefit growth in the financial sector in 2022 to 2024 as net interest margins widen, however, recovery in the hospitality and other non-finance sectors may be hampered due to high input costs and other risks associated with low business investment and reduced household spending.
Following the peak of 2,290 registered individuals in May 2020, the number of people Actively Seeking Work (ASW) continues to remain low and currently stands at 610[5] as of June 2023, indicating a position of near-full employment in the Jersey economy. This reflects wider trends across Europe and the UK of high levels of employment, without significant growth in productivity or economic activity, which may keep inflation higher for longer.
Figure 2: Actively Seeking Work (non-seasonally adjusted). Source: Statistics Jersey
The Business Tendency Survey (BTS) (June 2023[6]) provides a real time indicator for business confidence and output and showed that business activity was strongly positive for the finance sector and neutral for non-finance. The hospitality sector was particularly negative as high inflation and cost-of-living affects behaviour of Islanders and tourists. High input costs and product prices were consistently felt across sectors.
Figure 3: Weighted net Balance of responses to Business Activity' question of the Business Tendency Survey, by sector. Source: Statistics Jersey
The Fiscal Policy Panel (FPP) provided an updated set of economic assumptions[7]. Real GVA growth has been uprated since its annual report in November 2022. Higher economic activity for 2022 to 2024 is largely driven by financial services profits and higher market expectations for interest rates. Inflation in Jersey peaked at 12.7% in Q1 2023 but is expected to fall more gradually. The FPP has highlighted the risk for Jersey that its tight labour market may lead to higher wages, which in turn could cause inflation to be higher for longer.
Figure 4: Economic forecast showing changes in GVA (Index 2019=100). Source: Fiscal Policy Panel
Figure 5: FPP inflation forecast (July 2023)
Figure 6: House Price Statistics- Annual House price Index, Retail Price Index and Average Earnings Index. Source: Statistics Jersey
There are ongoing issues within the economy around the affordability of housing. Figure 6 above shows the widening of the gap between wage growth and housing price growth over the last 25 years which has accelerated dramatically in the last 4 years. This causes significant pressure for the population and acts as a blocker to growth as well as causing difficulties for individuals and families. However, the FPP has forecast a cooling in house prices as mortgage costs increase, reducing the demand for properties.
Fiscal Framework
The Fiscal Policy Panel is established by the Public Finances Law, which enshrines its independence and sets requirements for it to provide an annual report on Jersey's economy and Government finances, and to inform the preparation of the Government Plan. The Council of Ministers or the Minister for Treasury and Resources can also request other reports on specific subjects.
The FPP will continue to be responsible for monitoring the application of the fiscal guidelines.
The fiscal framework remains an important pillar of Jersey's economic and fiscal policy and sets the medium and long-term aims that help to inform budgetary decision making, with particular regard to the balance of income and expenditure (i.e. budget deficits or surpluses).
The key guidelines identified in previous Government Plans are to:
• Seek to increase the Strategic Reserve over the long term and public sector net worth, while heeding the advice of the FPP on borrowing and net financial assets.
• Run a primary structural current balance or surplus in the long-term until the Strategic Reserve is judged large enough to meet its objectives.
• Borrow only to finance investment (or refinance liabilities), except under times of economic duress, and monitor the impact on net financial assets.
The Fiscal Framework continues to be kept under review and will be updated if necessary.
Sustainable Wellbeing
Island Outcomes and Sustainable Wellbeing
In the Common Strategic Policy 2023-26, the States Assembly endorsed the Island Outcomes identified during the 2018 Future Jersey consultation. The Council of Ministers has committed to strive to achieve the long-term vision of Future Jersey and work towards delivering the ten Island Outcomes arising from it. The Island Outcomes are split across three wellbeing aspects: Community, Economic and Environmental.
Similarly, the Public Finances (Jersey) Law 2019 requires the Council of Ministers to take into account the sustainable wellbeing (including the economic, social, environmental and cultural wellbeing) of the inhabitants of Jersey ("Islanders") over successive generations when preparing the Government Plan each year.
Progress over time towards the Island Outcomes and the sustainable wellbeing of Islanders over successive generations is monitored using the Island Indicators which are updated over time and published on the Jersey Performance Framework.
Jersey Performance Framework
The Jersey Performance Framework is used to report on the Government of Jersey's performance. It is underpinned by a shared ambition for the sustainable wellbeing of current and future Islanders.
The Jersey Performance Framework comprises:
• The Island Outcome Indicators; and
• The Service Performance Measures
The Common Strategic Policy (CSP) included a commitment to improve the relevance and presentation of the indicators. Work is underway to review and refresh the Island Outcome indicators and to improve their presentation on the website.
Common Strategic Policy 2023-26
In the Common Strategic Policy 2023-26, the Council of Ministers established their CSP priorities. These priorities are delivered through Ministerial Plans which are updated on an annual basis.
Ministerial Plans for 2024 are presented alongside this Government Plan. They set out Ministers' priorities and the legislative programme for 2024.
Sustainable Wellbeing and the Government Plan
This Government Plan supports the sustainable wellbeing of Islanders in a number of different ways.
When considering policy issues within their remit, Ministers take into account the well-being of Islanders and the long-term impacts of the policy. This is expressed through policy documents published by Ministers. Information on key public policies is published on gov.je. This includes a description of the policy area, links to relevant policy documents and the applicable Island Outcome Indicators that are used to track progress.
The Government Plan contains approvals for the Council of Ministers' income and spending proposals for the next 4 years. These take into account both the sustainable wellbeing of Islanders and the sustainability of public finances (also a requirement of the Public Finances Law).
The Government Plan approves heads of expenditure, the majority of which are used to fund the provision of public services which support the sustainable wellbeing of Islanders. This includes, for example the provision of education to our children, provide healthcare to Islanders and ensure public safety through blue light services and the justice system.
Further detail on the amounts allocated to each head of expenditure is set out in the public sector spending section of this report.
In addition, new activities that receive funding in the Government Plan are required to complete a business case. The business cases set out the objectives, benefits and performance measures for that particular activity. The business cases help Ministers to balance competing demands for funding.
Taking all this into account, the link between the three wellbeing aspects (Community, Economic and Environmental) and some of the specific activities in the Government Plan is set out below.
Risk
Alongside the sustainable wellbeing of the inhabitants of Jersey over successive generations, it is also important that the Council of Ministers take into account the risks to Jersey and to the running of the Government of Jersey when considering how best to prioritise and allocate its resources.
Community Wellbeing
Assurance on the quality and safety of HCS care. A number of reviews, including most recently a review into rheumatology services, and the Mascie- Taylor report have revealed that despite the hard work of staff, there is no effective assurance system in place, data quality is poor and serious longstanding cultural issues remain unresolved. The Mascie- Taylor report identified 61 recommendations to be addressed. These recommendations have been incorporated into a significant improvement programme for secondary care.
Ensuring we have sufficient capacity for children's residential care. Sufficiency planning to meet demand for children receiving residential care is a priority and is an identified principal corporate issue. This Government Plan therefore makes provision for the funding of an additional two children's homes to help meet the need under the Social Care Reform Programme Phase 2.
Funding has also been made available from 2024-27 to meet priorities in the Children, Young People, Education and Skills Department (CYPES) and for young people not in employment education or training.
There is also additional capital funding being made available within this Government Plan for school and educational developments.
Economic Wellbeing
The Island Outcomes on affordable living, business environment and jobs and growth have been impacted by external macroeconomic and geopolitical pressures since 2022. This is likely to remain a primary area of risk focus for governments across the world into 2024-25 according to the World Economic Forum in its most recent Global Risks Report.
Inflationary Pressures. Global and UK inflationary pressures continue to affect the Jersey economy in 2023 and are particularly impacting on the most disadvantaged in society. This is reflected in the fact that it is still currently a principal issue on the Corporate Risk register. The Government has previously put mitigations in place via the 100 Day Plan, Cost of Living Strategy Group, mini budget and the Government Plan 2023-26. This Government Plan also proposes increases to tax allowances and childcare allowances in line with increases in average earnings.
Loss of Economic Prosperity. A failure to sustain, diversify and grow could impact economic prosperity negatively. Consequential damage could be to the public finances and ability of the Government to deliver high quality and increasingly costly public services (such as health) and support. Mitigations include diversification of the local economy; delivery of the Financial Services policy framework; and the Future Economy Programme (Economic Framework). Ensuring that economic growth is a priority of government, led by the Economy Department will help mitigate these medium term and longer terms threats that the government faces.
Environmental Wellbeing
A risk of lack of capacity for liquid and solid waste disposal. The Government Plan includes mitigations through investment in liquid waste infrastructure and in other key infrastructure such as the La Collette waste site. Other mitigations include engagement with industry to reduce incoming solid waste volumes.
Corporate Performance
Like all governments, Jersey's faces the constant threat of a cyber-attack and, as a consequence, is undertaking targeted action to enhance our technology estate, data management and information security against a backdrop of increased global cyber security risk from hostile state and criminal activity. Other measures to mitigate potential loss include the establishment of the Cyber Security Centre (CERT), regular threat monitoring and horizon scanning.
The Government Plan 2024-27 makes further provision under Cyber Security Programme 2024-27 to help to mitigate the Corporate Risk of Cyber Security.
An increasing risk that there could be service disruption and an impact on the ability to provide quality services to Islanders as a result of insufficient resources allocated to property maintenance. Resources are being diverted from reactive maintenance to allow greater effort to keep Government properties compliant with legislation and statutory inspections. Assets are being managed, however there is a risk that this could result in decaying asset values. Other potential consequences are improvement and enforcement notices; health and safety incidents; harm to people/loss of property; litigation and reputational damage.
To mitigate these various risks, departments have identified the highest priorities alongside work undertaken through a Government wide condition survey of the estate. In identifying the highest priorities, additional funding is being made available to both enhance reactive maintenance budgets and renovate or replace ageing equipment and buildings to enhance their useful life and prevent further decay in the overall estate.
Effective workforce planning and recruitment and retention practice. Resourcing challenges can impact service quality and capacity, result in higher costs, and negatively affect the government's reputation as an employer. Mitigations include improving recruitment processes and systems; workforce and succession planning; alignment with the Government Plan; Exit and Be Heard surveys; People and Culture Plans and employee led networks.
Financial Strategy
Financial Principles
The Council of Ministers agreed to maintain the following financial principles to be used as a framework for decisions making in preparing this Government plan.
1. Sustainability, Stability and Wellbeing |
|
1.1. The Government Plan must take into account the medium-term and long-term sustainability of the States' finances |
1.2. The Government Plan must take into account the sustainable wellbeing (including the economic, social, environmental and cultural wellbeing) of the inhabitants of Jersey over successive generations |
1.3. The Government should plan to rebuild the Stabilisation Fund in line with Fiscal Policy Panel advice |
1.4. The Government should plan to increase the size of the Strategic Reserve in line with Fiscal Policy Panel advice |
1.5. In the short-medium term action should be taken to preserve a minimum viable balance on the Strategic Reserve to be available whilst the Reserve is grown in the long term |
2. Funding Public Services through Balanced Budgets |
|
2.1. Operating budgets after depreciation should be balanced across the plan |
2.2. Departmental base budgets should be maintained in real terms, except where changes to services or efficiencies have been identified and agreed |
3. Affordable and Deliverable Investment |
|
3.1. Additional funding for services should only be allocated if a source of funding has been identified and agreed |
3.2. Any investment in services or on projects, should have a credible delivery plan, to avoid allocating more funds than required |
4. Delivering Value for Money |
|
4.1. The Government should continue to identify and deliver recurring efficiencies every year, but only rely on the reduction in spend if it is clear how they will be achieved |
4.2. Government should invest where required to improve value for money, where benefits can be clearly demonstrated |
4.3. Expenditure and Assets should support outcomes for Islanders, with returns (fiscal or outcomes) maximised across the plan to support effective and efficient delivery of strategic objectives |
5. Reasonable Fees and Charges |
|
5.1. Reasonable contributions should be made to the full cost of providing services. • Where a service is funded via charges rather than general taxation, the general approach is to set charges to recover full costs of services – neither profiting from nor subsidising consumers • There is scope for charging more or less than this provided that Ministers choose to do so, for example to encourage or discourage consumption • Public sector organisations may also supply commercial services on commercial terms designed to work in fair competition with private sector providers |
5.2. Decisions on charging policy should be made with the same care, and to similar standards, as those on taxation |
5.3. The anti-inflationary strategy should be considered when reviewing any new or existing fees and charges |
6. Restrained approach to Borrowing |
|
6.1. Any additional borrowing should be due to a clear need, with an agreed funding strategy, and made in line with the published Debt Strategy, for the following purposes only: • Capital Investment in public sector assets for a non-financial return, but which provide public services (e.g. a hospital or school) • Capital Investment in public sector assets for a financial return (e.g. housing or office space), where an income stream is generated • Temporary costs of the economic cycle, and in times of economic duress, through lower revenues and higher spending (e.g. passive fiscal stimulus through use of "automatic stabilisers" and exceptional costs associated with Covid-19) • Active fiscal stimulus – short-term, targeted, and timely (e.g. financing the Fiscal Stimulus Fund) • Deferral of income and cashflow, although potential losses and financing costs need to be identified. Alternatively, overdraft facilities could be used |
6.2. Government should retain the capacity to borrow to support economic stability in the event of large shocks or times of economic duress (cyclical deficits), as an additional option to the use of reserves |
6.3. Government should plan to eliminate borrowing relating to the costs of Covid-19 as soon as practicably possible |
6.4. Government should not plan any action that would undermine the Island's credit rating (and comply with Maintenance of Jersey's credit rating' P.18/2022[8]) |
7. Preserving the value of our Balance Sheet |
|
7.1. The Net Asset Value of Government should be maintained or increased |
7.2. Government should take a strategic approach to assets, balancing spend on maintenance, improvements and new assets |
Tax Policy Principles
The following tax policy principles established in previous Plans continue to be used in this Plan.
1. Fair and sustainable |
|
1.1 Taxation must be necessary, justifiable and sustainable |
1.2 Taxes should be low, broad, simple and fair |
1.3 Everyone should make an appropriate contribution to the cost of providing services, while those on the lowest incomes should be protected |
2. Support broader Government Policy |
|
2.1 Taxes must be internationally competitive |
2.2 Taxation should support economic, environmental, and social policy |
3. Efficient and effective |
|
3.1 Taxes should be easy to implement, administer and comply with, at a reasonable cost |
3.2 No individual tax measure will meet all these principles. But overall, the Island's tax regime should represent a sustainable balance of them |
Financial Strategy for 2024-2027
This plan has been prepared in the context of ongoing economic uncertainty, with the global economy still feeling the impact of the ongoing war in Ukraine, the aftermath of the Covid-19 pandemic, and other geopolitical developments. We expect to see inflation persisting at higher levels for longer, driving the expectation of interest rates remaining higher for longer than anticipated in last year's plan.
Whilst these changes have resulted in an additional improvement in the forecasts for Government income, it also places pressures on both Government expenditure and Islanders' finances.
In developing the plan, the Council of Ministers have again had to contend with significant competing pressures and have considered the recommendations from the Fiscal Policy Panel.
In particular in making their decisions, a balance between the need to:
• mitigate the impacts of the ongoing cost of living crisis.
• meet the housing needs of Islanders.
• ensure the Island can recruit and retain a suitable workforce.
• invest in the economy to ensure Islanders' future prosperity.
• protect key government services from the impacts of rising costs and provide targeted investment.
These priorities are in natural tension, both in terms of the availability of financial resource, and the impact that growth in the public sector has on the availability of labour and housing in the wider economy. The plan presented provides an appropriate balance across all of these considerations.
The financial strategy for 2024-2027 builds upon the previous Government Plan and applies the agreed financial principles to these competing priorities. The key elements of the medium-term financial strategy for the Government 2024-2027 are:
• This is an affordable and deliverable plan, with public finances balanced across the plan period.
• Following the mini-budget in 2023, this plan continues support for more vulnerable Islanders impacted by the cost-of-living and includes budget measures that are designed to give back money to taxpayers. Through increasing personal and child allowances, this plan puts back £23m into Islanders' pockets.
• The plan addresses underlying structural deficits in Health and Community services that cannot be addressed purely through the Financial Recovery Programme (FRP), which will deliver substantial efficiencies within healthcare services over the coming 2 years.
• The plan incorporates budget measures for innovation and investment in economic growth, to improve productivity and ensure our future prosperity.
• The plan includes vital investment in 2024 and 2025 in our liquid waste infrastructure, allowing the infrastructure department to rapidly progress with key projects to address existing network issues and ensure that the network has sufficient capacity to support the delivery of new homes. This is in advance of a sustainable funding mechanism to be agreed in the next Government Plan, for necessary future investment.
• There is a continued focus on ensuring that government services represent good value, through the ongoing Value for Money programme.
• Work continues to drive forward the delivery of New Healthcare Facilities for the Island. This plan includes approvals to progress with work in 2024, with proposals to be brought to the States Assembly next year pending completion of more detailed work, including a business case.
The plan also sets out longer-term strategic direction in a number of critical areas:
• It establishes the long-term financing strategy for the Carbon Neutral Roadmap, setting out how the costs of transition to net zero with be met over the next 30 years.
• The States grant[1] to the Social Security Fund will be reinstated in full during the plan. Following an amendment to the Government Plan, the grant will be reinstated at the full formula value for each year of the plan. In years 2024 and 2025, this will be part funded through a transfer of £20m from the Strategic Reserve in both of those years, to be repaid in 2027.
• It provides an update on progress in developing a sustainable model for health funding, which will include consideration of the future of the Health Insurance Fund.
Sustainable Public Finances
The Public Finances (Jersey) Law 2019 (PFL) sets out a requirement for each Government Plan to have regard to the long-term sustainability of the Island to ensure that we safeguard it for future generations.
This plan delivers budgets that are balanced across the plan. This is important to ensure that we are spending within our means and making adequate provision for the replacement of our assets. Whilst the higher interest rates now expected have improved income forecasts, the accompanying higher inflation also places additional pressures on expenditure. This plan takes actions to retain balanced budgets across the period of the plan, with a modest deficit in 2024 created by temporary baseline funding for Health and Community Services. This is then offset by modest surpluses in subsequent years, which are used to fund the capital programme.
| Summary Forecast Operating Balance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | |||||||||
£'000 |
| Estimate | Estimate | Estimate | Estimate | |||||||||
General Revenue Income |
| 1,190,589 | 1,243,596 | 1,279,640 | 1,327,017 | |||||||||
Net Revenue Expenditure |
| 1,162,591 | 1,199,402 | 1,202,037 | 1,224,405 | |||||||||
Net Operating Surplus/(Deficit) |
| 27,998 | 44,194 | 77,603 | 102,612 | |||||||||
Depreciation |
| 56,131 | 57,460 | 57,444 | 57,444 | |||||||||
Forecast Operating Surplus/(Deficit) |
| (28,133) | (13,266) | 20,159 | 45,168 | |||||||||
Table 1: Forecast Operating Balance |
|
|
|
|
|
If funds become available through additional income or reduced expenditure over the period of the plan, these will be used to reduce borrowing and/or begin to rebuild the Stabilisation Fund in line with the advice of the Fiscal Policy Panel (FPP). This has been formally recognised through the inclusion for approval of transfers to the fund, contingent on the monies being available, at the end of 2023 or 2024.
The value of the Strategic Reserve is forecast to be preserved, subject to short-term volatility, and Ministers will continue to consider options to protect and grow the fund over the long term.
Ministers are also committed to ensuring that the Social Security Fund remains sustainable for future generations. The actuarial review of the Social Security Fund was completed in May (R.96/2023[1]), with the financial projections having improved since the last review at the end of 2017. The review concludes that the Fund remains financially healthy overall, with sufficient funds throughout the 60-year projection period (under all migration scenarios except for nil migration). Current rates of contributions and benefit are forecast to be sustainable in the short to medium term (subject to sufficiently high in-migration levels).
The annual States Grant[2] payment into the Social Security Fund will be reintroduced in 2024 and paid in full across the plan period.
The Health and Social Services Minister is currently undertaking a wide review of the Island's health and care cost, which will inform options for the future funding of our whole health and care system. This work will continue throughout 2023 with options being brought to the States Assembly in 2024.
The phased approach to providing New Healthcare Facilities is also designed to ensure that each phase of the project is only committed to once an affordable financing strategy has been determined. This protects the public finances from being over-committed, helping ensure their long-term sustainability.
General Revenue Income
The Government funds ongoing annual expenditure and investment in assets through three main sources: general tax revenues, other government income and departmental income. These three sources of revenue are paid into the Consolidated Fund.
General Tax Revenues
General tax revenues provide the main source of funding for the Government, with four main tax types.
Income tax | Tax is levied on the income of individuals and non-individuals (for |
| example, companies). An individual or couple with income above |
| the personal income tax thresholds will pay tax at a rate no higher |
| than the 20% standard rate of tax. The actual effective rate of tax |
| is determined by income levels and eligibility for reliefs and |
| allowances. Companies pay income tax at 0%,10% or 20% |
| depending on the activities they undertake. |
|
|
Goods and Services | Goods and Services Tax (GST) is a tax on the supply of goods |
Tax | and services in Jersey. GST is charged at 5% on the majority of |
| goods and services supplied in Jersey, including imports. |
Impôts (excise) | Impôt (excise) duties are levied on the importation of specific |
Duties | items, namely road fuel, alcohol, tobacco and motor vehicles. |
Stamp Duty, Land | Stamp duty is levied on the purchase of properties bought on the |
Transactions Tax, | Island and registration of wills of Jersey immovable property. |
and Enveloped | Land Transactions Tax (LTT) is levied on share transfers involving |
Property Transaction | shares which give the owner the right to occupy property in |
Tax | Jersey. Enveloped Property Transaction Tax (EPT) is levied on |
| transactions in which control of an entity that owns certain land in |
| Jersey is transferred from one person to another. |
Other Government Incomes
The Government also receives income from four other sources, as set out in the table below.
Island-wide rates | Received as part of the rates system and collected by parishes. |
Income from | Received from States-owned entities including utility companies. |
dividends and |
|
returns |
|
Non-dividends | Includes other income received from tax penalties, Crown |
| revenues, miscellaneous interest, fees and fines as well as |
| investment returns from the Consolidated Fund and Currency |
| Notes Fund. |
Returns from | This income stream reflects the income contribution made from the |
Andium Homes | housing stock that was transferred to Andium Homes. |
Departmental Income Sources
In addition to amounts paid directly to the Consolidated Fund, Government departments receive money from fees and charges for individual services. These amounts are included within individual net revenue expenditure allocations and are estimated at £107m in 2024. The number of different sources of income reflects the variety of services provided by the Government. This includes fees for private patients at the hospital, school fees, fees for the disposal of inert waste, planning fees, and income from rents and our sports facilities. This income is included in department Heads of Expenditure.
Special Funds, including social also receive income designated to them, as well as the investment returns on fund balances. This is then used for expenditure in line with the purpose and objectives of the funds.
Latest Income Forecasts
The Income Forecasting Group (IFG) advises on the forecasts of all States income from taxation and social security contributions. Membership of the group includes senior civil servants, the Government's chief economic advisor as well as at least two external members.
Since the summer 2022 forecast used as the basis for Government Plan 2023-2026, the IFG have produced two further income forecasts, in spring 2023 and summer 2023[1]. The summer 2023 forecast is the most recent forecast, reflecting the latest economic assumptions produced by the independent Fiscal Policy Panel in July 2023. The forecast is published alongside the Government Plan. The IFG also produced a spring 2023 forecast published as R.89/2023[2].
The global macroeconomic outlook continues to evolve in a rapidly changing environment. Since summer 2023, IFG revised forecast report the global economy has remained weak, with the continued war in Ukraine and a slowdown in China's growth contributing to the continued rising inflation.
The FPP economic assumptions reflect the latest local and international developments to July 2023. The main variations to the economic assumptions used in the IFG forecast for summer 2023 since the last Government Plan include:
• Higher interest rates and a reprofiling of the growth from financial services profits leading to further growth in 2022.
• Higher forecast inflation in 2023 and 2024, with inflation projected to fall steadily after peaking at 12.7% in Q1 of 2023 to reach 2.8% in Q4 2024. This is due to the expectation that inflation will remain higher for longer.
• Average earnings are projected to rise almost alongside inflation, due to a tight labour market keeping demand for skills high and thus wages reflecting this.
• Employment is assumed to rise consistently in the financial services sector, whilst the non-finance sector is expected to see a period of above trend growth reflecting strong post-pandemic recovery.
• Housing transactions are forecast to fall by 50% in 2023, with house prices also expected to slightly decrease by 2% in 2023, due to the impact of rising interest rates on mortgages.
The IFG's summer 2023 forecast has been developed as a central forecast' to represent the IFG's view of the most likely outcome.
The IFG's latest forecast of total States income reflects:
• The FPP's economic assumptions of July 2023 and other related economic data from Jersey.
• General revenues income outturn for 2022.
• Initial information on general revenues income for the first two quarters of 2023.
• Forecasts from Treasury for other income; and
• Market intelligence from the IFG.
The summer 2023 forecast is the latest forecast produced and covers the years 2024-27, the forecast assumes standard tax policy where relevant.
| IFG Income Forecast |
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | |
£'000 |
| Estimate | Estimate | Estimate | Estimate | |
Income Taxes |
| 843,000 | 884,000 | 916,000 | 957,000 | |
Goods and Services Tax (GST) |
| 121,000 | 124,000 | 127,000 | 131,000 | |
Impôts Duties |
| 73,225 | 75,627 | 75,098 | 74,686 | |
Stamp Duty |
| 39,756 | 45,606 | 55,506 | 57,980 | |
General Tax Revenue - IFG Forecast |
| 1,076,981 | 1,129,233 | 1,173,604 | 1,220,666 | |
Other Income |
|
|
|
|
| |
- Island-Wide Rates |
| 17,300 | 17,439 | 17,648 | 18,071 | |
- Dividend Income |
| 22,231 | 22,517 | 13,976 | 11,379 | |
- Income from Andium Homes |
| 29,715 | 30,252 | 30,476 | 30,546 | |
- Other Non-dividend Income |
| 20,343 | 19,561 | 18,797 | 18,806 | |
States Income - IFG Forecast |
| 1,166,570 | 1,219,002 | 1,254,501 | 1,299,468 | |
States Income - IFG Summer 22 Forecast |
| 1,139,257 | 1,188,953 | 1,229,628 | 1,229,628 | |
IFG Forecast Variation % |
| 2.4% | 2.5% | 2.0% | 5.7% | |
Table 2: IFG Income Forecast |
|
|
|
|
|
£ Millions IFG Forecast Range 1,500
1,400 1,300 1,200 1,100 1,000 900
800
2022 2023 2024 2025 2026 2027 Central Upper Lower Summer 2022
Figure 7: Range of IFG Income Forecast Spring 23. Source: IFG
The overall changes from the summer 2022 forecast are:
Personal Income Tax
The forecast for personal income tax has increased for each of the plan years. This is due to an improvement in tax outturn data as a result of higher economic activity, as well as the latest FPP economic assumptions with an upwards revision in the forecast assumptions driving the personal tax forecast. The forecast takes into account the policy changes as a result of the mini-budget measures in 2022, to increase personal allowances by 12%. In addition, the IFG have revised the forecast up from the central scenario. This revision is based on industry insight and expectation that remuneration across the economy will be higher than the FPP average earnings assumption. The IFG noted that higher profits in the financial sector are leading to remuneration increases that are higher than the FPP assumptions, and that pay increases in the non-financial sector may be closer to Retail Price Index (RPI) inflation.
Corporate Income Tax
Corporate income tax remains more or less in line with the summer 2022 forecast, with a reprofiling of growth in the financial services profits, now expected to grow by 50% in 2022. The forecast for corporate income tax from non-financial services has remained stable, with financial services being the majority of corporate income tax collected.
GST and International Services Entity Fees
The forecast for Goods and Services Tax (GST) has increased in each year of the plan with an increase in outturn data for 2022, expected to carry through into the forecast for 2023. The FPP's economic assumptions for compensation of employees, the main determinant of GST receipts have been revised upward and are the main driver for the increase in forecast GST receipts. The forecast also incorporates the increased receipts from the lowering of the de minimis level from £135 to £60 from 1 July 2023, as well as the registration of offshore retailers.
Impôts Duties
Impôts (excise) duty reflects a decrease in the plan years from the Summer 2022 forecast. This is driven predominantly by worse than expected receipts in 2022. The Covid-19 pandemic bought considerable volatility in the forecasting of impôts duty for the years 2020- 22 due to changes in consumer behaviour, consumption, and travel. The forecast now predicts a return to pre-pandemic long-term trends.
Stamp Duty
Stamp Duty has been revised to incorporate the updated FPP economic assumptions. The Stamp Duty forecast has decreased significantly from Summer 2022, with housing transactions forecast by the FPP to be down by 50% in 2022, as well as a 2% reduction in house prices. Transactions are currently expected to return to pre-pandemic levels by 2026, however there remains increased uncertainty around the impact of higher interest rates on the housing market.
One-off Dividend Income
The additional planned special dividend payment from Jersey Telecom (JT) included in Government Plan 2023-2026 has been reprofiled, with £10m of the £20m planned to be paid in 2023, profiled over the plan period. The payments continue to be funded through the retained proceeds of the sale of the Internet of Things (IoT) element of the company.
Budget Proposals
Income tax (personal taxation) exemption thresholds and child allowances
Income tax exemption thresholds set a limit below which an individual, married couple or couple in a civil partnership do not pay income tax or Long-Term Care (LTC) contributions. Other family circumstances may increase an individual's or couple's exemption threshold through additional allowances, namely:
• Second earner's allowance, available when spouses or civil partners who are taxed as a married couple or civil partnership are both working or receiving certain pension income, equalising their tax treatment with couples who are taxed independently.
• Child allowance, available to individuals or couples for each child until they finish compulsory education.
• Additional allowance in respect of children, available to single parents, unmarried couples, and married couples and civil partners where one is incapacitated.
• Childcare allowance, available to individuals or couples for the actual amount paid for care of a child under 12 by a registered nursery, nursery class, registered day carer or an accredited nanny, subject to the allowance cap. A higher cap is available for children under 4 years of age.
Last year, the Council of Ministers raised the income tax thresholds and child allowances by 12%, an amount greater than inflation, in support of households facing a higher cost of living. This year, Ministers are reverting to the long-standing policy to uprate the main tax allowances by the lower of the growth of June RPI and average annual earnings, as published in August. Accordingly, thresholds and allowances will increase by 7.7%, in-line with average earnings. In addition to reverting to the long-standing policy, Ministers will also increase the child allowance and childcare allowance by 7.7% in response to the higher cost of living.
Over 90% of taxpayers will benefit from the increases to the income tax thresholds (the proportion of taxpayers who pay at the marginal rate).
Income Tax Exemption Thresholds
Tax 2023 2024 Proposed Reduction
£ Actual Proposed Increase @ 26% Single person 18,550 20,000 1,450 377 Married couple/Civil partnership 29,750 32,050 2,300 598 Second earners' allowance 7,350 7,950 600 156 Child allowance 3,450 3,700 250 65 Additional allowance in respect of children 5,150 5,550 400 104 Childcare 7,050 7,600 550 143 Childcare (enhanced) 18,300 19,700 1,400 364
Table 3: Income Tax Exemption Thresholds
The culmination of recent increases in exemption thresholds places Jersey's relief considerably higher than the personal allowances in Guernsey, the UK and Isle of Man.
Single Person Exemption Thresholds Comparison
Jersey Guernsey UK Isle of Man
£ 2024 2023 2023/24 2023/24 Single person 20,000 13,025 12,570 14,500
Table 4: Single Person Exemption Thresholds Comparison
Impôts (Excise) Duties
Ministers' proposals for excise duties on tobacco, alcohol, road fuels and motor vehicles, if approved by the Assembly, will take effect at midnight on 31 December 2023.
Tobacco
Following the recommendation of the Public Health Directorate, Ministers are proposing to increase duties on tobacco products by 15.9%, which is the sum of June 2023 RPI (10.9%) and an additional 5% escalator. Cigars will be subject to an increase of 18.9% in line with existing policy to close the gap between the duty charged on cigars and cigarettes, bringing the cigar duty rate gap to £82.90 per kg in 2024, compared to £87.30 per kg in 2023.
The proposed increases in tobacco duty for 2024 would see a £1.38 increase in the excise tax on a standard packet of 20 cigarettes (from £8.71 to £10.09 per packet). The increase on hand-rolling tobacco of 15.9% sees a £5.84 increase in a 50g pouch (from £34.83 to £40.37 per pouch).
Alcohol
Jersey has amongst the highest levels of alcohol consumption across OECD countries. At the same time, the hospitality industry continues to face challenges. Following last year's alcohol duty freeze, Ministers are proposing to strike a balance between the public health
goals of ensuring that the price of alcohol does not become cheaper relative to other goods and the Government's support of the hospitality industry by raising duties by 4.5%[3], which is 6.4 percentage points below the growth in RPI.
Fuel duty
Following the freeze on road fuels duties in 2023 to help with the cost of living, fuel duties are once again frozen in 2024[4] following an amendment to the Government Plan.
Ministers remain firm in their commitment to allocating 9 pence per litre from fuel duty receipts into the Climate Emergency Fund.
Proposed Changes in Impôts (Excise) Duties
2023 2024 Proposed Goods Duty Rates £ Duty Rates £ Increase %
Cigarettes – per kg 696.54 807.29 15.9% Hand rolling tobacco – per kg 696.54 807.29 15.9% Cigars – per kg 609.24 724.39 18.9% Spirits 40% abv – litre per alcohol 43.50 45.46 4.5% Beer (2.8% to 4.9% abv) - per hectolitre 70.64 73.82 4.5% Unleaded fuel – per hectolitre 63.89 63.89 0%
Table 5: Changes in impôts (excise) duties
Biofuels
Ministers propose to reduce fuel duty by 9 pence per litre on specific biofuels to support the transition to greener transportation. The reduction in fuel duty only applies to Hydrotreated Vegetable Oil (HVO) which is available locally as a renewable diesel. Other types of biofuels, including fuels blended with fossil hydrocarbons, will not benefit from the reduction. The cost to the Exchequer would be approximately £85,000 per annum.
The 9 pence per litre reduction of fuel duty on biofuels is representative of the 9 pence per litre hypothecated to the Climate Emergency Fund.
Vehicle Emissions Duty
Vehicle Emissions Duty (VED) is charged when a vehicle is first registered in the Island. The amount of VED payable depends on the vehicle's CO2 emissions data, meaning that the charges are higher for the most polluting vehicles.
From 2024, it is proposed that electric vehicles (EVs) and hybrid vehicles that emit small amount of emissions are subject to a nominal VED charge in support of fairer tax contributions in respect of all emitting vehicles. A new band of 1-50g of CO2 will be introduced, which will charge VED at a rate of £35.
VED charges will increase for nearly all vehicles, with the greatest increases applying to the most polluting vehicles. From 1 January 2024, the highest emission band will be increased by 30% with lower increases for vehicles in the less polluting bands. The Government will continue to keep VED rates under review in future years to encourage the importation of more efficient petrol and diesel vehicles, as well as EVs.
| Vehicle Emissions Duty |
|
|
|
|
|
CO2 Mass Emissions (grams) |
| 2023 Actual | 2024 Proposed |
| Proposed Increase % | |
0 |
| - | - |
| - | |
1-50 [new rate band] |
| - | 35 |
| - | |
51-75 |
| 73 | 73 |
| - | |
76-100 |
| 218 | 240 |
| 10% | |
101-125 |
| 383 | 422 |
| 10% | |
126-150 |
| 621 | 715 |
| 15% | |
151-175 |
| 1,188 | 1,367 |
| 15% | |
176-200 |
| 3,500 | 4,200 |
| 20% | |
201 or more |
| 6,105 | 7,937 |
| 30% | |
Table 6: Vehicle Emissions Duty |
|
|
|
|
|
Budget Measures for Innovation and Enterprise
Jersey businesses continue to attract global talent and pioneer advancement across a range of sectors. However, like businesses across the globe, they face a rapidly evolving technological landscape, a shifting regulatory environment and increasingly tight labour conditions. This fast pace of change brings great possibility and future opportunity for Jersey, but only if we are all properly prepared – businesses, Government, Regulators and Islanders, working together.
Later this Autumn, the Government will be publishing a Future Economy Programme that will explore these themes in more detail. In the meantime, Government Plan 2024-2027 introduces a set of initial tax measures that are aimed at:
- Removing tax obstacles, providing tax certainty and reducing cost for all Jersey businesses with inbound and outbound staff. Staff mobility has become an increasingly common feature of the modern world of work and this is particularly the case for a small island economy; and
- Fostering investment in technology with the aim of improving business productivity. A unique pilot tax incentive is being launched to encourage Jersey's regulated financial services businesses to invest in productivity-enhancing technologies related to regulatory compliance. This should boost productivity in this key sector, benefitting the broader Jersey economy.
Supporting Staff Movement for All Business Sectors
This Government recognises Jersey's global connectedness, acknowledging the need to provide greater tax certainty and support for internationally mobile workers coming to Jersey and for Islanders seeking opportunities to expand their businesses abroad.
For those coming from abroad to work for Jersey businesses, the measures in this Government Plan will offer clarity and ease of tax administration.
For Islanders whose business takes them beyond our shores, there will be enhanced relief from double taxation and red tape, to make it more worthwhile to share knowledge and expertise abroad and help expand Jersey export markets.
Specifically, the package offers:
• Certainty of treatment for short term business visits to Jersey. Non-Jersey residents and their employers currently face administrative challenges in tracking and fulfilling their tax responsibilities for brief employment duties performed in Jersey. The Government is working with businesses to refine the details of a proposal that will create a 60-day exemption period for short-term business visitors. Clear day boundaries for short term business visits are a common feature of many tax administrations. They are aimed at easing employer tax compliance for the shortest staff visits while also ensuring that tax is collected on activity that exceeds the minimum annual day limit.
The measures in this Plan will encourage business travel to the Island that will have meaningful economic benefits to the businesses themselves and ancillary benefits to other sectors of the economy such as Jersey's hospitality industry.
• Credit-based unilateral relief from double taxation for Jersey residents. Government Plan 2024-2027 also proposes to allow workers resident in Jersey with foreign employment income to keep more of their earnings. For earnings in countries with which Jersey does not have a double taxation agreement, Jersey-based employees will be able to deduct eligible foreign taxes from Jersey tax due on that income under a new credit-based tax regime.
Regulatory Technology (RegTech) Super-Deduction
In last year's Government Plan, the Government committed to considering increased capital allowances to incentivise investment in assets that would improve the Island's productivity.
Government Plan 2024-2027 is proposing to introduce a pilot programme for enhanced expense deductions targeted at businesses which are facing the headwinds of an evolving regulatory environment and disruptive technologies.
A new 150% RegTech Super-Deduction will be targeted at entities that invest in eligible technologies to comply with regulatory obligations overseen by the Jersey Financial Services Commission. Eligible technologies will include those designed to automate, optimise, and streamline compliance with regulations related to:
• Financial crime, including Anti-Money Laundering (AML), Combating the Financing of Terrorism (CFT), and Counter-Proliferation Financing (CPF).
• Cyber risk, identity, privacy protection and data and information management and security.
• Regulatory reporting and analytics.
• Compliance management.
• Other requirements of the JFSC for risk management, fraud prevention, and conduct.
By investing in technologies that free up resources otherwise devoted to regulatory compliance, these businesses can focus their creativity on high-value strategic ambitions to ensure the Island's sustainable growth and continued prosperity.
The outcomes of this initiative will be reviewed after two years of operation. In the meantime, the Minister for Treasury and Resources will oversee a wider review of the way in which tax incentives such as this can support other industries on the island with different tax profiles. This work will be coordinated with the Future Economy Programme.
The package of measures set out above provides £450,000 of tax relief annually to affirm the Government's commitment to championing innovation and enterprise. By empowering our mobile workforce and supporting firms investing in technological advancements, the Government is committed to nurturing a thriving business environment where Jersey businesses can realise their future potential.
| Budget Measures for Innovation |
|
|
|
|
|
|
| 2024 | ||
£'000 |
|
| Estimate | ||
RegTech Super-Deduction |
|
| (200) | ||
Unilateral relief |
|
| (150) | ||
60-day threshold for short-term visitors |
|
| (100) | ||
Total tax measures to support innovation |
|
| (450) | ||
Table 7: Budget for Innovation: Summary costs of tax measures |
|
|
|
Stamp Duty Thresholds for First-Time Buyers
The rates of Stamp Duty for first-time buyers were last changed in 2019. Since then, the House Price Index has increased by around 40%. The Minister for Treasury and Resources is proposing an increase to the first-time buyer upper threshold in-line with that increase, to support those who are trying to get on the housing ladder.
In addition to increasing the upper threshold, it is proposed that the 1% rate for first-time buyers is extended to ensure that minimal Stamp Duty is charged on lower value transactions. No changes are proposed to the nil rate, which means that no Stamp Duty is charged on transactions of £350,000 or below.
| Stamp Duty for First-Time Buyers |
|
|
|
|
|
|
|
|
|
|
| Current bands |
| Proposed bands | ||
Nil rate |
|
|
| £1 to £350,000 |
| £1 to £350,000 | ||
1% rate |
|
|
| £350,000-£450,000 |
| £350,000- £600,000 | ||
Taper |
|
|
| £450,000-£500,000 |
| £600,000-£700,000 | ||
Upper threshold |
|
|
| £500,000 |
| £700,000 | ||
Table 8: Stamp Duty for First-Time Buyers |
|
|
|
|
|
|
These proposals would mean that the Stamp Duty charged on first-time buyers who are purchasing a property for £500,000 would reduce from £8,000 to £1,500. Further examples are provided in Table 9 below.
| Stamp Duty for First-Time Buyers – Examples |
|
|
|
|
|
|
|
|
|
| Current |
| Proposed | |
Transaction value |
|
|
| Stamp Duty |
| Stamp Duty | |
£500,000 |
|
|
| £8,000 |
| £1,500 | |
£550,000 |
|
|
| £9,500 |
| £2,000 | |
£600,000 |
|
|
| £11,000 |
| £2,500 | |
£650,000 |
|
|
| £12,500 |
| £8,250 | |
£700,000 |
|
|
| £14,000 |
| £14,000 | |
Table 9: Stamp Duty for First-Time Buyers – Examples |
|
|
|
|
|
|
To fund these proposals to help aspiring first-time buyers, the Council of Ministers will, as agreed in the States Assembly debate on 13 September 2023 (Proposition New Stamp Duty Rates' (P.63/2023[5])), propose modest increases to some of the Stamp Duty rates for higher value properties, in the Draft Finance (2024 Budget) (Jersey) Law 202-.
High Value Residents (HVRs)
In July 2023, the States Assembly voted to approve version 5' of the HVR tax system. The changes included an increase to the minimum annual income tax required to be paid from £170,000 to £250,000.
Summary of Budget Proposals
Proposed £'000 vs Forecast[6]Personal allowances incl. child allowances (3,864) Alcohol duty increase (1,500) Tobacco duty increase 595 Fuel duty freeze (2,700) Biofuel duty reduction (85) Vehicle Emissions Duty increases 426 Innovation and enterprise (450) Codifying remittance basis[7] 100 Stamp duty – first time buyers[8] -
Budget Proposals (7,478) Table 10: Summary of Budget Proposals
Increased Collections: Domestic Compliance
Revenue Jersey continues to develop its annual published compliance programme[9], in line with its published compliance strategy, and to improve its capabilities, for example in assessing and identifying tax risks. Building on existing results (additional revenues from its compliance activities), Revenue Jersey is projecting an additional £16m in collections from activities devoted to audit, enforcement, and other compliance work. This adds to the £15.5m projected in the 2023-2026 Government Plan. Together, the additional collections are expected to contribute £31.5m to general revenues in each year of the Plan.
Additional Tax Measures to be Considered in Future Plans
Long-term Financing Strategy for the Carbon Neutral Roadmap
The Long-term financing strategy for the Carbon Neutral Roadmap includes the need to raise additional revenues to allow the funding of the transition to net-zero over the next thirty years. More detail is provided in the section on the Long-Term Financing Strategy for the Carbon Neutral Roadmap.
Mortgage Interest Deductions for Letting Properties
Following an amendment[10] to this Government Plan, Ministers will examine the case for removing mortgage interest tax relief in respect of letting properties. This work will be subject to the outcome of the Fiscal Policy Panel's review of Jersey's housing market which will be published in 2024, a full consultation process, and consideration of the timing and cumulative impact upon Jersey's housing market.
Liquid Waste Charges
The need to invest in our liquid waste infrastructure has been clearly articulated in the bridging Liquid Waste Strategy[11]. The scale of investment needed for this critical work requires a suitable funding mechanism, and in 2024 the Minister for Infrastructure will develop proposals for the use of waste charges to meet these costs, to be debated in a future Government Plan. In line with the proposition Medium term financial plan addition for 2017-2019 (as amended)' (P.68/2016[12]), the States are asked to approve the application of resources for work on the development of user pays' charges in relation to all aspects of waste charges, including commercial and domestic liquid and solid waste.
Taxing Vaping Products
The Government is committed to safeguarding the health of Islanders and minimising the harmful effects of nicotine consumption in all its forms. We will undertake a study of the potential role for taxation both in reducing the consumption of nicotine and other potentially harmful e-liquids by vaping (particularly among young Islanders) and also maintaining revenue receipts to help meet the social costs of vaping.
With vaping's growing popularity there has emerged a diverse range of products that differ in design, chemical composition, health implications and environmental consequences. This complexity warrants an evidence-based review to arrive at a balanced and effective taxation framework that works in concert with the Government's regulatory and awareness strategies set out within the Government Plan and Ministerial priorities.
Progress of Tax Reforms and Reviews
Independent Taxation
Successive governments have been clear in their ambition to provide equality of tax treatment for all people regardless of their marital status.
Following the States Assembly's votes in July 2023 on proposition removal of compulsory independent taxation for existing married couples and civil partnerships (P.32/2023[13]), Ministers are working to provide an option for couples who were resident in Jersey and who were married or in a civil partnership before 1 January 2022 to file a joint tax return.
Ministers intend to amend their own proposition draft income tax amendment' (P.41/2023[14]) and to secure the Assembly's agreement by the end of 2023 to deliver Independent Taxation on a universal basis for the 2026 year of assessment. A Compensatory Allowance will be available for those married couples and civil partners who have previously had access to the Married Man's tax allowance and who would otherwise be financially disadvantaged by this change.
International Tax Reform
For the past several years, the OECD has been working to establish a new global tax framework, aimed at addressing the tax challenges arising from the increasing digitalisation of the economy. The Government of Jersey has been closely engaged throughout every step of this process through Jersey's seat in OECD fora.
On 8 October 2021, the OECD/G20 Inclusive Framework – of which Jersey is a founding member – released a statement on a two-pillar solution, in which 136 jurisdictions, including Jersey, joined the political consensus on the new tax framework.
The proposed elements of these pillars are targeted and limited in scope, focussing on the world's largest Multi-National Enterprises (MNEs). The October announcement was an important political stepping-stone and established the Building Blocks for the tax reform process. But significant further technical work is ongoing and implementation plans remain to be developed. Jersey remains actively involved in these discussions.
If ultimately agreed by Inclusive Framework:
• Pillar One of the Building Blocks will create new profit allocation rules for the world's largest Multi-National Enterprises (MNEs), with global turnover in excess of 20bn and profitability in excess of 10%. The Pillar 1 rules will exclude Regulated Financial Services. For the very small and targeted number of MNEs globally that are impacted by Pillar One, certain of their profits would be re-allocated to market jurisdictions; and
• Pillar Two of the Building Blocks will introduce a new framework of taxation whereby Multi-National Enterprises (MNEs) that are in scope (those with global revenues of at least 750m) would pay a Minimum Effective Rate of taxation of 15 percent, with an important carveout for certain investment entities (such as funds). This Minimum Effective Rate would be calculated in a specific way based on financial statements and on a country-by-country basis. In addition, a treaty-based rule ensures that double tax agreements do not prevent certain payments made from developing countries from being taxed at a rate of at least 9%.
Pillar One is a political commitment that will likely require Jersey to introduce legislation, notwithstanding the minimal practical impact. However, Pillar Two is a common approach, giving Jersey options regarding how, if at all, a global minimum tax would be implemented in Jersey.
The Government is engaged in extensive stakeholder engagement and data analysis – locally and internationally – to understand potential impacts of the various policy options. However, it is not possible at the present time to clearly predict what MNE behavioural effects may be, given that impacts will depend in part on what other jurisdictions do with implementation and the timing of those actions. As no political decision has been made by the States Assembly on Pillar Two, this Government Plan contains no estimate of any potential impact the reform measures may have. This position will be kept under review for future Government Plans as decisions on implementation are made.
On 19 May 2023, the three Crown Dependencies made a statement on an intended approach to implementation of the OECD Pillar Two global minimum tax framework for large multinational groups. Each Island intends to implement an Income Inclusion Rule (IIR) and domestic minimum tax from 2025, while continuing to monitor global implementation.
Fuel Duty Replacement Policy
Jersey's progression toward net zero will have an impact on the make-up of the road vehicle fleet as it changes in response to our carbon reduction ambitions and a changing global market. As the fiscal and policy measures, and people's own choices, start to take effect receipts of Road Fuel Duty will decline, and the Government's income could reduce by up to £26m. It will still be necessary for the Government to maintain roads and fund other essential services related to road use and to off-set the emissions that cannot be reduced through new and existing policy levers.
In 2024, the Government will undertake policy work to devise an alternative duty charge which, over time, will begin to make up the funding lost from Road Fuel Duty. Alternative duty charges considered include a form of Vehicle Ownership Charge or a Road User Charge. It is not expected that a new charge could come into effect until 2026 at the earliest (with the law passing to give effect of the change in 2025).
Stamp Duty Review
As part of the ongoing stamp duty review, Ministers will continue to develop policies and technical amendments throughout the 2024 – 2027 Government Plan period. The review will consider the wider Housing Strategy and whether there is a role for stamp duty as a fiscal lever to achieve the aims of the strategy.
Work will commence in 2024 to consider introducing group relief from Stamp Duty to companies transferring Jersey property between themselves. The relief, referred to as Group Relief', would only be available to companies that are owned or controlled by the same beneficial owner. Currently, Stamp Duty would be charged on the transfer of property between entities, irrespective of whether they are related entities.
Enveloped Property Transaction Tax has introduced a similar form of relief for connected parties.
Summary of General Revenue Income Forecast, incorporating Budget Measures
| Income Forecast, including additional income measures |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2024 |
|
| 202 | 5 |
| 2026 |
|
| 2027 |
£'000 Estimate Estimate Estimate Estimate States Income - IFG Forecast 1,166,570 1,219,002 1,254,501 1,299,468 Additional Income Measures
- Increased Collections: Domestic Compliance 31,500 31,500 31,500 31,500
- Budget Measures[15] (7,481) (6,906) (6,361) (5,851)
- Interest Tax Relief (Letting Properties Only)[16] - - - 1,900
States Income after Income Measures 1,190,589 1,243,596 1,279,640 1,327,017 Table 11: Income Forecast, including additional income measures
Public Sector Spending 2024-2027
This Government Plan proposes £1.16bn of spending in 2024 on delivering services to Islanders.
Revenue Heads of Expenditure
The Government Plan is required, by the Public Finances Law, to set out the proposed amount to be spent from the Consolidated Fund by each head of expenditure, after allowing for any estimates of departmental income. Heads of expenditure within this Government Plan relate to each Government of Jersey department, Non-Ministerial and other States bodies, and a separate head of expenditure for the Central Reserve. Expenditure has been allocated to departments for 2024, and estimates produced for 2025 to 2027.
Departmental heads of expenditure are aligned according to lines of accountability under the Public Finances Law. Expenditure is approved in this manner to ensure that there is clear accountability, both at political and officer levels. The departmental expenditure limits for 2024 incorporate both existing resource requirements and new funding, but exclude pay- inflation, which is held centrally in reserves. Whilst this is generally aligned to Ministerial portfolios, there are some differences, and a Ministerial mapping is provided as part of the Annex to the Government Plan.
Children, Young People, Education and Skills , £206m
Health and
General public services and Community Social Benefits (incl States other , £404m Services , £286m grant) , £204m
Figure 8: Departmental Net Revenue Expenditure (excluding Reserves)
The above chart illustrates the proportion of Government net revenue spending in 2024, on Health and Community Services (26%), Children, Young People, Education, and Skills (19%), tax funded social benefits (19%), and general public services (36%). General public services and other, includes all other departmental and non-Ministerial functions listed in Table 12.
|
|
|
| Revenue Heads of Expenditure |
|
|
|
|
|
|
|
|
|
|
|
|
|
2023 |
|
| 2024 |
| 2025 |
| 2026 |
| 2027 | ||||||||
Approved | £'000 |
| Estimate |
| Estimate |
| Estimate |
| Estimate | ||||||||
67,336 | Departmental Heads of Expenditure Cabinet Office [17] |
| 77,268 |
| 77,222 |
| 77,060 |
| 77,060 | ||||||||
189,688 | Children, Young People, Education and Skills |
| 206,467 |
| 207,443 |
| 208,797 |
| 209,007 | ||||||||
95,303 | Customer and Local Services [18] |
| 106,827 |
| 108,598 |
| 110,888 |
| 112,081 | ||||||||
45,251 | Infrastructure |
| 57,165 |
| 58,740 |
| 57,153 |
| 56,990 | ||||||||
10,254 | Environment |
| 10,899 |
| 10,839 |
| 10,874 |
| 10,874 | ||||||||
249,032 | Health and Community Services [19] |
| 286,235 |
| 279,821 |
| 285,087 |
| 290,330 | ||||||||
17,700 | Jersey Overseas Aid |
| 20,041 |
| 21,106 |
| 21,486 |
| 22,109 | ||||||||
35,170 | Justice and Home Affairs |
| 40,069 |
| 40,307 |
| 40,313 |
| 40,357 | ||||||||
27,108 | States of Jersey Police |
| 27,335 |
| 27,425 |
| 27,402 |
| 27,381 | ||||||||
3,088 | Ministry of External Relations |
| 3,377 |
| 3,285 |
| 3,285 |
| 3,285 | ||||||||
32,526 | Economic Development, Tourism, Sport & Culture[20] |
| 37,119 |
| 37,072 |
| 37,370 |
| 37,736 | ||||||||
7,738 | Financial Services |
| 11,215 |
| 11,224 |
| 11,179 |
| 11,154 | ||||||||
67,388 | Treasury and Exchequer [21] |
| 159,588 |
| 173,283 |
| 172,873 |
| 174,054 | ||||||||
13,782 | Past Service Pension Liability Refinancing |
| 13,790 |
| 13,798 |
| 13,806 |
| 13,806 | ||||||||
861,364 | Departmental Net Revenue Expenditure [22] |
| 1,057,395 |
| 1,070,163 |
| 1,077,573 |
| 1,086,224 | ||||||||
2,124 | Non-Ministerial and Other States Bodies Bailiff 's Chambers |
| 3,208 |
| 3,408 |
| 3,208 |
| 3,208 | ||||||||
1,078 | Comptroller and Auditor General |
| 1,152 |
| 1,196 |
| 1,187 |
| 1,215 | ||||||||
9,127 | Judicial Greffe |
| 8,859 |
| 8,853 |
| 8,853 |
| 8,853 | ||||||||
10,881 | Law Officers' Department |
| 12,881 |
| 12,942 |
| 12,942 |
| 12,942 | ||||||||
839 | Office of the Lieutenant Governor |
| 905 |
| 905 |
| 905 |
| 905 | ||||||||
685 | Official Analyst |
| 735 |
| 738 |
| 741 |
| 791 | ||||||||
2,644 | Probation |
| 2,951 |
| 2,883 |
| 2,883 |
| 2,883 | ||||||||
8,746 | States Assembly |
| 9,904 |
| 9,807 |
| 9,807 |
| 9,807 | ||||||||
2,102 | Viscount's Department |
| 2,413 |
| 2,343 |
| 2,343 |
| 2,343 | ||||||||
38,226 | Non-Ministerial Net Revenue Expenditure |
| 43,008 |
| 43,075 |
| 42,869 |
| 42,947 | ||||||||
25,211 | Covid-19 Response |
| - |
| - |
| - |
| - | ||||||||
924,801 | Departmental and Non-Mins Total |
| 1,100,403 |
| 1,113,238 |
| 1,120,442 |
| 1,129,171 | ||||||||
60,243 | Reserves Central Reserve 41 |
| 62,188 |
| 96,164 |
| 101,595 |
| 115,234 | ||||||||
60,243 | Reserves Expenditure |
| 62,188 |
| 96,164 |
| 101,595 |
| 115,234 | ||||||||
- | Value for Money |
| - |
| (10,000) |
| (20,000) |
| (20,000) | ||||||||
985,044 | Net Revenue Expenditure |
| 1,162,591 |
| 1,199,402 |
| 1,202,037 |
| 1,224,405 | ||||||||
55,736 | Depreciation |
| 56,131 |
| 57,460 |
| 57,444 |
| 57,444 | ||||||||
1,040,780 | Net Revenue Expenditure after Depreciation |
| 1,218,722 |
| 1,256,862 |
| 1,259,481 |
| 1,281,849 |
Table 12: Revenue Heads of Expenditure
Changes to Revenue Expenditure
The Government Plan proposes £1.16bn of spending on delivering public services to Islanders in 2024, an increase from 2023 driven largely by inflationary pressures and the reintroduction of the States grant in 2024.
As we emerge from the pandemic, approvals relating to the Covid-19 response and recovery (£25m) have been removed or incorporated into ongoing departmental budgets. Other changes to growth already approved in Government Plan 2023-2026 are included. Detail on these changes can be found on page 104 in last year's Government Plan.
In the context of a high inflation environment and impact on government spending, an additional £70m has been provided for inflation (covering staff, social benefits and other costs) in 2024. Inflation is expected to fall in later years of the plan, but additional amounts are provided to maintain departmental budgets in real terms.
This plan also seeks to further invest £51m into initiatives that support the delivery of Ministerial priorities, this is in addition to £14.6m of formula related growth arising from previous commitments.
The States grant to the Social Security Fund, will be reinstated in 2024 after being suspended since 2020 to offset the impact of Covid-19 on public finances. The reintroduction of the States grant[1] will be phased with a £20m reduction in 2024 and 2025, with the value of the Grant in 2027 increased by £40m when Government finances are forecast to be in a stronger position.
Table 13 below shows how expenditure changes in each year of the plan.
| Changes to Net Revenue Expenditure |
|
|
|
|
|
|
|
|
|
|
|
|
|
£'000 |
| 2024 Estimate |
| 2025 Estimate |
| 2026 Estimate |
| 2027 Estimate | ||||||
Base Budget |
| 985,044 |
| 1,162,591 |
| 1,199,402 |
| 1,202,037 | ||||||
Adjustments for net changes to Base Budget; |
|
|
|
|
|
|
|
| ||||||
Adjustments from GP23 |
| (21,691) |
| (76) |
| (2,977) |
| (50) | ||||||
Inflation |
| 70,166 |
| 34,700 |
| 10,733 |
| 15,089 | ||||||
Other Formula Driven Growth |
| 14,649 |
| 7,111 |
| 6,150 |
| 6,708 | ||||||
Revenue Growth GP24 |
| 51,177 |
| (6,133) |
| (1,447) |
| (84) | ||||||
Reintroduction of States Grant to Social Security Fund |
| 77,596 |
| 11,209 |
| 176 |
| 705 |
Value For Money Savings (14,350) (10,000) (10,000) - Adjusted Base 1,162,591 1,199,402 1,202,037 1,224,405 Reprofile of States Grant to Social Security Fund[2] - - - - Net Revenue Expenditure 1,162,591 1,199,402 1,202,037 1,224,405
Table 13: Changes to Net Revenue Expenditure
Figure 9: Income and Expenditure Trends before Depreciation
Inflation and Formula Driven Growth
It is both prudent and good financial management to plan for the impact of economic influences on Government finances. As such, we have set aside amounts to cover inflationary pressures on pay (held centrally), social benefits and non-pay expenditure.
3.8% of non-pay expenditure inflation has been allocated directly to departments (after allowing for inflation on departmental income capped at 2.5%). The allocation of non-pay inflation is based on the Fiscal Policy Panel assumption for RPI(X) published in July 2023, which adjusts RPI by excluding the cost of mortgage interest payments. Inflation does not affect all elements of spend equally, and we have maintained central provisions based on areas where there is a risk of inflation at higher levels, for example fuel and chemical supplies.
In determining an appropriate level of pay provision, the Council of Ministers have considered a range of factors, including the cost of living, average earnings in the wider economy and the impact on public finances. Further work to develop a more detailed pay strategy is needed, but the pay provision is designed to give adequate resource to develop an offer which enables suitable ongoing remuneration of public servants in the wider economic context. This could include differential awards between pay-groups and pay-levels, along with reviews of current terms and conditions. Previous provisions for the impact of parental leave have been included in the overall allocation, as the ongoing impact should be resolved as part of the wider pay strategy.
Inflation is, by nature cumulative, and so this amount grows throughout the plan. There remains a significant amount of uncertainty around levels of inflation. Higher inflation will typically lead to increased levels of both income and expenditure.
The Government Plan also includes a number of areas of expenditure that are determined by pre-agreed formulas: an annual 2% increase in Health budgets to maintain service standards and meet the costs of health care inflation, staged increases in the Jersey Overseas Aid (JOA) budget to 0.3% of GVA by 2025, and maintenance of spending on Arts, Heritage and Culture to 1% of government expenditure.
Revenue Growth Funding
This plan proposes additional funding for departments to meet the immediate priorities identified by the Council of Ministers where it's not possible to reprioritise existing resources to meet them. This funding totals £48m in 2024 over and above amounts included in previous plans and is in addition to departments' existing budgets. Additional funding is provided to address service pressures across all areas of government, including significant additional funding for health, education and children's services. We are also continuing to invest in our economy and financial services to ensure our future prosperity.
The States Employment Board (SEB) will have a continued focus on strategic workforce planning, which will consider how any headcount implications of the growth should be managed to reduce the impact on the wider labour market, in conjunction with the Value for Money programme. Furthermore, the focus on strategic workforce planning, will seek to review and where possible rationalise the number of funded posts that continue to remain vacant.
Further to an amendment to the Government Plan, additional funding of £3m[1] has been provided for agriculture and fisheries through the rural and marine support schemes.
Table 14 provides a summary of this additional funding by department (including amounts held centrally). Further information on the proposed additional expenditure can be found in Appendix 3, and the Annex to the Government Plan.
| New Revenue Expenditure Growth |
|
|
|
|
|
£'000 |
| 2024 Estimate | 2025 Estimate | 2026 Estimate | 2027 Estimate | |
Cabinet Office |
| 4,696 | 4,500 | 4,188 | 4,188 | |
Children, Young People, Education & Skills |
| 4,700 | 4,700 | 4,700 | 4,700 | |
Customer and Local Services[2] |
| 1,642 | 1,192 | 1,195 | 1,198 | |
Infrastructure |
| 1,516 | 1,821 | 747 | 584 | |
Environment |
| 300 | 300 | 300 | 300 | |
Health and Community Services[3] |
| 21,075 | 14,575 | 14,575 | 14,575 |
Jersey Overseas Aid - - - -
Justice and Home Affairs 1,994 2,184 2,228 2,272
States of Jersey Police 237 327 304 283
Ministry of External Relations 134 134 134 134
Economic Development, Tourism, Sport & Culture[4] 5,250 5,250 5,250 5,250
Financial Services 1,496 1,505 1,460 1,435
Treasury and Exchequer 5,976 6,476 6,476 6,476
Non-Ministerial Departments 1,319 1,246 1,206 1,284
States Assembly 842 834 834 834
New Revenue Expenditure 51,177 45,044 43,597 43,513 Table 14: New Revenue Expenditure Growth
Ongoing Risks and Pressures in Health and Community Services
In the aftermath of the Covid-19 pandemic, the Health and Community Services department is facing a range of challenges including financial pressures of up £35m. This is driven by both factors in the direct control of the department, and structural factors outside of their direct control. A team to deliver a Financial Recovery Programme (FRP) has been put in place in 2023, and a comprehensive plan is expected to be produced by the autumn of 2023. It will also be essential to ensure that central functions are aligned to support the department in resolving some of the operational challenges. As a part of delivering the FRP, this funding will be used to maintain existing healthcare services that are facing further inflationary, activity and efficiency related cost pressures. Examples of these services are mental health placements, social care packages, high-cost drugs, off-Island care, expansion beds and cancer services.
The recovery plan will identify opportunities for improved efficiency and effectiveness of services to help reduce costs and ensure that the service can be delivered within the revised cash limits, reducing spend by £25m a year by 2025. The Council of Ministers have recognised that the delivery of these savings will take time, and it is anticipated that not all structural elements can be resolved without impacting healthcare services and patients. A further £21m has therefore been allocated to the department in 2024, reducing to £15m in 2025 onwards to maintain healthcare services.
Value for Money
The targets set by this Council of Ministers in the Government Plan 2023-2026 have been maintained, with £14.4m[1] being delivered by departments in 2024, and a further £10m in each of 2025 and 2026. The Council of Ministers have considered the advice of the FPP in setting this amount and are content that efficiency savings at this level should be achievable in an organisation of this size on an annual basis, and so inclusion is in no way speculative. Including the reduction in departmental budgets ensures that officers are incentivised to develop suitable plans and can be held accountable for their delivery.
These targets are a minimum reduction in overall expenditure, and the Council of Ministers will look to simplify operations, prioritise services according to Islanders' needs, improve efficiencies across government, and review the effectiveness of government administrative processes in order to achieve such efficiencies. This will allow funding to be reprioritised into areas needing further investment, or further reduce overall spend. This work is part of the longer term VFM programme.
Depreciation
Depreciation represents the cost of using Government assets in the provision of services. It is included when calculating whether the Government is running a surplus or a deficit, which
follows FPP advice, and helps to ensure that the need to continue to invest in assets is adequately recognised in planning.
The increase in depreciation during 2024-2027 reflects an estimated uplift in asset values, as a result of either assets being created or replaced.
Reserve Heads of Expenditure
This plan simplifies previous practice through the inclusion of a single Central Reserve Head of Expenditure. As well as a provision of £7m for unforeseen expenditure in year (including £2m ring-fenced for social benefits), this now incorporates centrally held items such as provisions for inflation that have not been allocated to departments.
The Central Reserve is held outside of operational expenditure limits, and can be used to meet unforeseen pressures, or to provide advance funding for urgent expenditure in the public interest. In each year, amounts are held to manage fluctuations in benefit expenditure due to economic changes, and to allow one-off funding for emerging issues.
Furthermore, £10m was allocated in the reserves in 2022 for assisted home ownership schemes, and any amounts not used in 2023 will be carried forward within the reserve for the same purposes.
| Central Reserve Expenditure |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2024 | 2025 |
| 2026 |
| 2027 | |||||||
£'000 |
| Estimate | Estimate |
| Estimate |
| Estimate | |||||||
General Reserve |
| 7,000 | 7,000 |
| 7,000 |
| 7,000 | |||||||
Reserve for Centrally Held Items |
| 58,171 | 92,147 |
| 97,578 |
| 111,217 | |||||||
Central Reserve - Approved Reductions[1] |
| (2,983) | (2,983) |
| (2,983) |
| (2,983) | |||||||
Total Central Reserve Expenditure |
| 62,188 | 96,164 |
| 101,595 |
| 115,234 | |||||||
Table 15: Central Reserve Expenditure |
|
|
|
|
|
|
|
Delivering Value for Money
In this Government plan, the Council of Ministers reiterates its commitment to driving Value for Money in everything Government does, in the delivery of services as well as through its investment in projects and service improvements.
The Value for Money (VFM) programme strives to engender a strong and positive financial management culture across the organisation and a mindset of continuous improvement. Such a culture will enable departments to plan and deliver cashable savings as well as improved productivity and reliability of its services ensuring that taxpayers, service users and Islanders receive better value for money outcomes.
It is also recognised that a productive public service will build public trust but also delivers wider benefits for our Island and our economy. To be successful in this regard, it is recognised that the Government and its services need to engage with employees, service users and customers, to better understand their experiences and needs to achieve congruous outcomes.
We must re-build trust by delivering a professional Government based on integrity, strategic thinking and clear communication whilst ensuring delivery of value for money to the taxpayer.
The objective by 2027 is to have restored trust and accountability in Government by focusing on two outcomes:
• Trusted, reliable and value for money public services.
• Government that is responsive, compassionate, and accessible, and public servants are supported to do their best work.
Objective Restoring trust and accountability in Government for 24-27
A government that is responsive, Trusted, reliable and
Outcome compassionate, and accessible.
value for money
by 2027 Where public servants are supported to
public services
do their best work.
In addition, the Government will seek to work jointly with Guernsey where possible. Guernsey-Jersey joint working aims to promote the sharing of expertise, resources, and best practices for the benefit of both jurisdictions and their respective populations. The Guernsey- Jersey partnership shall encourage open dialogue, constructive feedback, and the sharing of best practices to achieve the stated objectives.
Programme Delivery
In simple terms, improving efficiency means that Government is able to spend less and achieve the same or spend the same and achieve more and improve outcomes, carrying out activities faster, or with fewer resources or to a better standard.
The programme will drive these outcomes through the following approaches:
- Cashable savings targets and delivery plans for each department.
- A continuous improvement framework.
- A series of focussed thematic reviews and best value deep-dives.
Cashable Savings
The Fiscal Policy Panel has recommended that efficiencies should be sought regardless of the stage of the economic cycle, but also noted that "efficiencies can be difficult to deliver" and as such should only be relied upon if there is a clear plan for delivery.
Cashable savings targets have been allocated to departments as part of the departmental net revenue expenditure budgets and are detailed, for 2024, in the table below. Departments will ensure delivery plans are in place which will be tracked, monitored and reported through the programme to Council of Ministers and stakeholders for transparency and scrutiny. Detail for future years will be provided in future Government Plans.
Day to day departments make decisions to live within their departmental expenditure limits, ensuring there are controls and rigorous spend validation across their budgets and headcount.
The targets, in Table 16, are a minimum reduction in overall expenditure, and the Council of Ministers will look to simplify operations, prioritise services according to Islanders' needs and improve efficiencies across government. This will allow funding to be reprioritised into areas needing further investment, or further reduce overall spend. This work is part of the longer term VFM programme, expected to deliver full year impacts from 2024.
The FRP within Health and Community Services (HCS), will identify opportunities for improved efficiency and effectiveness of services to help reduce costs and ensure that the service can be delivered within departmental budget limits. The programme will deliver recurring savings of £25m by 2025, with £14.4m delivered in 2024. This will, bring departmental spending back into line with budgeted approvals (after structural gaps in the departmental budget have been remedied). The savings in 2024 exceed the VFM target for HCS, which has been factored into the deficit calculations.
Value for Money Savings
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate
Cabinet Office 2,907 - - - Children, Young People, Education and Skills 2,737 - - - Customer and Local Services 207 - - - Infrastructure 705 - - - Environment 172 - - - Health and Community Services 3,986 - - - Jersey Overseas Aid - - - - Justice and Home Affairs 572 - - - States of Jersey Police 422 - - - Ministry of External Relations 50 - - - Economic Development, Tourism, Sport & Culture 1,870 - - - Financial Services 145 - - - Treasury and Exchequer 577 - - - States Assembly - - - - Non-Ministerial - - - - Unallocated Future Savings - 10,000 10,000 - Value for Money Savings[1] 14,350 10,000 10,000 -
Table 16: Value for Money Savings
In accordance with the recommendations of the Corporate Services Scrutiny Panel, as set out in S.R.20/2022 a report published alongside the annual report and accounts will[2] –
- include a report on all Value for Money savings which were made during the duration of the previous Government Plan; and
- (identify and provide full details of the monitoring process that has been undertaken on the Value for Money programme during the duration of the previous Government Plan.
Continuous Improvement Programme
Efficiency and effectiveness are not only about more for less cost, but also concerned with better services. Given the relative size of Government spending, the annual public purse, a more productive Government will also have benefits for the wider economy.
The VFM programme includes a refreshed focus on continuous service improvement and increased productivity. Supported by training and tools, staff will be able to identify and remove wasteful and unproductive processes which impact on services often creating delays and negatively impact of service user experience.
Thematic Reviews and Best Value Reviews
The programme will continue its thematic deep dives, established in 2023, which aim to support departments in the delivery of their VFM targets. In 2024, Health & Community Services will continue to be a priority given the significant programme of delivery agreed in 2023, along with a new focus on the Department for Children, Young People, Education & Skills. Other areas of focus will include the role and function of the centre of Government, Government of Jersey (GoJ) Estates Rationalisation Strategy and cross-cutting elements of the departmental workforce strategies.
Best Value Reviews are also a fundamental part of the VFM programme. Reviews will be conducted in specified services, to confirm there is alignment between the Government's strategic priorities and service delivery outcomes, while considering for example, appropriate resources to deliver desired outcomes and appropriate form of service delivery.
Capital and Other Projects 2024 - 2027
Introduction
The Capital Programme sets out expenditure on the development and replacement of the Island's assets, including Estates, Infrastructure, Equipment and IT. It is essential that we continue to invest in the replacement and maintenance of our Island's assets so that we can deliver the services that Islanders need. This does not include the capital plans of the States of Jersey Development Company, Andium Homes and other State-Owned Entities, who will also be investing significantly across the plan period.
The allocation of funding to projects is on a cashflow basis and approvals are annual even though a four-year view of cashflow is presented. For Major Projects the first year of expenditure is approved with the total cost of the project also presented for approval where required. No property disposals have been included in the plan, but under the Public Finances Law the Minister for Treasury and Resources can approve changes to funding allocations for projects through the application of property receipts or other income.
In some cases, projects in delivery from previous plans may incur some costs in 2024 due to unforeseen delays. Heads of Expenditure established in previous plans will continue to allow for this.
Affordability and Deliverability
In developing an updated capital programme for this Government Plan, both the affordability and deliverability of the programme have been key considerations.
• Affordability – government must have sufficient funds to pay for the capital programme – in particular, a forecast positive Consolidated Fund balance must be maintained over the four years of the Government Plan.
Spending at the level envisaged in the Plan substantially exceeds the rate of depreciation on existing assets so this capital programme should contribute to a net increase in Government's asset base. While that should help to strengthen the foundations upon which the Island's public services are built, there are inevitable limitations from an affordability perspective. In some cases, it has been necessary to seek out opportunities for alternative funding solutions to enable the level of ambition set out in this capital programme.
• Deliverability – the programme should take into account the internal and external capacity constraints. This includes the capacity of the market to deliver the work (for example the capacity of the construction industry), and the government's internal capacity to develop and manage the projects. It also includes other practical factors such as the time necessary to secure planning approval.
Since coming into office in July last year the Council of Ministers has sought to bring a sharper focus to ensuring that capital spending plans that are set out in the Government Plan are deliverable.
Over a period of several years the Government has tended to allocate a higher amount in aggregate to Capital Projects than departments have been able to spend. This has tied up tens of millions of pounds of taxpayers' money that could have been productively invested in other projects. It also presents challenges for the wider supply chain surrounding Government's capital expenditure as suppliers need a reliable forward pipeline of potential work in order to plan their activities.
To mitigate these risks, further efforts have been undertaken this year to ensure that the programme is set within boundaries that have proven to be deliverable in previous years. Government's capital programme is complex and there will still be risks that cannot be mitigated and cause delays to individual projects. However, the work that has taken place around deliverability should help to ensure that a high proportion of capital projects deliver in line with their original planned cash flow profile.
Longer Term Capital Planning
Alongside work to ensure capital projects are more deliverable, this government has sought to bring a longer-term focus to capital planning. An initial 10-year pipeline of future project requirements was established to support decision-making for the capital programme in this Government Plan and the intention is to mature this work into a 25-year outlook for project investment that will be published in 2024.
The development of longer-term planning will facilitate a more strategic approach to capital planning, helping to ensure that individual projects are properly reflective of the supporting policies and strategic frameworks. It will also support richer engagement with the Island's supply chain and enable the creation of longer-term partnerships that allow the suppliers to expand their capacity based around a reliable pipeline of future projects.
A greater long-term focus will also complement work that is on-going to conduct a strategic review of the Government's land and property holdings. This will seek to establish a more complete understanding of the Government's future estate needs as well as financial implications appropriately maintaining and replacing estate assets over a long-term horizon. Developments in estates management and enterprise asset management will support this project, as will the planned condition survey of the States Estate.
Project Gateways
•Feasibility
Strategic funding in Outline Full
Outline GP Business Included as a Business Project moves
Case Case project with Case
(SOC) •Ifnuftourrme s (OBC) costings (FBC) into delivery
years totals
Projects typically require high levels of funding to spend over multiple years. Project planning requires decisions to be taken on the basis of estimates and successful delivery can be subject to several risks. To help to ensure that governance processes support value for money, it is important that decisions can be taken to stop or amend a project throughout the decision cycle. Accordingly, planning for projects follows a three-stage approach that helps to control the inherent risk and uncertainty involved in seeking to determine cost and resource requirements often several years in advance of project commencement.
- Stage 1: Strategic Outline Case (SOC) – projects first enter the programme following the completion of a SOC. This is an early-stage business case that also provides high-level estimates of likely financial and resource requirements. In accepting a SOC, the Government will commit funding and/or internal officer time to further feasibility work that aims to develop a more detailed and comprehensive business case. Government Plan allocations for future years will be informed by the potential cost implications, but, as costings are still elementary, no express commitment is made to deliver the project until a more detailed Outline Business Case has been prepared and agreed.
- Stage 2: Outline Business Case (OBC) – the OBC is the principal planning document for projects. It is drafted after detailed policy and feasibility work has been completed and thereby allows for a robust estimate of likely expenditure and resource requirements. After the OBC is approved, a project can generally be reflected in the Government Plan with assigned costings, for the Assembly's consideration.
- Stage 3: Full Business Case (FBC) – while OBC costings are the Government's best estimate of financial requirements developed following detailed policy and
feasibility work, they are still uncertain and based on assumptions. Changes in circumstances within the supply chains, the emergence of competing priorities, or wider economic change can give rise to unforeseen additional costs or reduce the anticipated benefits that will accrue from the project. The FBC allows a final decision point once actual commercial terms have been agreed, and the project is ready for implementation. If the FBC is accepted by Ministers, the project will move into delivery.
Major Projects
The Public Finances Law 2019 defines major projects' under Article 1 as follows:
- a capital project the duration of which, from start to finish, is planned to be of more than one year and the total cost of which is planned to be of more than £5m; or
- a project that has been designated as a major project under an approved government plan
Major Projects are separately identified within each section of the programme.
Grouped Heads of Expenditure
Grouped Heads of Expenditure were introduced in the Government Plan 2022-2025. Grouped Heads improve flexibility, allowing Accountable Officers to manage individual projects within a wider programme so that any individual delays or changes to project expenditure can be managed within the approved financial envelope. It is only possible to adopt this approach where the projects concerned support similar outcomes.
In future years where the exact timing and amount of funding required is uncertain, a single amount has been included, with an indication of which projects may be funded from it. More detailed allocations are made in future Government Plans. This approach gives clear visibility of future projects, without the inclusion of figures where the amount or timing of spend remains uncertain.
Major Projects are not included in a grouped head of expenditure once the total expenditure for the project has been agreed in a Government Plan. However, some projects planned for future years of a grouped head of expenditure may ultimately become Major Projects (if the estimated costs exceed £5m). For example, a replacement school would almost certainly become a major project but would remain in the New School and Educational Developments grouped Head of Expenditure until the timing and costs are better understood.
A section was added to the Public Finances Manual in 2023 which sets out further requirements in terms of managing these budgets.
Decarbonisation of Government
Jersey's 2050 net zero target, and interim 68% reduction in CO2e emissions by 2030, requires the Government to decarbonise heat within its Estate. We have begun this process, and from 2024 existing heating systems that break down or are at the end of their life will be replaced by low carbon systems wherever possible, and only low carbon heating systems will be specified for all new Government of Jersey-owned or leased property.
This will be factored into all future projects in the Capital Programme.
The Capital Programme
Investment in capital and other projects is important for ensuring the sustainability and improvement of the Island's public services. Projects support the creation, improvement and extension of assets that enable service delivery.
The Capital Programme in this Government Plan allocates £373m to projects across 2024- 2027 to invest in the Island's critical infrastructure, the public sector estate, and Government's information technology systems. It also enables the replacement of essential equipment and other assets.
Table 17 provides a breakdown of the key thematic areas of spend within the Capital Programme, each of which is set out in further detail in the sections that follow.
| Capital and Other Projects Programme |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
£'000 |
| 2024 Estimate |
| 2025 Estimate |
| 2026 Estimate |
| 2027 Estimate | |||||||||
Feasibility |
| 1,706 |
| 982 |
| 700 |
| 1,094 | |||||||||
Estates |
| 45,728 |
| 48,085 |
| 32,670 |
| 32,235 | |||||||||
Infrastructure |
| 30,044 |
| 33,346 |
| 24,495 |
| 22,580 | |||||||||
Information Technology |
| 20,162 |
| 9,967 |
| 9,592 |
| 8,132 | |||||||||
Replacement Assets and Minor Capital |
| 10,680 |
| 13,136 |
| 10,200 |
| 10,200 | |||||||||
Reserve for Central Risk and Inflation |
| 5,000 |
| 1,000 |
| 1,000 |
| - | |||||||||
Capital and Projects Expenditure |
| 113,320 |
| 106,516 |
| 78,657 |
| 74,241 | |||||||||
Table 17: Capital and Other Projects Programme |
|
|
|
|
|
|
|
|
In addition to the programme summarised above, the States Assembly is asked to approve the proposed capital plans of the Trading Funds and States Funds.
Proposed Scheme Funded from Trading Funds
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate
Vehicle and Plant Replacement 3,004 2,445 2,736 2,736 Car Park Enhancement and Refurbishment 980 60 935 935 Proposed Scheme Funded from Trading Funds 3,984 2,505 3,671 3,671
Table 18: Scheme Funded from Trading Funds
Proposed Scheme Funded from Social Security Fund
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate
Benefits and Payments (Transform) 5,670 4,046 3,524 1,945 Proposed Scheme Funded from Social Security Fund 5,670 4,046 3,524 1,945
Table 19: Scheme Funded from Social Security Fund
Feasibility
| Feasibility |
|
|
|
|
|
£'000 |
| 2024 Estimate | 2025 Estimate | 2026 Estimate | 2027 Estimate | |
Feasibility |
| 1,706 | 982 | 700 | 1,094 | |
Feasibility Total |
| 1,706 | 982 | 700 | 1,094 | |
Table 20: Feasibility |
|
|
|
|
|
The Government of Jersey adopts a project gateway approach to project investment decision making. Individual projects and their associated costs are committed to after detailed, feasibility work has been completed. This helps to ensure that funding allocated to projects through the Government Plan reflects the Government's best estimate of likely resource requirements based on detailed policy and feasibility planning.
An allocation for feasibility is included in the plan to provide funding to allow departments to undertake an assessment of new proposals and develop robust Outline Business Cases, which will become the basis for subsequently agreeing the individual budget allocations for new projects.
The allocation for feasibility funding is a grouped head of expenditure. As such it provides funding for indicative projects but, reflecting the potential for policy and planning to evolve, allows for flexibility within the approved amount. This allows funding to be reallocated where projects progress faster or slower than forecast. To improve flexibility and prevent delay, emerging projects can also receive feasibility funding in year, subject to appropriate approvals.
Table 21 sets out current feasibility plans for Government Plan 2024-27. New feasibility funding requirements identified in this Plan include a project multi-year expansion of the Island's cycling and walking infrastructure, work surrounding the development of Coronation Green Way, and the development of plans for a revitalisation of the markets in St Helier.
This Government Plan provides initial exploratory funding for the first in a series of projects required to deliver the Shoreline Management Plan (SMP). The Plan is intended to enable the Island to manage the risk of coastal erosion and flooding linked to rising sea levels driven by climate change.
The Havre des Pas scheme, to protect that area of St Helier from flooding risk, is the first of these projects to begin this exploratory work. Once completed, future Government Plans would provide funding for the scheme to be implemented in future years.
Within this Government Plan, the department for Children, Young People, Education and Skills will undertake a number of feasibility projects, aimed at improving the existing education estate, as well as developing new infrastructure assets for the benefit of young people. Work that the department will focus on over the next four years includes the creation of a new town primary school and the development of Mont à L'Abbé Secondary school, as well as improvements to fields and play space, music development and youth services.
A section was added to the Public Finances Manual in 2023 which sets out further requirements in terms of managing these budgets.
Feasibility - Breakdown of Grouped Head of Expenditure
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate
- Emerging Projects 100 100 100 100
- Crematorium 500 - - -
- Cycling and Walking Infrastructure Delivery Programme 285 - - -
- Markets Revitalisation 250 - - -
- Coronation Green Way 250 - - -
- Vehicle Testing Service 186 - - -
- Shoreline Management Plan - Havre des Pas - 542 400 544
- Education Estate 135 340 200 450
Feasibility 1,706 982 700 1,094 Table 21: Feasibility - Breakdown of Grouped Head of Expenditure
Estates
| Estates |
|
|
|
|
|
|
|
|
Project |
|
| Spon | Supp | 2024 | 2025 | 2026 | 2027 |
Total £'000 Dept Dept Estimate Estimate Estimate Estimate 4,500 Crematorium CLS CLS - 3,500 1,000 - 23,000 Mont à L'Abbé Secondary (M) CYPES I&E 1,000 8,000 8,000 6,000 7,500 Le Squez (M) CYPES I&E 3,500 4,000 - -
New School and Educational
- Developments
- Upgrades to CYPES Estates
11,731 Jersey Opera House (M)
4,953 Elizabeth Castle
Learning Difficulties - Specialist 9,350 Accommodation (M)
Health Services Improvements 26,940
Programme
9,402 Oakfield and Fort Regent Decant
(M)
3,923 Office Modernisation (M)
7,500 Major Refurbishment and Upgrades
- Property Dilapidations
- Land Acquisition
- Markets Revitalisation Project
- Other I&E Estate Projects
CYPES I&E CYPES CYPES
ECON I&E ECON ECON
HCS HCS HCS HCS I&E I&E
I&E I&E I&E I&E I&E I&E I&E I&E I&E I&E I&E I&E
- -
10,721 10,283 5,522 2,000 1,088 -
4,037 1,624 5,000 2,595 2,500 4,809
2,361 - 2,500 5,000
- -
- -
- -
2,050 1,000
13,500 21,000 8,782 1,550
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
1,000 1,000
Ambulance, Fire & Rescue
24,403 Headquarters (M) JHA JHA 750 - 388 2,685 4,993 Army and Sea Cadets Headquarters JHA JHA - 4,774 - -
4,291 Dewberry House - Sexual Assault SoJP SoJP 3,315 500 - -
Referral Centre
12,895 Prison Improvement Works JHA I&E 1,384 - - - 155,381 Total 45,728 48,085 32,670 32,235
Table 22: Estates | (M) indicates a Major Project
Customer and Local Services Estate
In line with assessment replacement plans, the Crematorium is due for refit and refurbishment to ensure this essential part of the Island's infrastructure can continue to reliably deliver services to Islanders.
Children, Young People, Education & Skills (CYPES) Estate
As part of the Government Plan 2023-26, the Council of Ministers proposed substantial restructuring of plans for the CYPES Estate. To enable this re-prioritisation process, funding was consolidated within two grouped heads of expenditure.
After further work to develop plans for priority projects, two new Major Projects are created in this Government Plan utilising funding previous allocated to the Grouped Heads of Expenditure referred to above. These projects are:
• a new secondary school at Mont à L'Abbé – will expand the Island's provision of care and learning for children with moderate to severe learning difficulties, creating an environment tailored to their needs. In combination with the primary school, this single campus will create a specialised hub to accommodate learning from ages 0-25 as well as respite care.
• a new youth centre at Le Squez - will create a new community hub and space for young people in the community to use and enjoy. Providing a link to other youth centres across the Island and a safe place for children and young people to meet and socialise.
The remaining funding for investment in the CYPES Estate remains within the grouped heads of expenditure. New Schools and Education Developments grouped head of expenditure provides funding to support efforts to construct new educational facilities. The Upgrades to CYPES Estates grouped head of expenditure provides funding for a broader range of needs including efforts to improve the condition of the existing CYPES estate, expand youth service facilities, and improve sports fields and play spaces. Table 23 shows an indicative allocation, with the grouped head of expenditure giving the flexibility to reprioritise as needed based on the urgency and readiness of projects in year.
The funding of at least of £4.705m, (approved in the Government Plan 2020-2023 and Government Plan 2021-2024) for the Le Rocquier School and Community Sports Facilities will be reviewed with the intent that the project is reprioritised, in order to improve access to sports facilities in the East of the Island.[1]
Upgrades to CYPES Estates - Breakdown of Grouped Head of Expenditure
Spon Supp 2024 2025 2026 2027 £'000 Dept Dept Estimate Estimate Estimate Estimate
- Schools Improvements CYPES CYPES 5,764 2,625 3,429 850
- DDA Works CYPES CYPES 700 700 700 700
- Highlands College and University College Jersey CYPES CYPES - 1,395 1,565 -
- Therapeutic Children's Homes CYPES CYPES 750 - - -
- Residential Homes & Secure Settings CYPES CYPES 500 500 500 -
- Music Development CYPES CYPES 200 2,000 2,400 -
- Field Developments & Play Space CYPES I&E 2,257 2,063 188 -
- Youth Services CYPES I&E 550 1,000 - - Upgrades to CYPES Estates 10,721 10,283 8,782 1,550
Table 23: Upgrades to CYPES Estates - Breakdown of Grouped Head of Expenditure
Investment in Arts, Heritage and Culture
This plan continues the funding for the restoration and modernisation of the Jersey Opera House to allow it to re-open and resume its leading role in the Island's cultural life. Continued funding is also provided to complete the refurbishment and redevelopment of the Hospital Block and Officers' Barracks at Elizabeth Castle together with various other improvement works on the site that will allow Jersey Heritage to expand its offering to Islanders.
Health and Community Services Estate
Funding continues in this Plan to support essential works within the HCS estate. This includes the development of specialist accommodation for Islanders with learnings difficulties and a rolling programme of renovations within the General Hospital. Due to the current hospital's age, on-going refurbishment works are required to ensure the delivery of safe and modern services pending the construction of New Healthcare Facilities to meet the Island's long-term health and care needs.
Health and Community Services are able to utilise funding from Charitable Funds. These are held by the department and used for specific purposes. These have been used to continue the renovation of In-Patient Ward s, and the department is able to spend up to £749,000 in 2024.
Infrastructure and Environment Estate
Investment in sport
In line with previous Government Plans, the current capital programme provides the funding to complete the decant of Fort Regent whilst enabling the development of a new sports centre at Oakfield as replacement venue for the clubs and associations.
This investment is a significant early development that is connected to a wider programme of future investment that will be considered in future Government Plans to deliver a comprehensive sport strategy for the Island. Realising this broader vision for sport will require a separate funding strategy in due course.
Major refurbishments and upgrades
Jersey Property Holdings, the division of the Department for Infrastructure and Environment that manages the Government's estate is currently undertaking an extensive condition survey of Government-owned properties. This work is due to complete in the fourth quarter of 2023 and is expected to identify a need for significant investment to improve the condition of the Government's property portfolio.
Initial funding is provided to respond to the highest priority projects that are identified once the condition surveys are completed. A business case for additional investment will then be brought forward for the next Government Plan once the actual investment needs are known and a plan has been developed for remedial works that can be implemented over appropriate timescales. This head of expenditure will also support delivery of a project to refurbish the Lido at Havre des Pas.
Office Modernisation and Property Dilapidations
During the first year of this Government Plan, construction will finish on the new headquarters for the Government on the site of Cyril Le Marquand House and funding is provided to see this project through to its successful completion and allow various Government departments to move into the single Government Headquarters.
The new office will be leased from its developer, but the Government of Jersey has an option to purchase the premises. A decision on whether to exercise this option is expected within this Government Plan period. The associated funding requirements would be met from other Government Funds rather than the Consolidated Fund, and the purchase could provide an investment opportunity for a Government Local Infrastructure Investment Fund.
Land Acquisition
The Government's land and property holdings are under review and there may be a need for a strategic rebalancing of Government of Jersey owned properties through disposals and acquisitions to ensure that Government's land and estates portfolio is optimised to support the delivery of the Island's needs.
This head of expenditure exists to allow the Government to make strategic purchases. It is expected that in the near term this head of expenditure will be used to secure sites relating to the development of a new primary school in St Helier. The school would be set in an extension to the Millennium Town Park and Islanders should enjoy the maximum possible community access to and use of its facilities.
In addition, the current Springfield School and Le Bas Centre sites will be transformed into new community open spaces, helping to create green access corridors for moving to and around the new school, and improvements to public realm and local active travel access routes, including to St. Saviour schools.
No funding has been allocated in the plan, as it is expected that any purchases would be funded through the application of receipts of one-off income, asset disposal proceeds and land swaps.
Other Estate Projects
This includes budgets for the implementation of the Discrimination Law, Safeguarding and Regulation of Care across the Government Estate, and the continuing development of Skateparks.
Other I&E Estate Projects - Breakdown of Grouped Head of Expenditure
Spon Supp 2024 2025 2026 2027 £'000 Dept Dept Estimate Estimate Estimate Estimate
- Community Site Improvements (DDA) I&E I&E 1,000 1,000 1,000 1,000
- New Skateparks I&E I&E 1,050 - - - Other I&E Estate Projects 2,050 1,000 1,000 1,000
Table 24: Other I&E Estate Projects - Breakdown of Grouped Head of Expenditure
Justice, Home Affairs and States of Jersey Police Estate
This Government Plan provides funding for a new Ambulance, Fire & Rescue Headquarters on a profile that reflects the new timing for that Major Project as decisions around site selection are on-going. Associated investment in new facilities for the Army and Sea Cadet Headquarters is provided to enable construction in 2025, which helps to facilitate the redevelopment of the former Police Headquarters.
Funding from the Criminal Offences Confiscation Fund (COCF) is provided to enable the completion of the Sexual Assault Referral Centre at Dewberry House and improvements to HM Prison La Moye.
Infrastructure
| Infrastructure |
|
|
|
|
|
|
Project Total | £'000 | Spon Dept | Supp Dept | 2024 Estimate | 2025 Estimate | 2026 Estimate | 2027 Estimate |
- Infrastructure Rolling Vote and Public Realm
88,635 Sewage Treatment Works (M)
15,644 Liquid Waste Key Infrastructure (M)
845 Springfield Pitch & Floodlights
- Shoreline Management Plan - Havre des Pas
- Planning Obligation Agreements
- Road Safety
- Countryside Access and Signage
- Other Infrastructure
I&E I&E 18,950 I&E I&E 2,733 I&E I&E 5,171 I&E I&E - I&E I&E - I&E I&E - I&E I&E - I&E I&E - I&E I&E 3,190
19,350 19,350 19,350 700 - - 10,473 - - 5 840 -
- - -
- - -
- - -
- - -
2,818 4,305 3,230
105,124 | Infrastructure |
|
| 30,044 | 33,346 | 24,495 | 22,580 |
Table 25: Infrastructure | (M) indicates a Major Project
Infrastructure Rolling Vote and Public Realm
The Infrastructure Rolling Vote and Public Realm programme is the most significant programme of infrastructure investment in the Government Plan.
The Infrastructure Rolling Vote is a programme of continual improvements to maintain key infrastructure such as the Island's roads, drains and sea defences, which need continual maintenance and replacement over time. This is critical ongoing activity that is integral to the continued functioning of critical infrastructure that Islanders depend on.
Funding for Public Realm is included within the rolling vote, to allow for the continual improvement and safety of roads, paths and public spaces in and around St. Helier and across the Island. Additional investment of £3m per year has been made this year in recognition of the need to significantly improve the public realm in St Helier, working in collaboration with the Parish of St Helier and relevant stakeholders. This brings the total amount of funding available for Public Realm across the years of this Government Plan to £5m per annum.
Following an amendment to the Government Plan 2023, the Infrastructure Rolling Vote and Public Realm will continue urban renewal work for St Helier including Havre des Pas.
A section was added to the Public Finances Manual in 2023 which sets out further requirements in terms of managing these and similar budgets.
Sewage Treatment Works
Funding continues in this Government Plan to complete the replacement of Sewage Treatment Works at Bellozanne. It is envisaged that this long-term project will reach completion in 2025.
Liquid Waste Key Infrastructure
This Government Plan provides substantial new investment in the Island's drainage infrastructure to deliver the Liquid Waste Strategy.
To realise the housing development needs identified in the Bridging Island Plan and support policy response to the Island's housing crisis, radical investment is needed in the Island's surface water and foul sewage drainage network. The existing network has very little spare capacity and is already sensitive to periods of heavy rainfall. Consequently, it is unable to accommodate the additional demand that would be placed on it by new homes and this is proving a significant impediment to the approval of planning permission for new developments.
To meet the Island's housing needs, a substantial redevelopment of the network is needed. Strategic storage tanks need to be built around the Island to cope with surges in surface wastewater and prevent the central system becoming overloaded. In addition, improvements need to be made to increase the pumping station capacity and replace aging pipe infrastructure to enable it to cope with increased volumes.
The scale of investment needed exceeds the level of funding that can readily be made available through the Government Plan. The Scheme needs in excess of £55m over the four years of this Government Plan and an on-going investment of £5 -10m is likely to be required thereafter. Considering the scale of investment needed, this Government Plan provides an initial investment of £15.6m to meet the needs of the project in 2024 and 2025. Investment in future years will be predicated on the introduction of a new charging mechanism to be developed for consideration in Government Plan 2025-28.
Further Listed Infrastructure Projects
Heads of expenditure are also included for Countryside Access and Signage, Road Safety and Planning Obligation Agreements. Funding for these heads of expenditure is generated from programme underspends in the case of countryside projects, and from income from car park trading funds and third-party planning applications for developments respectively for the latter projects.
Funding is provided to a head of expenditure for the replacement of Springfield football pitch and lights.
Other Infrastructure
A Grouped head of expenditure for all other infrastructure projects includes funding for the La Collette Waste Site, and the extension of the Island's sewage network. There is additional investment in Parks and Gardens, upgrading our equipment and open public spaces.
Other Infrastructure - Breakdown of Grouped Head of Expenditure
Spon Supp 2024 2025 2026 2027 £'000 Dept Dept Estimate Estimate Estimate Estimate
- La Collette Waste Site Development I&E I&E 1,500 1,133 2,845 2,005
- Parks & Gardens Upgrades I&E I&E 690 685 460 225
- Drainage Foul Sewer Extensions I&E I&E 1,000 1,000 1,000 1,000 Other Infrastructure 3,190 2,818 4,305 3,230
Table 26: Other Infrastructure - Breakdown of Grouped Head of Expenditure
Information Technology
| Information Technology |
|
|
|
|
|
|
Project Total | £000 | Spon Dept | Supp Dept | 2024 Estimate | 2025 Estimate | 2026 Estimate | 2027 Estimate |
10,261 Cyber Programme 2.0 (M)
6,257 Digital Services Platform (M)
16,185 Digital Care Strategy (M)
3,000 Jersey Care Model - Digital Systems
850 Next Passport Project
3,585 Regulation Improvement to Digital Assets 9,425 Revenue Transformation Programme (Phase 3)
(M)
11,274 Revenue Transformation Programme (Phase 4)
(M)
CBO CBO 1,096 CBO CBO 2,194 HCS CBO 5,305 HCS CBO 1,000 JHA JHA - I&E I&E 1,065
T&E T&E 1,986 T&E T&E 3,230
2,514 3,608 3,403 1,289 1,387 1,387 663 - - 543 - - 250 425 175
- - -
1,316 - - 1,800 3,122 3,122
- Other Government Wide IT Projects CBO CBO 1,277 - - -
5,315 Court Digitisation JG JG 1,700 1,407 245 - 650 Replacement LC-MS system OA OA - - 650 -
Probation/Prison Offender Case Management
770 system PRO PRO 500 110 110 - 974 Automatic Electoral Registration SA CBO 809 75 45 45
68,546 | Information Technology |
|
| 20,162 | 9,967 | 9,592 | 8,132 |
Table 27: Information Technology | (M) indicates a Major Project
Information Technology Investment
This Government Plan continues the substantial investments in technology that have been made through successive Government Plans.
Alongside the introduction of three new Major Projects, outlined in greater detail below, funding is available to complete projects intended to support the digital transformation of health services, Revenue Jersey and regulatory functions within the Department for Infrastructure and Environment.
Cyber Programme 2.0
Additional investment is proposed for a second Major Project to strengthen Cyber Security across government. This builds on the foundations established by the Cyber Programme which was completed in 2023 and seeks to ensure that Government is able to adequately respond to the heightened cyber threat related to the new geopolitical risk landscape.
Revenue Transformation Programme (Phase 4)
Recent developments in the international tax landscape including the requirement for automatic exchange of tax information, and evolution in the local tax regime such as the adoption of new legislation around economic substance and independent taxation have created a need for substantial changes to Revenue Jersey's IT systems. In order to ensure the relevant systems are able to manage with the additional complexity in tax legislation and meet the Island's international obligations, a new Major Project has been created to implement the necessary changes and support the increased running costs of a more complex system once the amendments have been implemented.
Digital Services Platform
A new Major Project to support the further digital transformation of customer facing public services is established in this Plan. The project builds on prior investments in service digitalisation and makes use of technology and methods that were used to rapidly launch a new range of online services during the pandemic. It will deliver a new platform that will enable the creation of an online service hub and integrate a disparate range of existing government systems with a view to radically improving the public's experience of dealing with government online as well as enabling the improved use of data to inform developments in public policy.
Other Government Wide IT Projects - Breakdown of Grouped Head of Expenditure
Spon Supp 2024 2025 2026 2027 £'000 Dept Dept Estimate Estimate Estimate Estimate Records Transformation Programme[1] CBO CBO 1,277 - - - Other Government Wide IT Projects 1,277 - - -
Table 28: Other Government Wide IT Projects - Breakdown of Grouped Head of Expenditure
Replacement Assets and Minor Capital
| Replacement Assets and Minor Capital |
|
|
|
|
|
|
Project Total | £000 | Spon Dept | Supp Dept | 2024 Estimate | 2025 Estimate | 2026 Estimate | 2027 Estimate |
- Replacement Assets and Minor Capital – CBO
- Replacement Assets and Minor Capital – CYPES
- Replacement Assets and Minor Capital – HCS
- Replacement Assets and Minor Capital - I&E
3,332 Fisheries Protection Vessel & Auxiliary Vessels
- Replacement Assets and Minor Capital – JHA
- Replacement Assets and Minor Capital – SoJP
CBO CBO CYPES CYPES HCS HCS I&E I&E I&E I&E JHA JHA SoJP SoJP
2,500 2,500 250 300 2,000 2,500 5,350 4,550
- 2,800
380 136 200 350
2,500 2,500 300 300 2,500 2,500 4,550 4,550
- -
- -
350 350
3,332 | Replacement Assets and Minor Capital |
|
| 10,680 | 13,136 | 10,200 | 10,200 |
Table 29: Replacement Assets and Minor Capital
Replacement asset funding is provided to departments which are typically required to replace key operational equipment on an annual basis to ensure our assets are maintained at an appropriate standard for the ongoing delivery of public services.
Funding is generally provided at a consistent level that is aligned with the average replacement cycles as equipment reaches the end of its safe useful life and needs replacing for newer equipment. Specific funding is also provided in 2025, for the replacement of the Fisheries Protection Vessel.
Major Incident Response, Recovery and Regeneration
Following the series of Major Incidents in December 2022 and January 2023, a head of expenditure is being made available as the continuation of the Government's response to these events. As these estimates for any requirements continue to be developed, no funding has been provided in the plan. It is anticipated that any funding requirements would be met through reallocations of project underspends, along with any potential insurance claims. This funding would need to be prioritised as various programmes or projects are developed to support the recovery activities.
Reserve for Central Risk and Inflation
Most projects in general do not carry a contingency for future increased inflation, therefore a central reserve head of expenditure is available to provide additional allocations to projects impacted by inflation or the realisation of risks that have cost implications.
The level of reserve funding was increased in 2023 and remains held at a higher level in 2024 reflecting on-going inflationary challenges. Provisions are reduced in future years as price assumptions for significant projects have been uprated, the Fiscal Policy Panel forecasts lower rates of inflation in the latter year of this Government Plan, and despite high inflation in 2022 and 2023, the amounts held in reserve in those years were not fully drawn upon.
| Reserve for Central Risk and Inflation |
|
|
|
|
|
|
|
|
| Spon | Supp | 2024 | 2025 | 2026 | 2027 |
£'000 Dept Dept Estimate Estimate Estimate Estimate
Reserve for Central Risk and Inflation T&E T&E 5,000 1,000 1,000 -
Reserve for Central Risk and Inflation 5,000 1,000 1,000 - Table 30: Reserve for Central Risk and Inflation
Establishment of and Changes to Major Projects
In addition to cash flow for 2023, the Government Plan approves the total expenditure for projects designated as Major Projects including any updates to existing Major Project approvals that may be necessary. The total approvals for new and existing Major Projects in this plan are as set out in Table 31:
Major Projects |
|
|
|
|
|
£'000 | Spon Dept | Supp Dept | Previous Total | Total Project Approval | Change |
Jersey Opera House ECON I&E 11,731 11,731 -
Cyber Programme 2.0 CBO CBO - 10,621 10,621
Digital Services Platform CBO CBO - 6,257 6,257
Le Squez CYPES I&E - 7,500 7,500
Mont à L'Abbé Secondary CYPES I&E 23,000 23,000
Learning Difficulties - Specialist Accommodation HCS HCS 9,350 9,350 -
Digital Care Strategy HCS CBO 16,185 16,185 -
Sewage Treatment Works I&E I&E 88,635 88,635 -
Liquid Waste Key Infrastructure I&E I&E - 15,644 15,644
Oakfield and Fort Regent Decant I&E I&E 9,402 9,402 -
Office Modernisation I&E I&E 3,923 3,923 -
Ambulance, Fire and Rescue Headquarters JHA I&E 24,403 24,403 -
Revenue Transformation Programme (Phase 3) T&E T&E 9,425 9,425 -
Revenue Transformation Programme (Phase 4) T&E T&E - 11,274 11,274 Table 31: Major Projects
Use of Public Land for Public Benefit
New development on public land, whether that is owned by Government or a States' Owned Entity, creates value that can be reinvested to benefit the public. Recognising that housing is increasingly unaffordable for many islanders, the new Bridging Island Plan includes a policy expectation that;
Where States of Jersey or States-owned companies' land is brought forward for the development of new homes, these shall be for affordable homes unless it has been otherwise approved that the development needs to specifically provide open market homes, particularly where this is required to ensure the viability of public realm and community infrastructure delivery, in line with an approved Government Plan.'
The creation of affordable homes brings real public benefits to Jersey. They help create an inclusive society, where all children can get a good start in life and where our family and friends can live and age well.
A broad strategy to create and maintain affordable homes is in place and is focused on direct support to Andium Homes to build 3,000 new affordable homes by 2030, and a range of policy steps to increase the use of assisted purchase products, such as shared equity schemes, in the open market. Government invests in affordable housing in a number of ways, for example:
• £250m of public borrowing provides stable, low-cost financing to Andium Homes, and has supported other housing trusts;
• affordable homes for rent are subsidised, on average, by more than 20% of market rates, and affordable homes for purchase – such as through the Andium Home Buy scheme – ensure properties can be purchased below their open market value, subject to affordability criteria;
• £10m will be invested in a forthcoming assisted home ownership scheme; and
• land is made available through the planning process to ensure more affordable homes can be built – whether on rezoned sites or in developments on public land.
In assessing whether land and sites that are currently owned by the Government of Jersey, are developed for housing, there is an ongoing assessment via the Estates Strategy. This process determines whether these sites are needed for public service delivery or can be released. Once a site has been identified for housing, government must consider the need to provide affordable homes, as well as the need to raise sufficient capital to be reinvested in other areas that benefit the public, such as new infrastructure or public realm
improvements. When land is used to build affordable homes, a portion of the market value that would otherwise be achieved is forfeited by the public, limiting the amount that can be reinvested to meet other public needs. Because of this, it is sometimes appropriate to build open market homes to ensure the best overall value for the public is realised.
The table below sets out sites in public ownership that are due to deliver housing and confirms whether the value created will be used to subsidise the creation affordable homes, or whether a portion of open market homes is expected to be included and, if so, what wider public benefit the value created from those homes will be used for. There will always be a very minimum of 15% of the housing units created that will be made available with assisted purchase products.
Site | Tenure | Public Value to be Delivered |
Aviemore | Open market homes | The creation of a fund to support care- experienced islanders |
Huguenot House | 100% Affordable homes | 100% of the development will be affordable homes |
Philip le Feuvre House | 100% Affordable homes | 100% of the development will be affordable homes |
South Hill | Minimum 15% assisted purchase | A proportion of assisted purchase homes and, the creation of a capital receipt to invest in affordable homes in other locations |
St Saviour's Hospital | Maximum viable number of affordable homes | Affordable homes and adequate funding to secure the refurbishment and future security of the Grade 1 listed building |
Waterfront | Minimum 15% assisted purchase | A proportion of assisted purchase homes and, public realm improvements, including landscaping and new shared |
|
| open space; a new sports facility; |
|
| improvements to sea defences and |
|
| access; improvements to Route de la |
|
| Liberation and the Esplanade; and a modern public parking facility. |
Sites to be developed in between Government Plans
It is important to recognise that States of Jersey or States'-owned companies land may be identified for the development of new homes in between Government Plans, and it is considered important that housing delivery is not unacceptably slowed as a result of misalignment with the Government Plan annual cycle.
In the event of a housing development making progress outside of the Government Plan, Ministers will work together to ensure that the development is proposed entirely for affordable homes and, in the case of this not being considered possible, that there is both sufficient rationale for deviating from this policy, whilst ensuring the development will achieve the required minimum of 15% of units for assisted purchase schemes.
The Minister for Treasury and Resources will give consideration as to whether a revision to the Government Plan is required to incorporate the details of the development, based on the scale and nature of the deviation being proposed. All cases and regardless of any decision to not revise the Government Plan, the proposed tenure of homes will be tested publicly in the consideration of the planning application, in accordance with the Bridging Island Plan and Planning and Building (Jersey) Law 2002.
New Healthcare Facilities Project
The New Healthcare Facilities (NHF) Summary Strategic Outline Case (R.111/2023[1]) and feasibility study (R.112/2023) were presented to the Assembly on 4th July 2023. The documents brought forward describe the Council of Ministers' preferred option to deliver a programme of capital construction works representing a holistic replacement of Jersey's health and care facilities over an eight-year period. The key elements of the planned work include delivery of:
• An acute facility at Overdale.
• Ambulatory facilities at Kensington Place and utilising some of the existing Jersey General Hospital site.
• A Health Village at St Saviours.
• The Enid Quenault Health and Wellbeing Centre at Les Quennevais, utilised on a longer-term basis.
The Council of Ministers has agreed to proceed under a phased approach, to manage financial and economic risk. We know that our current facilities are deteriorating, and failure of our acute services represents the biggest risk to delivery of health and care services, so we intend to replace these in Phase 1.
The phased approach allows costs and risk to be managed by spreading the commitment to spend over a longer period, across multiple projects. It will also provide better opportunities for modern methods of construction and minimise delays in construction due to site size and accessibility.
In addition, this approach will provide a longer timeframe to for clinical strategies to be developed for future ambulatory facilities–- these services being those most impacted by settings of care and future transformational interventions. This approach also provides increased capacity for future expansion on both acute and ambulatory sites.
We are clear on our commitment to deliver New Healthcare Facilities and to get the best possible value for Jersey, without delay. We are currently working on the programme, which estimates that the total cost to deliver an acute facility at Overdale and make meaningful progress on development of the future phases covering an ambulatory facility and Health Village at no more than £710m, including £675m during this Government plan period. However, we need to further develop and refine the proposals to support decision makers and will do so as we progress the designs for the facility. We will have better cost certainty before the end of Q1 2024, which means that this estimate might reduce. The programme team will continuously challenge planning assumptions during design and contracting stages with a view to reducing costs, communicating progress regularly to key stakeholders including Ministers, Scrutiny and States Members.
Healthcare Facilities – Capital Estimate
2024 2025 2026 2027 2028> Total £'000 Estimate Estimate Estimate Estimate Estimate Estimate Healthcare Facilities 70,000[2] 112,000 179,000 314,000 35,000 710,000
Table 32: Healthcare Facilities- Capital Estimate
Therefore, we anticipate the need to amend the approved Government Plan 2024-2027, to seek approval from the States Assembly on the substantive funding element to deliver Phase 1 of the programme. Nevertheless, funding will be required for 2024 to progress to this point and to minimise the risk of any delay in delivery. In 2024 we will:
• Bring forward a standalone Proposition to seek approval for delivery of Phase 1 of the programme and its financing.
• Continue high level design and planning work for the whole programme of New Healthcare Facilities.
• Continue demolition works at Overdale, which are planned to start before the end of 2023.
• Improve the Kensington Place site in 2024.
• Deliver any decant facilities necessary for the above works.
|
| Healthcare Facilities Capital Expenditure |
|
|
|
|
|
<2023 Estimate |
| £'000 |
|
|
|
| 2024 Estimate |
60,360[3] |
| Healthcare Facilities |
|
|
|
| 52,000 |
60,360 |
|
|
|
|
|
| 52,000 |
Table 33: Healthcare Facilities Capital Expenditure
|
| Healthcare Facilities Strategic Reserve Movements |
|
|
|
|
|
<2023 |
|
| 2024 | 2025 | 2026 | 2027 | |
Estimate |
| £'000 | Estimate | Estimate | Estimate | Estimate | |
(4,700) |
| Transfer to Consolidated Fund - Financing costs | (7,820) | (8,074) | (6,494) | (5,830) | |
(90,071) |
| Transfer to Consolidated Fund - Capital costs | (52,000) | - | - | - | |
90,071 |
| Borrowing Proceeds | 52,000 | - | - | - | |
(4,700) |
|
| (7,820) | (8,074) | (6,494) | (5,830) |
Table 34: Healthcare Facilities Strategic Reserve Movements
Table 34 above, shows the resultant inflows (borrowing proceeds) and outflows (transfers to the Consolidated Fund) through the Strategic Reserve.
Healthcare Facilities Financing Strategy
The agreed financing of the previous Our Hospital project was based on a strategy of borrowing, with both the interest costs and the eventual repayment of the borrowing paid for
through investment returns on the Strategic Reserve.
In May 2023 the Minister for Treasury and Resources approved the replacement of the existing revolving credit facility (RCF) with a new facility for £300m, with an accordion option of £200m, expiring in 2028.
The funding of the £52m in 2024 will be through the RCF, bringing the total amount of borrowing required to £142m by 2024, including £29m relating to the previous Our Hospital project. In line with previous decisions, any borrowing will be held in the Strategic Reserve and transferred to the Consolidated Fund as required. The financing costs will also continue to be met from the Strategic Reserve in the short term.
The financing strategy for the full costs of the acute facility will be included in the Outline Business Case and be included in the proposition planned for summer 2024.
Table 35, sets out the estimated financing costs based on the borrowing required up to £142m, utilising the RCF facility, through the Healthcare Facilities – Financing Costs Head of Expenditure.
|
| Healthcare Facilities Revenue Expenditure |
|
|
|
|
|
<2023 Estimate |
| £'000 |
| 2024 Estimate | 2025 Estimate | 2026 Estimate | 2027 Estimate |
4,700 |
| Healthcare Facilities - Financing Costs |
| 7,820 | 8,074 | 6,494 | 5,830 |
4,700 |
|
|
| 7,820 | 8,074 | 6,494 | 5,830 |
Table 35: Healthcare Facilities Revenue Expenditure
The Government of Jersey Balance Sheet and States Funds
The balance sheet provides a snapshot of the States financial position, setting out what we own, what we owe and what is owed at that point in time. This provides an understanding of the long-term financial risks that we face.
The balance sheet is comprised of four main components:
- Non-current assets: This considers the longer-term assets that we have available to deliver services and outcomes. It includes the buildings that we own, along with other equipment that will be used over many years (e.g. IT, vehicles, roads, sea defences, and other infrastructure), the long-term strategic investments that we have made to deliver a return, and loans that we have issued to other organisations.
- Working capital or net current assets: These represent the net day-to-day resources available to us. These include the cash that is held in our bank accounts, the amount owed to us from creditors within the next 12 months; as well as the amount we need to repay to individuals and organisations within the next 12 months.
- Non-current liabilities: Our liabilities include loans and bonds that have been taken out to fund capital projects, the long-term liabilities related to our pension funds and any other provisions that we need to make because of past actions and activities where there is a strong obligation that these will need to be repaid.
- Taxpayers' equity: Taxpayers' equity represents the accumulation of previous surpluses and deficits and is equal to the total net assets that we hold.
Government of Jersey Balance sheet
Our Island has maintained a strong balance sheet position, and this is forecast to be maintained throughout this Government Plan, with net assets continuing to increase. Our property and equipment assets will increase as we invest in capital projects above the level of depreciation.
Both government and our subsidiary companies will be investing in Property and Equipment assets, including substantial investment to the harbour by Ports of Jersey, funded in part by borrowing by Ports of Jersey.
We will continue to protect our capital reserve funds, investing in line with agreed investment strategies, informed by the advice of the Treasury Advisory Panel. We will reinvest returns to ensure that our investment balance grows to help manage risks and protect the long-term sustainability of the Island's finances.
Balance Sheet Forecast
2022 2023 2024 2025 2026 2027 Actual £'000 Estimate Estimate Estimate Estimate Estimate
Non-current assets
4,469,822 Property and Equipment 4,625,007 4,759,878 4,845,345 4,835,326 4,839,022 475,718 Loans and Other Assets 475,718 475,718 475,718 475,718 475,718 327,821 Strategic Investments 327,821 327,821 327,821 327,821 327,821 2,987,120 Investments 3,047,970 3,113,103 3,275,773 3,514,703 3,736,951 8,260,481 Non-Current Assets 8,476,516 8,676,520 8,924,657 9,153,568 9,379,512 595,278 Net-Current Assets (Working capital) 515,278 446,278 421,278 411,278 411,278
Non-Current Liabilities
49,247 Provisions 49,247 49,247 49,247 49,247 49,247 857,707 Borrowing 849,100 848,103 908,869 921,259 902,580 1,417 Pension Liabilities 1,417 1,417 1,417 1,417 1,417 908,371 Non-Current Liabilities 899,764 898,767 959,533 971,923 953,244 7,947,388 Net Assets 8,092,030 8,224,031 8,386,402 8,592,923 8,837,546 7,947,388 Taxpayers' Equity 8,092,030 8,224,031 8,386,402 8,592,923 8,837,546
Table 36: Balance Sheet Forecast
States Borrowing
The States has issued external bonds totalling £750m; £250m issued in 2014 for the provision of social housing, and £500m issued in 2022 to refinance the pre-existing pension past service liabilities, with the remaining being used to fund work on the New Healthcare Facilities project. Further details on these borrowings are included in the debt framework.
In May 2023 the Minister for Treasury and Resources approved the replacement of the existing revolving credit facility with a new facility for £300m, with an accordion option[4] of £200m, expiring in 2028. This facility provides flexibility for funding of New Healthcare Facilities and avoids committing to longer-term borrowing at the current higher interest rates. Drawdown of amounts of the Revolving Credit Facility would be subject to borrowing approvals in a Government Plan. A longer-term financing strategy for the New Healthcare Facilities will be developed as part of the more detailed proposals to be presented in 2024.
Under the Public Finances (Jersey) Law 2019, Article 26 (1)(a), the Minister for Treasury and Resources is also permitted to arrange for a bank overdraft in any given year, which can be used to meet immediate unforeseen financing needs should they occur. To minimise the costs to Government, the use of the Revolving Credit Facility will be formally extended to include the provision of funds under Article 26 (1)(a), should they be needed and subject to the appropriate limits of that article.
Any borrowing would be in line with the Debt Framework for Jersey (R.68/2022[5]) and future iterations, which defines the States' approach to debt issuance and management and is designed to operate over a significant long-term time horizon and taking into account the States' ability to raise debt and the required cash flows.
In combination, the Debt and Investment Strategies seek to deliver a sustainable structure to meet the Island's needs whilst minimising the total funding costs over the medium to long- term, consistent with a prudent degree of risk, but at the same time retaining flexibility to react to unknown future events.
The table below sets out the updated borrowing approvals over the period of this Government Plan.
|
| Borrowing Approvals |
|
|
|
|
|
2023 |
|
|
| 2024 | 2025 | 2026 | 2027 |
Approved |
| £'000 |
| Estimate | Estimate | Estimate | Estimate |
90,071 |
| Healthcare Facilities |
| 142,071 | 142,071 | 142,071 | 142,071 |
477,000 |
| Pension Liabilities |
| 477,000 | 477,000 | 477,000 | 477,000 |
250,000 |
| Existing Borrowing Housing Bond |
| 250,000 | 250,000 | 250,000 | 250,000 |
817,071 |
| Borrowing |
| 869,071 | 869,071 | 869,071 | 869,071 |
Table 37: Borrowing Approvals
Consolidated Fund
The Consolidated Fund is the main fund through which the States collects taxes, other income, and spends money in providing services.
Income received or due is accounted for in the Consolidated Fund, except where specified in Law. Expenditure from the Consolidated Fund is approved by the States Assembly in the Government Plan. The Council of Ministers must not lodge a Government Plan which shows a negative balance in the Consolidated Fund at the end of any of the financial years that the plan covers.
There are several planned transfers into the fund from other States Funds. This includes;
• transfers to fund the delivery of specific capital and project expenditure and from the Strategic Reserve to support the Health Care Facilities project. This includes transfers from the Technology Accelerator Fund to support the delivery of Digital Services Platform.
• transfers to the Strategic Reserve to form a sinking fund for the eventual repayment of the pension past-service liability bond.
• transfers to the Climate Emergency Fund based on the hypothecated income from fuel duty and Vehicle Emissions Duty (VED).
• transfers from the Strategic Reserve to the Consolidated Fund of £20m in 2024 and 2025, to allow the full reinstatement of the States Grant to the Social Security Fund. This will be repaid in 2027 when £40m will be transferred back to the Strategic Reserve[1].
The previously agreed transfer from the Health Insurance Fund of £0.8m to fund free GP visits for children has been removed as expenditure is now incurred directly by the Fund.
Receipts relating to prior year basis tax debts have been included in the opening balance, and over the plan period, based on current receipts and an estimated profile of future receipts.
In drafting the Capital Programme for 2024 to 2027, existing approvals amounts that are not expected to be spent in 2022 have been incorporated into future years of the programme and will be released in 2023.
Consolidated Fund
2023 2024 2025 2026 2027 Estimate £'000 Estimate Estimate Estimate Estimate
99,644 Opening Balance 94,802 37,565 2,521 8,541
Operating Surplus/(Deficit)
1,091,966 General Revenue Income 1,190,589 1,243,596 1,279,640 1,327,017 (985,044) Net Revenue Expenditure (1,162,591) (1,199,402) (1,202,037) (1,224,405)
106,922 27,998 44,194 77,603 102,612
Other Movements in Fund Balances
11,000 Prior Year Basis Tax Debt Receipts 11,000 12,500 12,500 12,500 20,000 Release of unspent Capital Allocations - - - -
- Release of unspent Covid-19 Allocations - - - -
31,000 11,000 12,500 12,500 12,500
Capital and Other Projects Expenditure
(140,185) Capital and other projects expenditure (113,320) (106,516) (78,657) (74,241) (140,185) (113,320) (106,516) (78,657) (74,241)
Capital Financing Transfers In
1,811 Criminal Offences Confiscation Fund 777 - - -
- Technology Accelerator Fund 2,194 1,289 1,387 1,387
- Strategic Reserve - Repayment Our Hospital - - - -
1,000 Strategic Reserve - Capital Repayment 336 - - - 2,811 3,307 1,289 1,387 1,387
Fund Transfers In/(Out)
(4,400) Climate Emergency Fund (4,130) (4,006) (3,886) (3,769)
- Strategic Reserve – States Grant[1] 20,000 20,000 - (40,000)
(1,790) Strategic Reserve - Pension Refinancing Repayment (2,167) (2,580) (3,002) (3,436) 800 Health Insurance Fund[2] 75 75 75 75 (5,390) 13,778 13,489 (6,813) (47,130)
- Borrowing Drawdown/(Repayment)
94,802 Closing Balance 37,565 2,521 8,541 3,669 Table 38: Consolidated Fund
Jersey Car Parking Trading Fund
The Jersey Car Parking trading operation manages the provision of the public parking places that are within the functions of the Minister for Infrastructure. Priority is given to maintenance and refurbishment of car parking facilities.
| Jersey Car Parking Trading Fund |
|
|
|
|
|
£'000 |
| 2024 Estimate | 2025 Estimate | 2026 Estimate | 2027 Estimate | |
Opening Balance |
| 18,135 | 18,925 | 20,885 | 22,127 | |
Trading Income |
| 8,335 | 8,516 | 8,712 | 8,712 | |
Expenditure |
| (6,565) | (6,496) | (6,535) | (6,535) | |
Capital Expenditure |
| (980) | (60) | (935) | (935) | |
Closing Balance |
| 18,925 | 20,885 | 22,127 | 23,369 | |
Table 39: Jersey Car Parking Trading Fund |
|
|
|
|
|
Jersey Fleet Management Trading Fund
The Jersey Fleet Management trading operation manages the acquisition, maintenance, servicing, fuelling, garaging and disposal of vehicles and mobile plant and machinery on behalf of the Government of Jersey. Charges are set to recover the up-front cost of the asset, routine maintenance and servicing and the costs of managing the fleet operations.
| Jersey Fleet Management Trading Fund |
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | |
£'000 |
| Estimate | Estimate | Estimate | Estimate | |
Opening Balance |
| 6,254 | 5,479 | 5,282 | 4,823 | |
Trading Income |
| 5,557 | 5,666 | 5,788 | 5,788 | |
Expenditure |
| (3,328) | (3,418) | (3,511) | (3,511) | |
Capital Expenditure |
| (3,004) | (2,445) | (2,736) | (2,736) | |
Closing Balance |
| 5,479 | 5,282 | 4,823 | 4,364 | |
Table 40: Jersey Fleet Management Trading Fund |
|
|
|
|
|
States Funds
The Government has several other States funds established by statute. This provides the public with the confidence that the funds remain ring-fenced and used for the specific purpose for which they were established. For the purposes of investment, the funds are pooled together into the Common Investment Fund, thus achieving the benefits of economies of scale and more effective risk management of the overall Government investment portfolio. Each individual fund has its own investment strategy which reflects the long-term aims of that fund, and investment returns are estimated based on the target investment return for each fund.
| Summary Fund Balances |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | |||||||||
£'000 |
| Estimate | Estimate | Estimate | Estimate | |||||||||
Strategic Reserve Fund |
| 1,051,126 | 1,072,520 | 1,117,825 | 1,206,270 | |||||||||
Stabilisation Fund |
| 634 | 666 | 695 | 723 | |||||||||
The Health Insurance Fund |
| 106,868 | 102,501 | 99,667 | 99,017 | |||||||||
The Long-Term Care Fund |
| 61,084 | 68,297 | 76,236 | 85,620 | |||||||||
The Social Security Fund |
| 94,852 | 108,852 | 120,274 | 129,113 | |||||||||
The Social Security (Reserve) Fund |
| 2,156,012 | 2,270,277 | 2,390,712 | 2,519,810 | |||||||||
Climate Emergency Fund |
| 4,113 | 537 | 537 | 537 | |||||||||
Technology Accelerator Fund |
| 12,475 | 7,021 | 1,449 | 62 | |||||||||
Other Special Funds |
| 46,127 | 47,648 | 48,821 | 49,740 | |||||||||
Funds Net Assets[1] |
| 3,533,291 | 3,678,319 | 3,856,216 | 4,090,892 | |||||||||
Table 41: Summary Fund Balances |
|
|
|
|
|
Local Infrastructure Investment
Previous Government Plans have identified that infrastructure investment in Jersey could provide a way to fund major projects, however these plans were deferred because of the Covid-19 pandemic.
This Government plan has developed those ideas, although the ability to put them into action will depend in part of the States Assembly's decisions on the financing strategy for New Healthcare Facilities for the Island.
Many jurisdictions have successfully established infrastructure funds in various forms, although they are typically a recyclable or evergreen fund, whereby they are reinvested over the medium to long-term to create a sustainable source of funding. Over the long-term investment in high quality public infrastructure supports the functioning of the local economy, generates employment opportunities and improves wellbeing.
Infrastructure funding could ultimately widen the participation of third-party investors (e.g. pension funds or private equity) but initially the proposal would be to only to allocate an element of Government's reserves (Strategic Reserve and Social Security Reserve) towards local infrastructure investment. This could provide the opportunity to fund projects in a different way and reduce the dependency on public sector finances and could be actioned through an updated investment strategy.
It should be noted that these reserves already achieve a long-term return of approximately 6% to 7% per annum, therefore any investment in local infrastructure is expected to produce a similar level of return, albeit that a discount' could be applied to funding for projects which have specific social, environmental or economic benefits or are highly correlated to the delivery of Government policy.
Examples of local infrastructure projects that might deliver a suitable return include:
• exercise the option to purchase the new Government headquarters, with a long-term lease with Government to create a secure and stable return on investment.
• provision of development finance to create key worker accommodation for departments such as Health and Community Services and CYPES. At completion the development loan would be repaid by the developer.
All investments would be considered through a robust business case assessment framework. The Minister for Treasury and Resources will rely on the independent advice of the Treasury Advisory Panel and, if required, other advisors when considering requests for investment funding.
Strategic Reserve Fund
The Strategic Reserve is a permanent reserve, where the capital value is to be used in exceptional circumstances to insulate the Island's economy from severe structural decline such as the sudden collapse of a major Island industry or from major natural disaster. It forms a critical part of the infrastructure of financial and risk management and helps to protect the long-term financial sustainability of the Island.
The Strategic Reserve also supports the £100m of funding, if called upon, for the Bank Depositors' Compensation Scheme. Government Plan 2022 – 2025 agreed for the Strategic Reserve to be used as a "sinking fund" holding amounts for the eventual repayment of debt issued by the States. This includes borrowing relating to the refinancing of the past-service pension liability schemes.
The fund will continue to be used to receive the proceeds of any borrowing relating to the New Healthcare Facilities, with transfers to the consolidated fund to fund expenditure approved in this plan on the programme, and the financing costs. A longer-term financing strategy will be developed as part of the more detailed proposals to be presented in 2024.
The longer-term aim is to grow the Reserve as a percentage of GVA. In their Medium Term Report July 2022, FPP explicitly recommended that the prior-year basis taxation debtor should be used to improve the States Balance Sheet, and transfers to the Strategic Reserve would be appropriate. Ministers have considered how this asset can support the strengthening of the Balance Sheet, including increasing the value of the Strategic Reserve, the Stabilisation Fund and investment in the Island's infrastructure through capital projects. This is a potentially complex issue, and requires the input of the Treasury Advisory Panel, before inclusion in the next Government Plan.
| Strategic Reserve |
|
|
|
|
|
£'000 |
| 2024 Estimate | 2025 Estimate | 2026 Estimate | 2027 Estimate | |
Opening Balance |
| 1,031,972 | 1,051,126 | 1,072,520 | 1,117,825 | |
Investment income Transfer from Consolidated Fund (Pension Refinancing repayment) |
| 45,143 2,167 | 46,888 2,580 | 48,797 3,002 | 50,839 3,436 |
Transfer to Consolidated Fund (Reimbursement of Capital Projects) (336) - - - Transfer to Consolidated Fund (States Grant)[2] (20,000) (20,000) - 40,000 Our Hospital Related; - - - -
- Borrowing Proceeds 52,000 - - -
- Transfer to Consolidated Fund (Borrowing coupon and costs) (7,820) (8,074) (6,494) (5,830)
- Transfer to Consolidated Fund (Capital costs) (52,000) - - -
Closing Balance 1,051,126 1,072,520 1,117,825 1,206,270 Table 42: Strategic Reserve
Stabilisation Fund
The Stabilisation Fund was created in 2006 to manage government finances through the economic cycle, where expenditure could be drawn down in economic downturns and the Fund replenished through surpluses in economic booms and periods of above-trend growth.
The plan proposes transfers to the Fund of up to £25m contingent on the availability of funding in the Consolidated Fund at the end of 2023 or 2024, for example through additional income or unspent approvals if available. As the transfer is contingent, figures are not included in the forecast for the Consolidated Fund or Stabilisation Fund at this point.
| Stabilisation Fund |
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | |
£'000 |
| Estimate | Estimate | Estimate | Estimate | |
Opening Balance |
| 599 | 634 | 666 | 695 | |
Investment income |
| 35 | 32 | 29 | 28 | |
Transfer from the Consolidated Fund |
| - | - | - | - | |
Closing Balance |
| 634 | 666 | 695 | 723 | |
Table 43: Stabilisation Fund |
|
|
|
|
|
Health Insurance Fund
The Health Insurance Fund receives allocations from Social Security contributions from employers and working-age adults and supports the wellbeing of Islanders by subsidising GP visits, the cost of prescriptions and other primary care services. The table reflects the anticipated costs of current services over the period as they are presently provided for.
| Health Insurance Fund |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | ||||||||||
£'000 | Estimate | Estimate | Estimate | Estimate | ||||||||||
Opening Balance | 111,425 | 106,868 | 102,501 | 99,667 | ||||||||||
Social Security Contributions[3] | 47,796 | 49,688 | 51,139 | 52,900 | ||||||||||
Investment income | 6,028 | 5,092 | 4,351 | 3,988 | ||||||||||
Social Benefit Payments[4] | (52,012) | (52,713) | (51,847) | (51,100) | ||||||||||
Other expenditure | (6,295) | (6,359) | (6,402) | (6,363) | ||||||||||
Transfer to Consolidated Fund – GP Visits[5] | (75) | (75) | (75) | (75) | ||||||||||
Closing Balance | 106,867 | 102,500 | 99,666 | 99,016 | ||||||||||
Table 44: Health Insurance Fund |
|
|
|
| ||||||||||
|
|
|
|
|
The actuarial review of the Healt
h Insurance Fu
nd was complet
ed in May (R.9
new financial projections show that the Fund will be exhausted during the late 2030s or early 2040s. However, with the additional cost of the changes set out below, it is likely that, without action, the Fund will now be exhausted during the mid-2030s.
In 2023, the current Social Security Minister took significant actions to provide extra support to islanders through the Fund. The Minister entered into contracts to reduce the cost of general practice services to islanders. Two separate contracts have been established to provide for:
• £20 reduction in individual's cost of GP surgery appointments - £6m per year
• Free access to surgery consultations for children under the age of 18 - £1m per year
In 2022, the previous Social Security Minister instigated an investment programme worth up to £9m in total to support the development of general practices over 2022 -2025.
In 2023, the current Social Security Minister entered contracts worth up to £12m in total to support the development of community pharmacies over the next three to four years.
As the central funding for Covid-19 costs comes to a close, the opportunity has been taken to review the organisation and delivery of a range of vaccination services, including an ongoing Covid-19 vaccination programme to targeted groups. Details of the new service will be finalised in coming months and the Health Insurance Law will be amended to allow these costs to be met from the Fund. Legislation to this end will be lodged to allow for debate immediately after the Government Plan debate, estimates of the additional costs are included in the forecast above.
The cost of the programme of investments in general practice and community pharmacy is shown over their respective lifetimes. As these programmes reach maturity the additional capacity within these services is likely to lead to further contracts. The cost of these further contracts is not shown in the table above.
The value of the Fund is expected to slightly decrease to £103m by 2027. This represents approximately 2 years' worth of expenditure.
The ageing demographic is increasing the cost of health services in the Island, including the costs met by the Fund. These pressures will continue to increase in coming years. Changes will be needed to pay for future healthcare costs in a sustainable way.
The Health and Social Services Minister's review of the Island's health and care costs will continue throughout 2023, with options for the future funding of our whole health and care system being brought to the Assembly in 2024. These options will include possible reform of the Health Insurance Fund but, in the meantime, the current role of the Health Insurance Fund in subsidising the cost of primary care services will be maintained.
Following amendments to the Government Plan, additional funding will be provided from the Health Insurance Fund to extend free GP visits to all full-time students, including students in full-time education undertaking Higher Education at Highlands College, Colleges, and Universities in the UK or abroad[7]. Additional funding of up to £1m per year will be allocated to support the provision of hosiery dressings and wound dressings to those with a clinical need. The new scheme will be set up as soon as practicable and will provide products at no cost to the end user.
Long-Term Care Fund
The Long-Term Care Fund provides universal and means-tested benefits to individuals with long-term care needs and is funded through a central grant from general revenues and income-related contributions from income taxpayers.
In line with a recommendation of the Comptroller & Auditor General (C&AG), Ministers have reviewed the basis for the Grant to the Long-Term Care (LTC) fund and are content that the current formula provides a simple and pragmatic approach, maintaining the value of the grant in real terms. No changes to the basis of the grant are proposed.
The actuarial review of the Long-Term Care Fund was completed in May (R.95/2023[8]). The Long-Term Care Fund has grown since the States Assembly increased the long-term care contribution rate by 0.5% in 2020. It is now in a significantly better position with a more positive outlook than at the time of the previous actuarial review.
The actuary's projections show the Fund balance growing and then decreasing gradually over the next 15 years as the number and proportion of older people with long term care needs is expected to increase. Then, the contribution rate would need to increase by 0.5% to 2%, or other equivalent changes made to the benefits that the Fund provides.
The current contribution rate of 1.5% is expected to enable the balance on the Long-Term Care Fund to continue to increase throughout the period of the Government Plan. This supports the operation of the Fund in the short term. However, to support the ongoing sustainability of the Fund and to take account of inter-generational issues, the Minister for Social Security will review the timing of the next increase in the LTC contribution rate during 2024. That review will also include a consideration of the level of the upper income limit included within the current system.
The transformation of health care services and the proposed introduction of the new Care Needs at Home Benefit are intended to reduce the number of individuals who will need a care home placement, through the provision of alternative care options and improved support at home and in the community. These actions should help to reduce the extent of future increases in Long-Term Care expenditure.
| Long-Term Care Fund |
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | |
£'000 |
| Estimate | Estimate | Estimate | Estimate | |
Opening Balance |
| 55,551 | 61,084 | 68,297 | 76,236 | |
Long-Term Care Contributions |
| 45,430 | 47,192 | 49,432 | 52,186 | |
States Grants to Long-Term Care Fund |
| 37,325 | 39,303 | 39,618 | 40,093 | |
Investment income |
| 3,943 | 3,927 | 3,906 | 4,077 | |
Social Benefit Payments |
| (79,608) | (81,638) | (83,428) | (85,251) | |
Other expenditure |
| (1,557) | (1,571) | (1,589) | (1,721) | |
Closing Balance Table 45: Long-Term Care Fund |
| 61,084 | 68,297 | 76,236 | 85,620 | |
|
|
|
| |||
|
|
|
|
|
| |
Social Security Fund |
|
|
|
|
| |
|
|
|
|
|
|
The Social Security Fund receives allocations from Social Security contributions from employers and working-age adults and an annual States Grant. The Fund supports the wellbeing of Islanders by providing old age pensions and a range of working age benefits.
The previous States Assembly agreed that no States grant would be paid into the Social Security Fund for 2020 to 2023 to offset the impact of Covid-19 on the public finances. Funds have been drawn from the Social Security Reserve Fund in these years to support the payment of pensions and contributory benefits.
The States grant to the Social Security Fund will be reinstated in full during the plan, but the reintroduction has been phased to allow for the additional pressures on public finances in the early years of the plan. For 2024 and 2025, the value of the States Grant will be reduced by £20m each year from the formula value. This will allow vital public services to be funded over these two years at a time when overall government finances remain constrained. The value of the Grant in 2027 would be increased by £40m when Government finances are forecast to be in a stronger position. The Grant would then return to formula in future years. In 2024 and 2025 additional transfers from the Reserve Fund may be needed to support ongoing benefit and pension costs. Legislation to adjust the value of the States Grant will be lodged for debate immediately after the Government Plan debate.
Ministers have also considered the principles used in determining the States Grant supplement funding via contributions and are content that no changes to the basis of the grant are needed.
The actuarial review of the Social Security Fund was completed in May (R.96/2023[9]). The financial projections have improved since the last review at the end of 2017. The review
assumed that the States Grant would be fully restored to its formula value from 2024 onwards.
On this assumption, it is expected that the Fund will be able to pay old age pensions and working age contributory benefits for at least 40 years under a range of population and investment scenarios. There is no need to make changes to improve the financial sustainability of the Fund over the next few years.
The impact of stopping the States grant from 2020 to 2023 was balanced by better-than- expected investment performance since 2018. The actuaries are also now expecting slower improvements in life expectancy, which improves the financial projections through slower increases in pension costs.
A major new IT project is ongoing to specify and implement a new, transformational benefits system, and it is planned that this project will complete in 2027. This represents a significant capital investment by the Fund which will provide a new digital platform to improve customer service and efficient management of social security benefits for many years to come.
Funds have been allocated for 2024 to support a non-statutory scheme, equivalent to the child personal care benefit, for children diagnosed with or recognised as having a life-limiting condition, a life-threatening condition, or a complex healthcare need. During 2024 the Government will undertake a review of the relevant legislation in order to extend this provision in legislation for future years.[1]
Social Security Fund
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate
Opening Balance 89,167 94,852 108,852 120,274 Social Security Contributions 250,926 260,863 268,480 275,622 Other income 1,632 1,410 1,217 1,106 Transfer from Social Security Reserve[2] - - - - Grant to Social Security Fund[3] 77,596 88,805 88,981 89,686 Social Benefit Payments and other expenditure (320,451) (334,665) (345,388) (356,512) Capital investment in New Benefits System (4,018) (2,413) (1,868) (1,063) Closing Balance 94,852 108,852 120,274 129,113
Table 46: Social Security Fund
Social Security (Reserve) Fund
Social Security (Reserve) Fund
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate
Opening Balance 2,046,577 2,156,012 2,270,277 2,390,712 Return on investments 109,435 114,265 120,435 129,098 Transfers[1] - - - - Closing Balance 2,156,012 2,270,277 2,390,712 2,519,810
Table 47: Social Security (Reserve) Fund
The Social Security (Reserve) Fund holds the balances built up in the Social Security Fund and is critical in managing the impact of an ageing population on future pension costs. A transfer of £89m was made from the Reserve Fund in 2023 to support the on-going payment of pensions and benefits. Additional transfers will be made to meet operational needs, with any funding in excess of these needs transferred back the reserve.
Further work is required to implement the FPP's recommendation to review the objective of the Social Security Fund in light of the actuarial review, and this will be considered in a future Government Plan.
Climate Emergency Fund
In 2022 the States Assembly agreed the Carbon Neutral Roadmap which outlines the Island's strategic approach and the policies intended to reduce our greenhouse gas emissions in line with the Paris Agreement on Climate Change. The Paris Agreement was extended to Jersey in 2022 and provides a scientifically endorsed, emissions reduction pathway to net zero emissions by 2050. It sets carbon reduction milestones in 2030 of 68% and 78% by 2035 compared to emissions in the 1990 baseline year.
The Climate Emergency Fund is the vehicle through which the funding for the policies in the roadmap will be met. The Fund was created with £5m transferred from the Consolidated Fund in 2020 and receives annual income from previously agreed increases in fuel duty.
It is accepted that this will be insufficient to fund all the necessary policies to achieve our carbon neutral targets and it is expected that further income streams will need to be added to the Fund. This plan includes a long-term financing strategy for the Carbon Neutral Roadmap.
Carbon Neutral Roadmap Long-Term Financing Strategy
The Long-Term Financing Strategy (LTFS) for the Carbon Neutral Roadmap (CNR) will set out how the Government expects to raise the money it needs to successfully achieve the net zero transition.
This plan sets out the principles under which detailed proposals for financing will be developed. These will be heavily reliant on the expected profile of expenditure, which will be influenced by both the need to deliver reductions in emissions in line with targets, and the capacity to deliver the activities necessary to meet these needs (e.g. supply chain capacity, available skills and infrastructure). A further piece of work to model a realistic expenditure profile will begin in 2023 and inform more detailed funding proposals in the next Government Plan.
Principles
- The LTFS will work fairly for all Islanders.
- Just transition: The LTFS must uphold Principle 5 of the Carbon Neutral Strategy[1]. It should not increase income inequality; lower income groups should not be disproportionately paying for the transition to net zero.
- Polluter pays: Where taxes or charges are unavoidable, the LTFS should aim to primarily work through a polluter pays principle, although taking care to ensure costs do not disproportionately affect lower income groups.
- Intergenerational equity: The LTFS should aim to minimise the burden to future generations and target financing to be fully paid in line with the CNR timeline to 2050. The timeline should ensure compliance with the CNR targets.
- The LTFS will target the best value approach for Islanders.
- Value for money: The LTFS's blend of funding streams will represent best value for money for Islanders. Including consideration of the timeliness of finance.
- Minimising costs funded through Taxation: The costs to be borne through government revenues will be minimised where possible and sensible by encouraging private investment, use of new income streams such as renewable energy, the use of guarantees and loans rather than grants, and use of available policy levers including regulation.
- Fast follower and international alignment: The LTFS will adopt a fast follower approach, leveraging financing approaches that are already working well elsewhere and evolving for the Jersey context as appropriate.
- The role for Jersey's sustainable finance industry: The LTFS should seek to leverage capital and expertise from Jersey's local finance industry where possible, in line with Jersey's ambition to be a leading sustainable IFC.
- The role of government funds in de-risking private investment: The LTFS should consider whether blended finance structures offer appropriate solutions for Jersey. If so, then it will be important government funding is prioritised for pump-
priming and de-risking private sector investment, and/or funding those policies that are not otherwise readily investable.
- Financing will be made available when it is needed.
a. Availability of finance should not be a constraint on CNR implementation: Money needs to be available at the right time to match deployment needs, to avoid delays to implementation. There are several other constraints on pace of implementation of the CNR, including infrastructure, supply chain and workforce skills. These need to be considered in the development of a realistic income and expenditure profile over time.
Ensuring that the burden of paying for the move to carbon neutrality doesn't fall on future generations means that it will be necessary to raise funding. Based on previous estimates of a c.£300m requirement, this would equate to approximately £10m a year over the next 30 years, some of which will be delivered by the existing revenue ring-fenced to the Climate Emergency Fund each year.
Further policy work will also take place in 2024 to establish a suitable set of polluter-pays measures that could deliver the additional funding required.
This will include investigation of the introduction of an appropriate carbon tax or charge relating to the operation of private aircraft[1].
Polluter pays measures are designed to encourage changes to behaviour, therefore any future decreases in revenues will need to be understood as part of the development of new measures. The impact of any measures on Islanders will also need to be carefully assessed and understood to ensure that the principle of a fair transition is upheld. Any new form of taxation will involve associated administrative and compliance costs, which must also be factored into the viability of introducing any tax.
If new revenue streams develop through initiatives linked to Carbon Neutrality (e.g. offshore wind projects), the States could choose to use these to fund or part fund the costs of the carbon neutral transition.
Climate Emergency Expenditure 2024-2027
The delivery and resources plan within the Roadmap apportions funds for all the policies focussed on reducing emissions from heating, transport, and other sources, together with enabling policies addressing the biodiversity crisis and protecting wildlife and habitats. Included in the resource plan is funding for the completion of multi-year early start projects that were awarded funding by the States Assembly in Government Plans between 2019 and 2021 prior to the agreement of the Carbon Neutral Roadmap (where possible these are being met from Departmental underspends or other in year funding)
| Climate Emergency Fund |
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | |
£'000 |
| Estimate | Estimate | Estimate | Estimate | |
Opening Balance |
| 8,194 | 4,113 | 537 | 537 | |
Transfer from Consolidated Fund (portion of fuel duty and VED) |
| 4,130 | 4,006 | 3,886 | 3,769 | |
Expenditure (as detailed in the Carbon Neutral Roadmap) |
| (8,211) | (7,582) | (3,886) | (3,769) | |
Closing Balance |
| 4,113 | 537 | 537 | 537 | |
Table 48: Climate Emergency Fund |
|
|
|
|
|
Technology Accelerator Fund
The Technology Accelerator Fund was created from a £20m transfer from the Consolidated Fund in 2022, funded by the receipt of an extraordinary dividend from JT in 2021 of £40m.
The Technology Accelerator Fund, through a delivery programme called Impact Jersey delivered on behalf of Government by Digital Jersey, will assist in solving the Island's strategic challenges through enhancing the digital economy, incubating, supporting and accelerating high value technological initiatives and closing known gaps in Jersey's innovation eco-system.
Working with Digital Jersey, a revised spend profile of this £20m fund has now been agreed enabling some monies to be transferred into the Consolidated Fund to fund investment in the Government Digital Services Platform.
A 3-year programme of £12.5m expenditure is now forecast with a review in 2026 to assess the next phase of the programme and arrange transfers back to the Technology Fund in future Government Plans to match when they are needed.
| Technology Accelerator Fund |
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | |
£'000 |
| Estimate | Estimate | Estimate | Estimate | |
Opening Balance |
| 18,819 | 12,475 | 7,021 | 1,449 | |
Programme expenditure |
| (4,150) | (4,165) | (4,185) | - | |
Transfer to Consolidated Fund |
| (2,194) | (1,289) | (1,387) | (1,387) | |
Closing Balance |
| 12,475 | 7,021 | 1,449 | 62 | |
Table 49: Technology Accelerator Fund |
|
|
|
|
|
Other Special Funds
There are several other special funds that operate for specific purposes. The funds included in this category are Jersey Currency Notes Fund, Jersey Coinage Fund, Housing Development Fund, Dormant Bank Accounts Fund, Dental Scheme Fund, Insurance Fund, Agricultural Loans Fund, Tourism Development Fund, CI Lottery (Jersey) Fund, Jersey Innovation Fund, Criminal Offences Confiscation Fund, Civil Asset Recovery Fund, Ecology Fund and Hospital Construction Fund.
These funds generally hold lower balances and are similarly established either under legislation or through bequests made to the Government. Income and expenditure are generally equal.
Following an amendment[1] to the Government Plan a transfer will be made to the Agricultural Loans Fund of up to £10m contingent on the availability of funding in the Consolidated Fund at the end of 2023 or 2024, for example through additional income or unspent approvals if available. As the transfer is contingent, figures are not included in the forecast for the Consolidated Fund or Other Special Funds.
| Other Special Funds |
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | |
£'000 |
| Estimate | Estimate | Estimate | Estimate | |
Opening Balance |
| 44,349 | 46,127 | 47,649 | 48,822 | |
Investment Income |
| 8,469 | 7,449 | 6,536 | 6,020 | |
Lottery and Other Income |
| 34,693 | 34,219 | 34,525 | 34,831 | |
Other Expenditure |
| (34,707) | (35,046) | (35,488) | (35,932) | |
Return to Consolidated Fund |
| (5,900) | (5,100) | (4,400) | (4,000) |
Transfers (777) - - -
Closing Balance 46,127 47,649 48,822 49,741 Table 50: Other Special Funds
Government of Jersey Group Forecast
The financial forecast for the Government of Jersey Group considers the income and expenditure through trading operations and special funds. An operating surplus is forecast throughout the plan period. Investment returns of the funds also form part of the accounting surplus, although the use of these returns is restricted.
| Summary Forecast Operating Balance - |
|
|
|
|
|
|
Government of Jersey | |||||||
£'000 |
|
| 2024 Forecast | 2025 Estimate | 2026 Estimate | 2027 Estimate | |
States Operating Surplus/(Deficit) |
|
| (28,133) | (13,266) | 20,159 | 45,168 | |
Trading Operations Net Income Special Funds Net Income/(Expenditure) |
|
| 3,999 (13,237) | 4,268 (3,681) | 4,454 (50) | 4,454 4,658 | |
Group Operating Surplus/(Deficit) |
|
| (37,371) | (12,679) | 24,563 | 54,280 | |
Special Funds - Investment Income |
|
| 168,797 | 173,975 | 180,882 | 191,168 | |
Group Surplus/(Deficit) |
|
| 131,426 | 161,296 | 205,445 | 245,448 |
Table 51: Summary Forecast Operating Balance - Government of Jersey
Financial Matters Under Development
Sustainability of Health Funding
There remains a growing gap in ongoing funding needed to maintain health and care services as our population ages and the costs of treatments and medicines increases. Monies are also required over the coming years to improve service quality, to help address health inequalities and to support the development of the preventative and support services that help people stay healthy. This Government Plan provides additional funding to address immediate pressures.
Government Plan 2023 – 2026 noted that the Minister for Health and Social Services would undertake a wide review of the Island's health and care cost, to inform options for future funding of our whole health and care system. Work on this has progressed in 2023 to compile and analyse data of the whole healthcare system, including funding of services provided by Government, the charitable sector, the primary care sector and out of pocket costs directly borne by Islands. This data set will be used to inform forecasting and scenario modelling over the long term (at least 20 years). Work will continue into 2024 to develop potential options for change which will focus on:
- Funding (who pays)
- Financing (how do we raise the money that is needed)
- Contracting (how do we engage our providers to deliver better value)
Those options will be brought to the Assembly in 2024. They include potential reform of the arrangements that underpin the Health Insurance Fund.
Skills Development Fund
Following the approval of the proposition skills development fund' (P.116/2022[1]) the Government will establish a "Skills Development Fund" that uses both the current budgets for this purpose, and contributions from philanthropists, 2(1)(e) applications and other sources towards training for individuals or businesses which target specific skills gaps.
To avoid any delay, in 2024 this will form part of the CYPES departmental Head of Expenditure, with relevant income applied only for this purpose. Any amounts not spent in any year will be presumed to be made available in the following financial year under the Minister for Treasury and Resources' powers in the Public Finances Law, and the CYPES department will establish suitable reporting to ensure that amounts are kept separate from other areas of operation to facilitate this.
If Ministers subsequently determine that a separate States Fund is appropriate for the administration of the fund then a proposition would be brought to the Assembly as required by the Public Finances Law, either as part of a future Government Plan or a separate proposition.
Longer-Term Planning
Long-term Financial Sustainability is a critical objective of government, and it is intended that further work is undertaken in 2024 to further improve financial forecasting over a longer time period, to help inform decision making. This will build on planned work in 2023 on a longer- term capital plan.
Forecasts over a range of periods will be developed:
• Short Term (4-5 years)
• Medium Term (5-10 years)
• Long-Term (10-25 years)
Medium and long-term plans will seek to estimate the impact of changes to population size, demographics and the economy over those longer timescales.
It is anticipated that the development of these models will be multi-year project, to eventually incorporate:
• General Revenue Income
• Departmental Expenditure
• Capital Expenditure
• Social Security Funds Income and Expenditure
• Spend to deliver the Carbon Neutral Roadmap
• Reserve Funds balances
• Borrowing
Existing work, including on the Sustainability of Health Funding will inform this more holistic model.
Long-term Sustainability of the Jersey Teachers Superannuation Fund (JTSF)
The Jersey Teachers Superannuation Fund Management Board have highlighted to Government that the contributions being paid into the JTSF to fund benefits are likely to be insufficient to pay for the future accrual of benefits for current and future teachers.
The Jersey Teachers Superannuation Scheme is in need of review and modernisation, as was undertaken for the public pensions for all other government and States employees. The repayment of the JTSF Pension Increase Debt in 2022 has supported the long-term sustainability of JTSF final salary pension scheme, but further action will be considered as part of the pay strategy, and any implications included in a future Government Plan.
Appendix 1: Key to Abbreviations
Department | |
CLS | Customer and Local Services |
CBO | Cabinet Office |
COO | Chief Operating Office |
CYPES | Children, Young People, Education and Skills |
ECON | Department for the Economy |
EDTSC | Economic Development, Tourism, Sport and Culture |
ENV | Environment |
ER | External Relations |
FS | Financial Services |
HCS | Health and Community Services |
INF | Infrastructure |
JHA | Justice and Home Affairs |
SoJP | States of Jersey Police |
OCE | Office of the Chief Executive |
SPPP | Strategic Policy, Planning and Performance |
T&E | Treasury and Exchequer |
NM | Non-Ministerial Departments |
BC | Bailiff 's Chambers |
C&AG | Comptroller and Auditor General |
JG | Judicial Greffe |
LOD | Law Officers' Department |
SG | States Greffe |
VD | Viscount's Department |
JOA | Jersey Overseas Aid |
PPC | Privileges and Procedures Committee |
SA | States Assembly |
PRO | Probation |
Glossary of Terms | |
AML | Anti Money Laundering |
ASW | Actively Seeking Work |
CFT | Combating the Financing of Terrorism |
COCF | Criminal Offences Confiscation Fund |
CPF | Counter-Proliferation Financing |
FBC | Full Business Case |
FPP | Fiscal Policy Panel |
GVA | Gross Value Added |
HVR | High Value Residents |
IFG | Income Forecasting Group |
IIR | Income Inclusion Rule |
IMF | International Monetary Fund |
JCM | Jersey Care Model |
JFSC | Jersey Financial Services Commission |
JTSF | Jersey Teachers Superannuation Fund Management |
LTFS | Long-Term Financing Strategy |
OECD | Organisation for Economic Development |
OBC | Outline Business Case |
PFL | Public Finances (Jersey) Law 2019 |
RPI | Retail Price Index |
SMP | Shoreline Management Plan |
SOC | Strategic Outline Case |
VED | Vehicle Emissions Duty |
VFM | Value for Money |
Appendix 2: Proposition and Summary Tables
On 14December 2023 the States Assembly approved the Government Plan 2024-2027 as amended.
The following amendments were approved by the States Assembly and are incorporated into the proposition below:
• Amendment 1 (Social security grant)
• Amendment 5 (Right-sizing scheme)
• Amendment 6 (as amended) (Medical hosiery & dressing funding)
• Amendment 12 (as amended) (Value for money savings)
• Amendment 13 (Violence against women and girl's taskforce)
• Amendment 15 (as amended) (Income support for children with life threatening conditions)
• Amendment 16 (Pension Changes)
• Amendment 18 (Free GP visits to full time students)
• Amendment 21 (Le Rocquier School and community sports facilities)
• Amendment 22 (as amended) (Abolitions of interest tax relief for landlords)
• Amendment 24 (Expanding early years nursery provisions for childcare support)
• Amendment 25 (as amended) (Freezing alcohol duty)
• Amendment 26 (Freezing fuel duty)
• Amendment 30 (as amended) (Freeze on Public Health staff appointments)
• Amendment 32 (Tax on private aircraft)
• Amendment 33 (as amended) (Agriculture & fisheries)
THE STATES are asked to decide whether they are of opinion to receive the Government Plan 2024 – 2027 specified in Article 9(1) of the Public Finances (Jersey) Law 2019 ("the Law") and specifically –
- to approve the estimate of total States income to be paid into the Consolidated Fund in 2024 as set out in Appendix 2 – Summary Table 1 to the Report, which is inclusive of the proposed taxation and impôts duties changes outlined in the Government Plan, in line with Article 9(2)(a) of the Law, except that –
- in Summary Table 1 there should be inserted a new line below "Corporate Income Tax" entitled "Interest Tax Relief (letting properties only)" with a figure of £1.9m to be placed in the column for the 2027 Estimate, to include funds generated from the abolition of interest tax relief on mortgages for letting properties, subject to the outcome of the Fiscal Policy Panel's review of Jersey's housing market which will be published in 2024, a full consultation process and consideration of the timing and cumulative impact upon Jersey's housing market[1]; and
- total estimate for 2024 Impôt Duties shall be decreased by £1,033,000 by reducing the Impôt Duties for Spirits, Wine, Cider and Beer, with the relevant figures in Appendix 2 – Summary Table 1 updated in line with the following table[1] –
| 2024 Estimate (£000) | 2025 Estimate (£000) | 2026 Estimate (£000) | 2027 Estimate (£000) |
Impot Duties Spirits | 7,655 | 8,171 | 8,327 | 8,522 |
Impot Duties Wine | 9,158 | 9,673 | 9,755 | 9,878 |
Impot Duties Cider | 1,036 | 1,083 | 1,081 | 1,083 |
Impot Duties Beer | 6,686 | 7,060 | 7,120 | 7,211 |
- total estimate for 2024 Impôt Duties shall be decreased by £2,700,000 by freezing the Impôt Duties for Fuel, with the relevant figures in Appendix 2 – Summary Table 1 updated in line with the following table, and subsequent figures updated accordingly[2] –
| 2024 Estimate (£000) | 2025 Estimate (£000) | 2026 Estimate (£000) | 2027 Estimate (£000) |
Impôt Duties Fuel | 24,689 | 25,857 | 25,797 | 25,850 |
- to refer to their Act dated 30th September 2016 and to approve the application of existing resources for work on the development of user pays' charges in relation to all aspects of waste, including commercial and domestic liquid and solid waste;
- to approve the proposed Changes to Approval for financing/borrowing for 2024, as shown in Appendix 2 – Summary Table 2 to the Report, which may be obtained by the Minister for Treasury and Resources, as and when required, in line with Article 9 (2)(c) of the Law, of up to those revised approvals;
- to approve the extension of the use of the existing Revolving Credit Facility to include the provision of funds that would otherwise be implemented through bank overdraft or bank overdraft facilities under Article 26 (1)(a) of the Law, should they be needed, subject to the limits outlined in that article.
- to approve the transfers from one States fund to another for 2024 of up to and including the amounts set in Appendix 2 – Summary Table 3 in line with Article 9(2)(b) of the Law, except that –
- in Summary Table 3, the transfers in the last two rows of the table shall be replaced as follows[1] –
|
| 2024 | 2025 | 2026 | 2027 |
£'000 |
| Proposed | Proposed | Proposed | Proposed |
Transfer from | Transfer to |
|
|
|
|
Strategic Reserve | Consolidated Fund | 20,000 | 20,000 | - | - |
Consolidated Fund | Strategic Reserve | - | - | - | 40,000 |
- a new line should be inserted in Summary Table 3 to include a transfer of £75,000 from the Health Insurance Fund to the Consolidated Fund to allocate funds to extend the Free GP visits for Children and Young People Scheme to all full-time students, including students in full-time education undertaking Higher Education at Highlands College, Colleges, and Universities in the UK or abroad[2];
- to approve a transfer from the Consolidated Fund to the Stabilisation Fund in 2024 of up to £25 million, subject to a decision of the Minister for Treasury and Resources based on the availability of funds in the Consolidated Fund as at 31st December 2023 in excess of the estimates provided in this plan, or from budgeted underspends identified before 31st December 2024[3];
- to approve a transfer from the Consolidated Fund to the Agricultural Loans Fund in 2024 of up to £10 million, subject to a decision of the Minister for Treasury and Resources based on availability of funds in the Consolidated Fund as at 31st December 2023 in excess of estimates provided in this plan, or from budgeted underspends identified before 31st December 2024;
- to approve each major project that is to be started or continued in 2024 and the total cost of each such project and any amendments to the proposed total cost of a major project under a previously approved Government Plan, in line with Article 9(2)(d), (e) and (f) of the Law and as set out in Appendix 2 – Summary Table 4 to the Report;
- to approve the proposed amount to be appropriated from the Consolidated Fund for 2024, for each Head of Expenditure, being gross expenditure less estimated income (if any), in line with Articles 9(2)(g), 10(1) and 10(2) of the Law, and set out in Appendix 2
– Summary Tables 5(i) and (ii) of the Report, except that –
(i) the Head of Expenditure for Economic Development, Tourism, Sport and Culture should be increased by £2,000,000, with decreases to the following Heads of Expenditure[1] –
- Cabinet Office £1,000,000;
- Customer and Local Services £22,000;
- Children, Young People, Education and Skills £286,000;
- Infrastructure £74,000;
- Environment £18,000;
- Health and Community Services £415,000;
- Justice and Home Affairs £60,000; (viii) States of Jersey Police £47,000;
- Financial Services £13,000;
- Ministry of External Relations £5,000; and
- Treasury and Exchequer £60,000;
- to accommodate a drop in States income caused by freezing the Impôt Duties for Fuel[2] –
- the Head of Expenditure for the Central Reserve shall be reduced by £1,350,000;
- the Head of Expenditure for the Cabinet Office shall be reduced by £932,000; and
- the Head of Expenditure for the Economic Development, Tourism, Sport & Culture shall be reduced by £418,000; and
- in Summary Table 5(i) the Head of Expenditure for Customer and Local Services should be increased by £600,000 to enable a non-statutory scheme to be set up to provide financial support to eligible families that include a child with a life-limiting condition, a life-threatening condition, or a complex healthcare need with a decrease of £600,000 to the Central Reserve Head of Expenditure[3]";
- in Summary Table 5(i) the Head of Expenditure for Health and Community Services should be increased by £75,000 to allocate funds to extend the Free GP visits for Children and Young People Scheme to all full-time students, including students in full-time education undertaking Higher Education at Highlands College, Colleges, and Universities in the UK or abroad[4];
- in Summary Table 5(i) the figures in the columns Expenditure and Head of Expenditure for Treasury and Exchequer shall each be increased by £20 million in 2024, so as to reinstate the States grant to the Social Security Fund in full[5];
- to accommodate a drop in States income caused by reducing the Impôt Duties for Spirits, Wine, Cider and Beer[1] –
(a) the Head of Expenditure for the Central Reserve shall be reduced by £1,033,000;
- to approve the estimated income, being estimated gross income less expenditure, that each States trading operation will pay into its trading fund in 2024 in line with Article 9(2)(h) of the Law and set out in Appendix 2 – Summary Table 6 to the Report;
- to approve the proposed amount to be appropriated from each States trading operation's trading fund for 2024 for each head of expenditure in line with Article 9(2)(i) of the Law and set out in Appendix 2 – Summary Table 7 to the Report;
- to approve the estimated income and expenditure proposals for the Climate Emergency Fund for 2024 as set out in Appendix 2 – Summary Table 8 to the Report;
- to agree that the Government of Jersey should publish a broader review of alcohol policy and consider what additional support could be provided for the hospitality sector and the Island's small spirits producers[2];
- to commit to the annual publication of a report, in alignment with the Building a Safer Community Framework, to provide updates on the progress made in implementing the recommendations of the Report of the Taskforce on Violence Against Women and Girls and the impact they have had on preventing violence against women and girls and improving gender equality in Jersey, and include the publication of a timeline of the Government of Jersey's work programme on these areas for the following year[3];";
- to agree that the annual report specified in paragraph (n) must identify how measures outlined in the relevant Government Plan apply to improving gender equality in Jersey, with a focus on establishing an intersectional approach to all future strategies and other work by the Government of Jersey to address Violence Against Women and Girls, as outlined in Recommendation 2 of the report by the Taskforce on Violence Against Women and Girls[4];";
- to approve, in accordance with Article 9(1) of the Law, the Government Plan 2024-2027, as set out at Appendix 3 to the Report, except that –
- in the section "Improving access to housing" on page 9 there should be inserted a fifth bullet point with the words "We will develop a scheme to encourage and incentivise right-sizing, to be presented to the States Assembly before 31st May
2024, with the financial implications forming part of the Government Plan 2025- 2028[1];
- on Page 10, after the words "£3m on an ongoing basis." there should be inserted the following, "The funding provided for the public health function is predicated upon a freeze on any recruitment within the service, excluding legally required positions, whether due to increases in staff numbers or fulfilment of vacancies, until a full business case for the public health function has been produced, scrutinised, and approved by the States Employment Board[2].";
- on Page 10, after the words "especially our most vulnerable, can thrive." should be inserted a new bullet point[3] –
• "We will review feasibility options for expanding Early Years nursery provision and childcare support to benefit all children in Jersey from nine months to three years old, with a report detailing any action plan from the Government to be presented to the States Assembly before 1st September 2024, and any financial implications forming part of the Government Plan 2025-2028.";
- on page 57 after Table 16, there should be inserted the following new paragraph[4] –
"In accordance with the recommendations of the Corporate Services Scrutiny Panel, as set out in S.R.20/2022 a report published alongside the annual report and accounts will –
- include a report on all Value for Money savings which were made during the duration of the previous Government Plan; and
- identify and provide full details of the monitoring process that has been undertaken on the Value for Money programme during the duration of the previous Government Plan."
- on Page 66, after the words "urgency and readiness of projects in year." there should be inserted the following new paragraph[5] –
"The funding of at least of £4.705 million (approved in the Government Plan 2020- 2023 and Government Plan 2021-2024) for the Le Rocquier School and Community
Sports Facilities will be reviewed with the intent that the project is reprioritised, in order to improve access to sports facilities in the East of the Island.";
- under the sub-heading "Health Insurance Fund" on page 87 there should be inserted the words "Additional funding of up to £1 million per year will be allocated to support the provision of hosiery dressings and wound dressings to those with a clinical need. The new scheme will be set up as soon as practicable and will provide products at no cost to the end user." and Table 44 on page 87 updated accordingly, to reflect the increased expenditure forecast[1].";
- on page 90 after the words "benefits for many years to come." there should be inserted a new paragraph as follows[2] –
"Funds have been allocated for 2024 to enable a non-statutory scheme to be set up to provide financial support to eligible families that include a child with a life-limiting condition, a life-threatening condition, or a complex healthcare need. During 2024 the Government will bring forward legislation in provide for a permanent scheme for future years;
(viii) on Page 93, after the words "that could deliver the additional funding required.",
there should be inserted the following words[3] –
"This will include investigation of the introduction of an appropriate carbon tax or charge relating to the operation of private aircraft."; and
(ix) on page 112, under the subheading New Rules for Pensions the words "£10,000" should be substituted with "£15,000[4]".
COUNCIL OF MINISTERS
| Summary Table 1 - States Income |
|
|
|
|
|
|
| 2024 | 2025 | 2026 | 2027 | |
£'000 |
| Estimate | Estimate | Estimate | Estimate | |
Income Taxes |
|
|
|
|
| |
- Personal Income Tax |
| 710,386 | 736,386 | 770,386 | 812,386 | |
- Corporate Income Tax |
| 159,900 | 174,900 | 172,900 | 171,900 | |
- Interest Tax Relief (Letting Properties Only) |
| - | - | - | 1,900 | |
|
| 870,286 | 911,286 | 943,286 | 986,186 | |
Goods and Services Tax (GST) |
|
|
|
|
| |
- Goods and Services Tax |
| 108,300 | 111,300 | 114,300 | 118,300 | |
- International Service Entities Fees |
| 12,700 | 12,700 | 12,700 | 12,700 | |
|
| 121,000 | 124,000 | 127,000 | 131,000 | |
Impôt Duties |
|
|
|
|
| |
- Spirits |
| 7,655 | 8,171 | 8,327 | 8,522 | |
- Wine |
| 9,158 | 9,673 | 9,755 | 9,878 | |
- Cider |
| 1,036 | 1,083 | 1,081 | 1,083 | |
- Beer |
| 6,686 | 7,060 | 7,120 | 7,211 | |
- Tobacco |
| 16,007 | 16,424 | 16,168 | 15,975 | |
- Fuel |
| 24,689 | 25,857 | 25,797 | 25,850 | |
- Goods (Customs) |
| 1,000 | 1,000 | 1,000 | 1,000 | |
- Vehicle Emissions Duty (VED) |
| 3,727 | 3,667 | 3,703 | 3,530 | |
|
| 69,958 | 72,935 | 72,951 | 73,049 | |
Stamp Duty and Land Transaction Tax |
|
|
|
|
| |
- Stamp Duty |
| 32,336 | 37,070 | 45,082 | 47,084 | |
- Land Transaction Tax (LTT) |
| 3,720 | 4,836 | 6,724 | 7,196 | |
- Probate |
| 2,700 | 2,700 | 2,700 | 2,700 | |
- Enveloped Property Transaction Tax |
| 1,000 | 1,000 | 1,000 | 1,000 | |
|
| 39,756 | 45,606 | 55,506 | 57,980 | |
Other Income |
|
|
|
|
| |
- Parish Rates |
| 17,300 | 17,439 | 17,648 | 18,071 | |
- Dividend Income |
| 22,231 | 22,517 | 13,976 | 11,379 | |
- Income from Andium Homes and Housing Trusts |
| 29,715 | 30,252 | 30,476 | 30,546 | |
- Other Non-dividend Income |
| 20,343 | 19,561 | 18,797 | 18,806 | |
|
| 89,589 | 89,769 | 80,897 | 78,802 | |
Total States Income |
| 1,190,589 | 1,243,596 | 1,279,640 | 1,327,017 |
| Summary Table 2 - Borrowing for 2024 |
|
|
|
|
|
|
|
£'000 |
| 2023 Approved | Change to Approved | 2024 Approval | 2025 Proposed | 2026 Proposed | 2027 Proposed | |
Refinancing of past-service liabilities Housing bond |
| 477,000 250,000 | - - | 477,000 250,000 | 477,000 250,000 | 477,000 250,000 | 477,000 250,000 |
Borrowing (before healthcare facilities) 727,000 - 727,000 727,000 727,000 727,000 Healthcare facilities 90,071 52,000 142,071 142,071 142,071 142,071 Borrowing 817,071 52,000 869,071 869,071 869,071 869,071
Table 3 – Transfer of monies between States Funds
£'000 2024 2025 2026 2027 Transfer from Transfer to Proposed Proposed Proposed Proposed Technology Accelerator Fund Consolidated Fund 2,194 1,289 1,387 1,387 Consolidated Fund Climate Emergency Fund 4,130 4,006 3,886 3,769 Strategic Reserve Consolidated Fund (Capital 336 - - -
repayment)
Strategic Reserve Consolidated Fund (Capital costs) 52,000 - - -
Consolidated Fund (Financing
Strategic Reserve costs) 7,820 8,074 6,494 5,830 Criminal Offences Confiscation Fund Consolidated Fund 777 - - -
Strategic Reserve (pension
Consolidated Fund 2,167 2,580 3,002 3,436
refinancing)
Health Insurance Fund Consolidated Fund (75) (75) (75) (75) Consolidated Fund Social Security Fund - - - 40,000 Social Security Fund Consolidated Fund 20,000 20,000 - -
Table 4 - Major Projects |
|
|
|
|
|
£'000 | Spon Dept | Supp Dept | Previous Total | Total Project Approval | Change |
Jersey Opera House ECON I&E 11,731 11,731 - Cyber Programme 2.0 CBO CBO - 10,621 10,621 Digital Services Platform CBO CBO - 6,257 6,257 Le Squez CYPES I&E - 7,500 7,500 Mont à L'Abbé Secondary CYPES I&E - 23,000 23,000 Learning Difficulties - Specialist Accommodation HCS HCS 9,350 9,350 - Digital Care Strategy HCS CBO 16,185 16,185 - Sewage Treatment Works I&E I&E 88,635 88,635 - Liquid Waste Key Infrastructure I&E I&E - 15,644 15,644 Oakfield and Fort Regent Decant I&E I&E 9,402 9,402 - Office Modernisation I&E I&E 3,923 3,923 - Ambulance, Fire and Rescue Headquarters JHA I&E 24,403 24,403 - Revenue Transformation Programme (Phase 3) T&E T&E 9,425 9,425 - Revenue Transformation Programme (Phase 4) T&E T&E - 11,274 11,274 Major Projects (before healthcare facilities) 173,054 247,350 74,296 Healthcare facilities HCS HCS 60,360 112,360 52,000 Major Projects (after healthcare facilities) 233,414 359,710 126,296
| Table 5i - Revenue Heads of Expenditure |
|
|
|
|
|
2024 £'000 |
|
| Income | Expenditure | Head of Expenditure | |
Departmental Expenditure Cabinet Office Children, Young People, Education and Skills Customer and Local Services Infrastructure Environment Health and Community Services Jersey Overseas Aid |
|
| (5,120) (22,945) (11,774) (24,643) (6,351) (23,792) - | 82,388 229,412 118,601 81,808 17,250 310,027 20,041 | 77,268 206,467 106,827 57,165 10,899 286,235 20,041 |
Justice and Home Affairs (4,531) 44,600 40,069
States of Jersey Police (162) 27,497 27,335
Ministry of External Relations (330) 3,707 3,377
Economic Development, Tourism, Sport & Culture - 37,119 37,119
Financial Services - 11,215 11,215
Treasury and Exchequer (4,189) 163,777 159,588
Past Service Pension Liability Refinancing (174) 13,964 13,790 Departmental Expenditure (104,011) 1,161,406 1,057,395 Non-Ministerial and Other States Bodies
Bailiff 's Chambers (68) 3,276 3,208
Comptroller and Auditor General (97) 1,249 1,152
Judicial Greffe (2,094) 10,953 8,859
Law Officers' Department (127) 13,008 12,881
Office of the Lieutenant Governor (132) 1,037 905
Official Analyst (53) 788 735
Probation (78) 3,029 2,951
States Assembly - 9,904 9,904
Viscount's Department (882) 3,295 2,413 Non-Ministerial and Other States Bodies Expenditure (3,531) 46,539 43,008
Covid-19 Response - - - Departmental and Non-Ministerial Expenditure (107,542) 1,207,945 1,100,403 Reserves
Central Reserve - 62,188 62,188 Reserve Expenditure - 62,188 62,188 Our Hospital - Financing Costs - 7,820 7,820 Revenue Heads of Expenditure Total (107,542) 1,277,953 1,170,411
Summary Table 5ii – Capital and Other Projects Heads of Expenditure |
|
|
|
|
£'000 | Major Project | Spon Dept | Supp Dept | 2024 Estimate |
Feasibility 1,706
Estates
Crematorium CLS CLS - Mont à L'Abbé Secondary M CYPES I&E 1,000 Le Squez M CYPES I&E 3,500 New School and Educational Developments CYPES I&E - Upgrades to CYPES Estates CYPES CYPES 10,721 Jersey Opera House M ECON I&E 5,522 Elizabeth Castle ECON ECON 1,088 Learning Difficulties - Specialist Accommodation M HCS HCS 4,037 Health Services Improvements Programme HCS HCS 5,000 Oakfield and Fort Regent Decant M I&E I&E 2,500 Office Modernisation M I&E I&E 2,361 Major Refurbishment and Upgrades I&E I&E 2,500 Property Dilapidations I&E I&E - Land Acquisition I&E I&E - Markets Revitalisation Project I&E I&E - Other I&E Estate Projects I&E I&E 2,050 Ambulance, Fire & Rescue Headquarters M JHA JHA 750 Army and Sea Cadets Headquarters JHA JHA - Dewberry House - Sexual Assault Referral Centre SoJP SoJP 3,315 Prison Improvement Works JHA I&E 1,384
Estates 45,728 Infrastructure
Infrastructure Rolling Vote and Public Realm I&E I&E 18,950 Sewage Treatment Works M I&E I&E 2,733 Liquid Waste Key Infrastructure M I&E I&E 5,171 Shoreline Management Plan - Havre Des Pas I&E I&E - Springfield Pitch & Floodlights I&E I&E - Planning Obligation Agreements I&E I&E - Road Safety I&E I&E - Countryside Access and Signage I&E I&E - Other Infrastructure I&E I&E 3,190
Infrastructure 30,044 Information Technology
Cyber Programme 2.0 M CBO CBO 1,096 Digital Services Platform M CBO CBO 2,194 Other Government Wide IT Projects CBO CBO 1,277 Digital Care Strategy M HCS CBO 5,305 Jersey Care Model - Digital Systems HCS CBO 1,000 Next Passport Project JHA JHA - Regulation Improvement to Digital Assets I&E I&E 1,065 Revenue Transformation Programme (Phase 3) M T&E T&E 1,986 Revenue Transformation Programme (Phase 4) M T&E T&E 3,230 Court Digitisation JG JG 1,700
Summary Table 5ii – Capital and Other Projects Heads of Expenditure (continued)
Major Spon Supp 2024 £'000 Project Dept Dept Estimate
Replacement LC-MS system OA OA - Probation/Prison Offender Case Management system PRO PRO 500 Automatic Electoral Registration SA CBO 809 Information Technology 20,162 Replacement Assets and Minor Capital
Replacement Assets and Minor Capital - CBO CBO CBO 2,500 Replacement Assets and Minor Capital - CYPES CYPES CYPES 250 Replacement Assets and Minor Capital - HCS HCS HCS 2,000 Replacement Assets and Minor Capital - I&E I&E I&E 5,350 Fisheries Protection Vessel & Auxiliary Vessels I&E I&E - Replacement Assets and Minor Capital - JHA JHA JHA 380 Replacement Assets and Minor Capital - SoJP SoJP SoJP 200 Replacement Assets and Minor Capital 10,680
Major Incident Recovery CAB IHE - Reserve for Central Risk and Inflation 5,000
Total Capital and Projects Heads of Expenditure (before Healthcare 113,320 Facilities)
Healthcare Facilities M HCS HCS 52,000 Total Capital and Projects Heads of Expenditure (after Healthcare 165,320
Facilities)
| Summary Table 6 - Trading Operations Revenue Heads of Expenditur | e |
|
|
|
|
|
|
|
|
|
|
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
| Estimated |
£'000 Income Expenditure Net Income Jersey Car Parking 8,335 (6,565) 1,770
Jersey Fleet Management 5,557 (3,328) 2,229 13,892 (9,893) 3,999
| Summary Table 7 - Trading Operations Capital Heads of Expendit | ure 2024 |
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||||
|
|
|
|
|
|
| Estimated | |||||||||||||||||||||||
£'000 |
|
|
|
|
|
| Expenditure | |||||||||||||||||||||||
Jersey Car Parking - Car Park Enhancement and Refurbishment Jersey Fleet Management - Vehicle and Plant Replacement |
|
|
|
|
|
|
| - 2,000 | ||||||||||||||||||||||
|
|
|
|
|
|
|
| 2,000 | ||||||||||||||||||||||
|
|
|
|
|
|
|
|
| ||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||||||||
| Summary Table 8 - Climate Emergency Fund |
|
|
|
|
|
|
|
|
|
|
| ||||||||||||||||||
£'000 |
|
|
|
|
|
|
| 2024 Estimate | ||||||||||||||||||||||
Opening Balance |
|
|
|
|
|
|
| 8,194 | ||||||||||||||||||||||
Transfer from the Consolidated Fund Expenditure |
|
|
|
|
|
|
| 4,130 (8,211) | ||||||||||||||||||||||
Closing Balance |
|
|
|
|
|
|
| 4,113 | ||||||||||||||||||||||
Appendix 3: Supplementary Financial Tables
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Head of Expenditure Reference Description Estimate Estimate Estimate Estimate Cabinet Office I-SPP-GP24-001 Statistics Jersey – Administrative data linkage team 393 436 436 436
I-SPP-GP24-002 Health Board 206 206 206 206
I-SPP-GP24-003 Continuation of Strategic Health Policy and Governance Team 387 387 387 387
I-SPP-GP24-004 Maintaining the Public Health and Health Protection Function 2,273 2,273 2,273 2,273
I-SPP-GP24-005 Major Incident Health and Wellbeing Recovery Programme 899 713 401 401
I-SPP-GP24-006 Strategic Housing and Regeneration Team 138 85 85 85
I-SPP-GP24-007 Vaccine Scheme 400 400 400 400 Cabinet Office Total 4,696 4,500 4,188 4,188 CYPES I-CYP-GP24-001 Children's Social Care Reform - New Homes 1,700 1,700 1,700 1,700
I-CYP-GP24-002 Investment across CYPES frontline services 2,615 2,607 2,599 2,591
I-CYP-GP24-003 Investment in young people workforce participation 385 393 401 409 CYPES Total 4,700 4,700 4,700 4,700 Customer & Local Service I-CLS-GP24-001 Community Compass 380 377 380 383
I-CLS-GP24-002 Housing Advice Service 162 215 215 215
I-CLS-GP24-003 Jersey Pension Saver Scheme 500 - - -
I-CLS-GP24-004 Social Benefits Payment for Children with Life Changing Conditions[1] 600 600 600 600 Customer & Local Service Total 1,642 1,192 1,195 1,198 Infrastructure I-IHE-GP24-001 Ambulance Station HQ Maintenance 423 679 247 84
I-IHE-GP24-002 Fort Regent 1,093 1,142 500 500 Infrastructure Total 1,516 1,821 747 584 Environment I-IHE-GP24-003 Natural Environment Team 300 300 300 300 Environment Total 300 300 300 300 Health & Community Services I-HCS-GP24-001 Ongoing Risks and Pressures in HCS 21,000 14,500 14,500 14,500
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Head of Expenditure Reference Description Estimate Estimate Estimate Estimate I-HCS-GP24-002 Free GP Visits for Full Time Students[1] 75 75 75 75
Health & Community Services Total 21,075 14,575 14,575 14,575 Justice& Home Affairs I-JHA-GP24-001 Fire and Rescue Service Pay, Terms and Conditions Review 1,429 1,429 1,429 1,429 I-JHA-GP24-002 Ambulance Service - Outcome of Demand and Capacity Review 202 482 503 526 I-JHA-GP24-003 Data Management and Analyst 110 100 93 86 I-JHA-GP24-004 Fire and Rescue Service Operations 145 85 80 74
I-JHA-GP24-005 Defence Funding 108 88 123 157 Justice& Home Affairs Total 1,994 2,184 2,228 2,272 States of Jy Police I-POL-GP24-001 Digital Forensics Unit 237 327 304 283 States of Jy Police Total 237 327 304 283 Min of Ext Relations I-MER-GP24-001 Overseas Offices 134 134 134 134 Min of Ext Relations Total 134 134 134 134 EcDv,Tourism,Sprt&Cul I-DFE-GP24-001 Implementation of Digital, Visitor Economy and Elite Sport Strategies 650 650 650 650 I-DFE-GP24-002 Rural and Marine Economy 1,150 1,150 1,150 1,150
I-DFE-GP24-003 Jersey Business - Core Grant Funding 150 150 150 150 I-DFE-GP24-004 Intellectual Property Framework 300 300 300 300
I-DFE-GP24-007 New Growth for Agriculture and Fisheries[2] 3,000 3,000 3,000 3,000 EcDv,Tourism,Sprt&Cul Total 5,250 5,250 5,250 5,250 Financial Services I-DFE-GP24-005 Financial Intelligence Unit (FIU) 746 755 710 685 I-DFE-GP24-006 Jersey Finance - Additional Grant Funding 750 750 750 750
Financial Services Total 1,496 1,505 1,460 1,435 Treasury & Exchequer I-T&E-GP24-001 Insurance Premiums 4,300 4,300 4,300 4,300 I-T&E-GP24-002 Tax Compliance and Customer Service 1,676 2,176 2,176 2,176
Treasury & Exchequer Total 5,976 6,476 6,476 6,476 Comptroller&Auditor I-C&AG-GP24-001 C&AG Recruitment Costs 30 40 - 28 Comptroller&Auditor Total 30 40 - 28 Judicial Greffe I-JG-GP24-001 JG Staff 194 188 188 188 Judicial Greffe Total 194 188 188 188 Law Officers' Dept I-LOD-GP24-001 LOD - Civil Division 205 205 205 205 I-LOD-GP24-002 LOD Criminal Courts Team 77 92 92 92
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Head of Expenditure Reference Description Estimate Estimate Estimate Estimate
I-LOD-GP24-003 LOD - Moneyval 620 666 666 666 Law Officers' Dept Total 902 963 963 963 Official Analyst I-OAN-GP24-001 Replacement HPLC analyser - - - 50 Official Analyst Total - - - 50 Probation I-PRO-GP24-001 Independent (HMIP) inspection of the Jersey Probation Service 68 - - - Probation Total 68 - - - States Assembly I-STA-GP24-001 Secretariat support capacity 292 292 292 292 I-STA-GP24-002 Legislative Drafting Office 180 172 172 172 I-STA-GP24-003 States Members' Constituency Work 344 344 344 344 I-STA-GP24-004 Creative Content Producer 26 26 26 26
States Assembly Total 842 834 834 834 Viscount's Department I-VID-GP24-001 Additional Staff Resource and Refurbishment 125 55 55 55 Viscount's Department Total 125 55 55 55 Grand Total 51,177 45,044 43,597 43,513
Table 52: Revenue Expenditure Growth
Appendix 4: Administrative Tax Measures
Additional administrative and technical measures to be included in the Finance Law (debated alongside the Government Plan)
Use of the contract price in calculating Stamp Duty/LTT in respect of off-plan purchases
The Ministerial Direction that relates to off-plan property purchases, which sets out the circumstances in which the Comptroller or Judicial Greffier may use the contract price to calculate the Stamp Duty/Land Transaction Tax due, is put into law.
New rules for pensions
When a person reaches the age of 60, some pension schemes allow the full amount of the pension fund to be commuted if it is below a certain value – currently £35,000. It is proposed that the maximum trivial commutation' value is increased to £50,000.
Some pension schemes allow the pension holder, at any age, to commute the whole fund if it is below a certain value. The Minister is proposing to reduce the so-called small pot pensions' rule from £19,000 to £15,000[1]. This is designed to prevent pension holders from using their pension fund as a savings scheme. Individuals will no longer be able to commute any fund into which an employer contributes if they are still employed by that employer. The total small pots limit of £50,000 across a lifetime will also be removed.
Appeal Provisions
Following recommendations by the Tax Tribunal Working Group, a new statutory process is proposed to allow taxpayers and Revenue Jersey to settle income tax appeals by agreement. Once the agreement proposed by the taxpayer is accepted by the Comptroller, there is a 40-day cooling off' period after which there is no further right of appeal.
Amendments are also made to allow taxpayers to appeal directly to the Commissioners of Appeal whereby more than 90 days have elapsed following a notice of appeal having been given to the Comptroller.
Codifying the Remittance Basis of Taxation
Proposed amendments to the Income Tax (Jersey) Law 1961 will codify practices around the remittance basis' of taxation. The legislation will clarify that Case V income arising from possessions out of Jersey does not include income from salaries, fees, wages, perquisites, benefits, or profits or gains arising from an office or employment exercised in Jersey (which is Case II). The measure is expected to bring in an additional £100,000 in revenue annually.
Information Sharing
Changes are proposed to the Revenue Administration Law to ensure that tax information can be disclosed by the Comptroller in appropriate circumstances, in particular to public bodies that are funded by, but outside of Government, including the Fiscal Policy Panel.
General Partners in a Partnership
A clarification is made to state that a partner who is both a general and limited partner in the same partnership must be treated as a general partner for the purpose of appointing a responsible partner. This amendment reflects the recent changes to the Limited Partnership (Jersey) Law 1994 that allowed for limited partnerships to be a general partner of a limited partnership.
GST Place of Supply Rules
Amendments are proposed to the GST Law to ensure that supplies made to businesses in Jersey by overseas retailers should be ignored for the purpose of calculating whether a business has reached the turnover threshold to register for GST.
Election for Independent Taxation
In the event that the States Assembly is unable to agree to the wider suite of changes to introduce independent taxation before 30 November 2023, the Draft Finance Law for 2024 will make provision to allow either spouse in a couple to elect unilaterally to be taxed independently. This change is made to ensure that Independent Taxation is available to anyone who wants to access it. The change takes effect for the year of assessment 2025 and future years.
An equivalent change is made in respect of civil partners.
Group Registrations for GST
For GST purposes, groups registration is not possible for groups that contain online retailers based outside of Jersey and other entities with a business establishment in Jersey. A change is proposed to enable this.
Proposed Changes to Filing Deadlines
• The tax return filing deadline for LLCs to be aligned with that for partnerships and companies (30 November).
• The annual filing deadline for employers to file benefit-in-kind returns to be aligned with the deadline for filing December's Combined Employer Return (15 January).
• The deadline to register with the Comptroller as an employer under the Income Tax Law to be aligned with the deadline to do so under the relevant Social Security Contributions Order (7 days).
Other Proposed Technical Amendments
• Article 80 of the Income Tax Law to be extended to ensure that a distribution that represents a repayment of principal advanced to the company by a member is not chargeable to tax. The money advanced to the company must have been made on a commercial basis to qualify for the exemption.
• Article 51 of the Income Tax Law to be amended to ensure that land transactions which arise in any circumstance other than as part of a property development trade are not subject to income tax.
• The definition of relevant earnings' in the Income Tax Law – with regard to the maximum annual deduction to income from pension contributions – to be extended to include trading income from property development.
• An exemption to income tax to be added for any income arising in the Jersey Bank Resolution Fund.
• The exemption from income tax for certain friendly societies to be removed as it is no longer required.
• An amendment to be made to the Customs and Excise Law to ensure that the most appropriate figure is used to calculate VED for hybrid vehicles.
• An article in the Stamp Duty Law relating to Jersey Homebuy contracts to be deleted because it is no longer required.
Editorial updates
• An amendment is proposed to Schedule 1 of the Enveloped Property Transactions Tax Law to correct a typographical error.
CBP001149
Designed and produced by the Government of Jersey Communications Team
14 DEC 2023
Annex - Government Plan 2024 -2027
GP
Government
Programme
P.72/2023 as amended and approved by the 2024-27 States Assembly on 14 December 2023
Introduction
The Government Plan Financial Annex contains supporting information for the Government Plan 2024-2027.
The Annex is divided into the following parts:
• Part 1 - Supplementary financial tables
• Part 2 - Departmental financial information
Government Plan 2024-2027 (p.72/2023) as amended
On 14 December 2023 the States Assembly approved the Government Plan 2024-2027 as amended.
This document sets out:
• The final Government Plan Annex as amended by all amendments agreed by the States Assembly, together with any necessary consequential and minor factual corrections.
GOVERNMENT PLAN 2024 – 2027 ANNEX
Contents
PART 1 SUPPLEMENTARY TABLES 3 Table 1 - Consolidated Statement of Comprehensive Net Revenue Expenditure 4 Table 2 – Changes to Net Revenue Expenditure 5 Table 3 - Service Transfers 9 Table 4 – Ministerial Mapping 10 Table 5 – Arts, Heritage, and Culture Revenue Expenditure 11 PART 2 DEPARTMENTAL FINANCIAL INFORMATION 12 Cabinet Office 13 Children, Young People, Education and Skills 19 Customer and Local Services 24 Infrastructure 27 Environment 31 Health and Community Services 34 Jersey Overseas Aid 37 Justice and Home Affairs 39 States of Jersey Police 44 Ministry of External Relations 47 Economic Development, Tourism, Sport and Culture 50 Financial Services 55 Treasury and Exchequer 58 Non-Ministerial Departments 62 States Assembly 69 Appendix 1: Government Plan Amendments 74
GOVERNMENT PLAN 2024 – 2027 ANNEX
PART 1 SUPPLEMENTARY TABLES
Table 1 - Consolidated Statement of Comprehensive Net Revenue Expenditure
Consolidated Statement of Comprehensive Net Revenue Expenditure
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey 392 392 392 392 Earned through operations 107,150 107,067 107,716 107,716 Total revenue 107,542 107,459 108,108 108,108 Expenditure
Social benefit payments 224,536 240,094 243,191 245,822 Staff costs 621,024 618,294 619,310 619,129 Other operating expenses 272,625 271,526 274,800 280,512 Grants and subsidies payments 73,218 74,203 74,631 75,198 Impairments 31 31 31 31 Finance costs 16,511 16,549 16,587 16,587 Total expenditure 1,207,945 1,220,697 1,228,550 1,237,279 Net revenue expenditure (near cash) 1,100,403 1,113,238 1,120,442 1,129,171 Reserves 62,188 96,164 101,595 115,234 Value for Money - (10,000) (20,000) (20,000) Net revenue expenditure after Reserves (near cash) 1,162,591 1,199,402 1,202,037 1,224,405
Depreciation and amortisation 56,131 57,460 57,444 57,444 Net revenue expenditure after depreciation 1,218,722 1,256,862 1,259,481 1,281,849
Table 2 – Changes to Net Revenue Expenditure
Changes to Revenue Heads of Expenditure |
| ||||||||
£'000 | 2023 Approved | Inflation & Previous New Service Formula Revenue Revenue Area Driven Growth Growth Transfers 2023 Pay Awards | VFM Savings | 2024 Estimate | |||||
Department |
|
|
|
|
|
|
|
| |
Cabinet Office | 67,336 | 1,086 | 3,600 | 4,696 | 3,320 | 137 | (2,907) | 77,268 | |
Children, Young People, Education and Skills Customer and Local Services | 189,688 95,303 | 669 10,173 | 1,949 375 | 4,700 1,642 | 12,266 1,213 | (68) (1,672) | (2,737) (207) | 206,467 106,827 | |
Infrastructure | 45,251 | 1,190 | 7,875 | 1,516 | 1,975 | 63 | (705) | 57,165 | |
Environment | 10,254 | - | (506) | 300 | 1,127 | (104) | (172) | 10,899 | |
Health and Community Services | 249,032 | 10,391 | (6,964) | 21,075 | 14,875 | 1,812 | (3,986) | 286,235 | |
Jersey Overseas Aid | 17,700 | 1,115 | 1,226 | - | - | - | - | 20,041 | |
Justice and Home Affairs | 35,170 | 214 | 1,117 | 1,994 | 2,422 | (276) | (572) | 40,069 | |
States of Jersey Police | 27,108 | 95 | 122 | 237 | 1,939 | (1,744) | (422) | 27,335 | |
Ministry of External Relations Economic Development, Tourism, Sport & Culture | 3,088 32,526 | 52 2,464 | (1) (1,590) | 134 5,250 | 154 339 | - - | (50) (1,870) | 3,377 37,119 | |
Financial Services | 7,738 | 258 | - | 1,496 | 124 | 1,744 | (145) | 11,215 | |
Treasury and Exchequer | 67,388 | 82,334 | 226 | 5,976 | 1,914 | 2,327 | (577) | 159,588 | |
Past Service Pension Liability Refinancing | 13,782 | 8 | - | - | - | - | - | 13,790 | |
Departmental Net Revenue Expenditure | 861,364 | 110,049 | 7,429 | 49,016 | 41,668 | 2,219 | (14,350) | 1,057,395 | |
Non-Ministerial & Other States Bodies |
|
|
|
|
|
|
|
| |
Bailiff 's Chambers | 2,124 | 26 | - | - | 111 | 947 | - | 3,208 | |
Comptroller and Auditor General | 1,078 | - | 44 | 30 | - | - | - | 1,152 | |
Judicial Greffe | 9,127 | 200 | (50) | 194 | 335 | (947) | - | 8,859 | |
Law Officers' Department | 10,881 | 67 | 183 | 902 | 746 | 102 | - | 12,881 | |
Office of the Lieutenant Governor | 839 | 5 | - | - | 61 | - | - | 905 | |
Official Analyst | 685 | 8 | 3 | - | 39 | - | - | 735 | |
Probation | 2,644 | 12 | 41 | 68 | 186 | - | - | 2,951 | |
States Assembly | 8,746 | 55 | (89) | 842 | 350 | - | - | 9,904 | |
Viscount's Department | 2,102 | 9 | - | 125 | 177 | - | - | 2,413 | |
Non-Ministerial Net Revenue Expenditure | 38,226 | 382 | 132 | 2,161 | 2,005 | 102 | - | 43,008 | |
Covid-19 Response | 25,211 | - (22,890) | - | - | (2,321) | - | - | ||
Departmental and Non- Mins Total | 924,801 | 110,431 | (15,329) | 51,177 | 43,673 | - (14,350) | 1,100,403 | ||
Reserves |
|
|
|
|
|
|
| ||
Central Reserve | 60,243 | 51,980 | (3,379) | (2,983) | (43,673) | - - | 62,188 | ||
Reserve Expenditure | 60,243 | 51,980 | (3,379) | (2,983) | (43,673) | - - | 62,188 | ||
Value for Money | - | - | - | - | - | - - | - | ||
Net Revenue Expenditure | 985,044 | 162,411 | (18,708) | 48,194 | - | - (14,350) | 1,162,591 | ||
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| ||
Changes to Revenue Heads of Expenditure (continued) |
|
| ||||||
£'000 | 2024 Estimate | Inflation & Formula Driven Previous New Revenue Revenue Growth Growth | Service Area Transfers Pay Awards | VFM Savings | 2025 Estimate | |||
Department Cabinet Office | 77,268 | - | 150 | (196) | - | - | - | 77,222 |
Children, Young People, Education and Skills Customer and Local Services | 206,467 106,827 | 100 2,271 | 876 (50) | - (450) | - - | - - | - - | 207,443 108,598 |
Infrastructure | 57,165 | - | 1,270 | 305 | - | - | - | 58,740 |
Environment | 10,899 | - | (60) | - | - | - | - | 10,839 |
Health and Community Services | 286,235 | 5,057 | (4,161) | (6,500) | - | (810) | - | 279,821 |
Jersey Overseas Aid | 20,041 | 15 | 1,050 | - | - | - | - | 21,106 |
Justice and Home Affairs | 40,069 | - | 54 | 190 | - | (6) | - | 40,307 |
States of Jersey Police | 27,335 | - | - | 90 | - | - | - | 27,425 |
Ministry of External Relations Economic Development, Tourism, Sport & Culture | 3,377 37,119 | - 53 | (92) (100) | - - | - - | - - | - - | 3,285 37,072 |
Financial Services | 11,215 | - | - | 9 | - | - | - | 11,224 |
Treasury and Exchequer | 159,588 | 13,187 | 8 | 500 | - | - | - | 173,283 |
Past Service Pension Liability Refinancing | 13,790 | 8 | - | - | - | - | - | 13,798 |
Departmental Net Revenue Expenditure | 1,057,395 | 20,691 | (1,055) | (6,052) | - | (816) | - | 1,070,163 |
Non-Ministerial & Other States Bodies |
|
|
|
|
|
|
|
|
Bailiff 's Chambers | 3,208 | - | 200 | - | - | - | - | 3,408 |
Comptroller and Auditor General | 1,152 | - | 34 | 10 | - | - | - | 1,196 |
Judicial Greffe | 8,859 | - | - | (6) | - | - | - | 8,853 |
Law Officers' Department | 12,881 | - | - | 61 | - | - | - | 12,942 |
Office of the Lieutenant Governor | 905 | - | - | - | - | - | - | 905 |
Official Analyst | 735 | - | 3 | - | - | - | - | 738 |
Probation | 2,951 | - | - | (68) | - | - | - | 2,883 |
States Assembly | 9,904 | - | (89) | (8) | - | - | - | 9,807 |
Viscount's Department | 2,413 | - | - | (70) | - | - | - | 2,343 |
Non-Ministerial Net Revenue Expenditure | 43,008 | - | 148 | (81) | - | - | - | 43,075 |
Covid-19 Response | - | - | (816) | - | - | 816 | - | - |
Departmental and Non- Mins Total | 1,100,403 | 20,691 | (1,723) | (6,133) | - | - | - | 1,113,238 |
Reserves |
|
|
|
|
|
|
|
|
Central Reserve | 62,188 | 32,329 | 1,647 | - | - | - | - | 96,164 |
Reserve Expenditure | 62,188 | 32,329 | 1,647 | - | - | - | - | 96,164 |
Value for Money | - | - | - | - | - | - (10,000) | (10,000) | |
Net Revenue Expenditure | 1,162,591 | 53,020 | (76) | (6,133) | - | - (10,000) | 1,199,402 |
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
Changes to Revenue Heads of Expenditure (continued) |
| |||||||
£'000 | 2025 Estimate | Inflation & Formula Driven Previous New Revenue Revenue Growth Growth | Service Area Transfers Pay VFM Awards Savings | 2026 Estimate | ||||
Department |
|
|
|
|
|
|
|
|
Cabinet Office | 77,222 | - | 150 | (312) | - | - | - | 77,060 |
Children, Young People, Education and Skills | 207,443 | 270 | 1,084 | - | - | - | - | 208,797 |
Customer and Local Services | 108,598 | 2,337 | (50) | 3 | - | - | - | 110,888 |
Infrastructure | 58,740 | - | (513) | (1,074) | - | - | - | 57,153 |
Environment | 10,839 | - | 35 | - | - | - | - | 10,874 |
Health and Community Services | 279,821 | 5,150 | 110 | - | - | 6 | - | 285,087 |
Jersey Overseas Aid | 21,106 | 380 | - | - | - | - | - | 21,486 |
Justice and Home Affairs | 40,307 | - | (32) | 44 | - | (6) | - | 40,313 |
States of Jersey Police | 27,425 | - | - | (23) | - | - | - | 27,402 |
Ministry of External Relations | 3,285 | - | - | - | - | - | - | 3,285 |
Economic Development, Tourism, Sport & Culture | 37,072 | 298 | - | - | - | - | - | 37,370 |
Financial Services | 11,224 | - | - | (45) | - | - | - | 11,179 |
Treasury and Exchequer | 173,283 | 490 | (900) | - | - | - | - | 172,873 |
Past Service Pension Liability Refinancing | 13,798 | 8 | - | - | - | - | - | 13,806 |
Departmental Net Revenue Expenditure | 1,070,163 | 8,933 | (116) | (1,407) | - | - | - | 1,077,573 |
Non-Ministerial & Other States Bodies |
|
|
|
|
|
|
|
|
Bailiff 's Chambers | 3,408 | - | (200) | - | - | - | - | 3,208 |
Comptroller and Auditor General | 1,196 | - | 31 | (40) | - | - | - | 1,187 |
Judicial Greffe | 8,853 | - | - | - | - | - | - | 8,853 |
Law Officers' Department | 12,942 | - | - | - | - | - | - | 12,942 |
Office of the Lieutenant Governor | 905 | - | - | - | - | - | - | 905 |
Official Analyst | 738 | - | 3 | - | - | - | - | 741 |
Probation | 2,883 | - | - | - | - | - | - | 2,883 |
States Assembly | 9,807 | - | - | - | - | - | - | 9,807 |
Viscount's Department | 2,343 | - | - | - | - | - | - | 2,343 |
Non-Ministerial Net Revenue Expenditure | 43,075 | - | (166) | (40) | - | - | - | 42,869 |
Covid-19 Response | - | - | - | - | - | - | - | - |
Departmental and Non- Mins Total | 1,113,238 | 8,933 | (282) | (1,447) | - | - | - | 1,120,442 |
Reserves |
|
|
|
|
|
|
|
|
Central Reserve | 96,164 | 8,126 | (2,695) | - | - | - | - | 101,595 |
Reserve Expenditure | 96,164 | 8,126 | (2,695) | - | - | - | - | 101,595 |
Value for Money | (10,000) | - | - | - | - | - (10,000) | (20,000) | |
Net Revenue Expenditure | 1,199,402 | 17,059 | (2,977) | (1,447) | - | - (10,000) | 1,202,037 |
Changes to Revenue Heads of Expenditure (continued) |
| |||||||
£'000 | 2026 Estimate | Inflation & Formula Driven Previous New Revenue Revenue Growth Growth | Service Area Transfers Pay VFM Awards Savings | 2027 Estimate | ||||
Department Cabinet Office | 77,060 | - | - | - | - | - | - | 77,060 |
Children, Young People, Education and Skills | 208,797 | 210 | - | - | - | - | - | 209,007 |
Customer and Local Services | 110,888 | 1,240 | (50) | 3 | - | - | - | 112,081 |
Infrastructure | 57,153 | - | - | (163) | - | - | - | 56,990 |
Environment | 10,874 | - | - | - | - | - | - | 10,874 |
Health and Community Services | 285,087 | 5,243 | - | - | - | - | - | 290,330 |
Jersey Overseas Aid | 21,486 | 623 | - | - | - | - | - | 22,109 |
Justice and Home Affairs | 40,313 | - | - | 44 | - | - | - | 40,357 |
States of Jersey Police | 27,402 | - | - | (21) | - | - | - | 27,381 |
Ministry of External Relations | 3,285 | - | - | - | - | - | - | 3,285 |
Economic Development, Tourism, Sport & Culture | 37,370 | 366 | - | - | - | - | - | 37,736 |
Financial Services | 11,179 | - | - | (25) | - | - | - | 11,154 |
Treasury and Exchequer | 172,873 | 1,181 | - | - | - | - | - | 174,054 |
Past Service Pension Liability Refinancing | 13,806 | - | - | - | - | - | - | 13,806 |
Departmental Net Revenue Expenditure | 1,077,573 | 8,863 | (50) | (162) | - | - | - | 1,086,224 |
Non-Ministerial & Other States Bodies |
|
|
|
|
|
|
|
|
Bailiff 's Chambers | 3,208 | - | - | - | - | - | - | 3,208 |
Comptroller and Auditor General | 1,187 | - | - | 28 | - | - | - | 1,215 |
Judicial Greffe | 8,853 | - | - | - | - | - | - | 8,853 |
Law Officers' Department | 12,942 | - | - | - | - | - | - | 12,942 |
Office of the Lieutenant Governor | 905 | - | - | - | - | - | - | 905 |
Official Analyst | 741 | - | - | 50 | - | - | - | 791 |
Probation | 2,883 | - | - | - | - | - | - | 2,883 |
States Assembly | 9,807 | - | - | - | - | - | - | 9,807 |
Viscount's Department | 2,343 | - | - | - | - | - | - | 2,343 |
Non-Ministerial Net Revenue Expenditure | 42,869 | - | - | 78 | - | - | - | 42,947 |
Covid-19 Response | - | - | - | - | - | - | - | - |
Departmental and Non- Mins Total | 1,120,442 | 8,863 | (50) | (84) | - | - | - | 1,129,171 |
Reserves |
|
|
|
|
|
|
|
|
Central Reserve | 101,595 | 13,639 | - | - | - | - | - | 115,234 |
Reserve Expenditure | 101,595 | 13,639 | - | - | - | - | - | 115,234 |
Value for Money | (20,000) | - | - | - | - | - | - | (20,000) |
Net Revenue Expenditure | 1,202,037 | 22,502 | (50) | (84) | - | - | - | 1,224,405 |
Table 3 - Service Transfers
| Service Transfers [1] 0F0F0F |
|
|
|
|
|
|
|
|
|
|
£'000 |
|
|
|
| 2024 | ||||||
Transfer from |
| Transfer to |
| Description | Estimate | ||||||
Covid-19 Response |
| Health and Community Services |
| Personal Protective Equipment | 2,321 | ||||||
Environment |
| Infrastructure |
| Driver and Vehicle Standards | 209 | ||||||
Infrastructure |
| Cabinet Office |
| Building Management Function | 41 | ||||||
Cabinet Office |
| Treasury & Exchequer |
| Corporate Portfolio Management Office | 1,184 | ||||||
Cabinet Office |
| Treasury & Exchequer |
| Health & Safety | 426 | ||||||
Judicial Greffe |
| Bailiff s Chamber |
| Crown Appointment Staff Costs | 947 | ||||||
Cabinet Office |
| Treasury & Exchequer |
| Risk to Assurance & Risk | 292 | ||||||
Cabinet Office |
| Treasury & Exchequer |
| Freedom of Information | 214 | ||||||
Cabinet Office |
| Treasury & Exchequer |
| Strategic Directorate Assurance & Risk | 202 | ||||||
Customer and Local Services |
| Cabinet Office |
| PeopleHub | 1,728 | ||||||
Health and Community Services |
| Law Officers' Department |
| Civil Division Support | 102 | ||||||
Justice and Home Affairs |
| Health and Community Services |
| HCS Vehicle Fleet | 276 | ||||||
Health and Community Services |
| Cabinet Office |
| HCS accommodation | 741 | ||||||
Health and Community Services |
| Customer and Local Services |
| Community Liaison for Deaf Blind post | 56 |
Children, Young People & Education Health and Community Services School Nurse 34 Children, Young People & Education Cabinet Office Immunisation Nurse 34 Cabinet Office Health and Community Services IT Training Manager 80 States of Jersey Police Financial Services Financial Intelligence Unit 1,744
10
GOVERNMENT PLAN 2024 – 2027 ANNEX
Table 4 – Ministerial Mapping
Ministerial Mapping[1]
£'000
Cabinet Office[2] Children, Young People, Education and Skills Customer and Local Services Infrastructure Environment Health and Community Services Jersey Overseas Aid Justice and Home Affairs[3] States of Jersey Police Ministry of External Relations Econ Development, Tourism, Sport & Culture[4] Financial Services Treasury and Exchequer[5] Past Service Pension Liability Refinancing Financing Costs | 69,336 - - - - - - - - - - 11,215 2,297 - - | 558 - - - - - - - - - - - - - - | - - - - - - - - - - 36,819 - - - - | - 206,467 - - - - - - - - - - - - - | - - - - - - - - - 3,377 300 - - - - | 7,374 - - - - 286,235 - - - - - - - - - | - - - - - - - 39,449 27,335 - - - - - - | - - - 57,165 - - - - - - - - - - - | - - - - - - 20,041 - - - - - - - - | - - 106,827 - - - - 620 - - - - - - - | - - - - 10,899 - - - - - - - - - - | - - - - - - - - - - - - 157,291 13,790 - | - - - - - - - - - - - - - - - | 77,268 206,467 106,827 57,165 10,899 286,235 20,041 40,069 27,335 3,377 37,119 11,215 159,588 13,790 - |
Governmental Net Revenue Expenditure | 82,848 | 558 | 36,819 | 206,467 | 3,677 | 293,609 | 66,784 | 57,165 | 20,041 | 107,447 | 10,899 | 171,081 | - | 1,057,395 |
Non-Ministerial Expenditure | - | - | - | - | - | - | - | - |
| - | - | - | 43,008 | 43,008 |
Total Net Revenue Expenditure | 82,848 | 558 | 36,819 | 206,467 | 3,677 | 293,609 | 66,784 | 57,165 | 20,041 | 107,447 | 10,899 | 171,081 | 43,008 | 1,100,403 |
GOVERNMENT PLAN 2024 – 2027 ANNEX
Table 5 – Arts, Heritage, and Culture Revenue Expenditure
Arts, Heritage, and Culture (AHC) Revenue Expenditure [1] 6F6F6F |
|
|
|
|
| 2024 | 2025 | 2026 | 2027 |
£'000 Estimate Estimate Estimate Estimate Net Revenue Expenditure (before AHC) 1,128,465 1,164,416 1,186,826 1,248,578 AHC Target 1% 11,285 11,644 11,868 12,486 Base Budget - AHC 10,635 10,734 10,731 10,731 Inflation - AHC 427 534 661 911 Additional Revenue Growth - AHC 222 376 477 843 Net Revenue Expenditure - AHC 11,285 11,644 11,868 12,486 Net Revenue Expenditure - AHC % 1.00% 1.00% 1.00% 1.00%
GOVERNMENT PLAN 2023 – 2026 ANNEX
PART 2 DEPARTMENTAL FINANCIAL INFORMATION
Cabinet Office
Minister | Chief Minister Minister for Health and Social Services (Public Health) Minister for Housing and Communities (Strategic Housing) |
Accountable Officers | Assistant Chief Executive and Chief Officer Strategic Policy, Planning and Performance Assistant Chief Executive and Treasurer of the States Strategic Director of Assurance and Risk Director of Communications |
Department | Cabinet Office |
Further information on services provided |
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure |
|
|
|
|
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations 5,120 5,120 5,120 5,120 Total revenue 5,120 5,120 5,120 5,120 Expenditure
Social benefit payments - - - - Staff costs 51,144 50,930 50,884 50,884 Other operating expenses 30,755 30,923 30,807 30,807 Grants and subsidies payments 489 489 489 489 Impairments - - - - Finance costs - - - - Total expenditure 82,388 82,342 82,180 82,180 Net revenue expenditure (near cash) 77,268 77,222 77,060 77,060 Depreciation and amortisation 1,891 2,725 2,709 2,709 Net revenue expenditure after depreciation 79,159 79,947 79,769 79,769
Service Analysis
Service Level Analysis
2024 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Modernisation and Digital | 1,452 | 39,723 | 38,271 | 1,830 | 40,101 | 250.0 |
People and Corporate Services | 2,482 | 15,428 | 12,946 | - | 12,946 | 165.3 |
CEO & Ministerial Office | - | 3,203 | 3,203 | - | 3,203 | 30.0 |
Communications | 565 | 3,094 | 2,529 | - | 2,529 | 42.0[1] |
Statistics and Analytics | - | 1,951 | 1,951 | - | 1,951 | 21.5 |
Public Policy | 33 | 3,549 | 3,516 | - | 3,516 | 37.8 |
Public Health | - | 7,374 | 7,374 | - | 7,374 | 61.0 |
Strategy and Innovation | - | 2,079 | 2,079 | - | 2,079 | 17.0 |
Delivery Unit and Governance | - | 880 | 880 | - | 880 | 15.0 |
Arm's Length Functions | 588 | 5,107 | 4,519 | 61 | 4,580 | 43.0 |
Total | 5,120 | 82,388 | 77,268 | 1,891 | 79,159 | 682.6 |
Service Level Analysis
2025 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Modernisation and Digital | 1,452 | 39,923 | 38,471 | 2,685 | 41,156 | 250.0 |
People and Corporate Services | 2,482 | 15,428 | 12,946 | - | 12,946 | 165.3 |
CEO & Ministerial Office | - | 3,203 | 3,203 | - | 3,203 | 30.0 |
Communications | 565 | 3,094 | 2,529 | - | 2,529 | 42.0 |
Statistics and Analytics | - | 1,994 | 1,994 | - | 1,994 | 21.5 |
Public Policy | 33 | 3,549 | 3,516 | - | 3,516 | 37.8 |
Public Health | - | 7,188 | 7,188 | - | 7,188 | 61.0 |
Strategy and Innovation | - | 2,026 | 2,026 | - | 2,026 | 17.0 |
Delivery Unit and Governance | - | 880 | 880 | - | 880 | 15.0 |
Arm's Length Functions | 588 | 5,057 | 4,469 | 40 | 4,509 | 43.0 |
Total | 5,120 | 82,342 | 77,222 | 2,725 | 79,947 | 682.6 |
Service Level Analysis
2026 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Modernisation and Digital | 1,452 | 40,123 | 38,671 | 2,685 | 41,356 | 250.0 |
People and Corporate Services | 2,482 | 15,428 | 12,946 | - | 12,946 | 165.3 |
CEO & Ministerial Office | - | 3,203 | 3,203 | - | 3,203 | 30.0 |
Communications | 565 | 3,094 | 2,529 | - | 2,529 | 42.0 |
Statistics and Analytics | - | 1,994 | 1,994 | - | 1,994 | 21.5 |
Public Policy | 33 | 3,549 | 3,516 | - | 3,516 | 37.8 |
Public Health | - | 6,876 | 6,876 | - | 6,876 | 61.0 |
Strategy and Innovation | - | 2,026 | 2,026 | - | 2,026 | 17.0 |
Delivery Unit and Governance | - | 880 | 880 | - | 880 | 15.0 |
Arm's Length Functions | 588 | 5,007 | 4,419 | 24 | 4,443 | 43.0 |
Total | 5,120 | 82,180 | 77,060 | 2,709 | 79,769 | 682.6 |
Service Level Analysis
2027 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Modernisation and Digital | 1,452 | 40,123 | 38,671 | 2,685 | 41,356 | 250.0 |
People and Corporate Services | 2,482 | 15,428 | 12,946 | - | 12,946 | 165.3 |
CEO & Ministerial Office | - | 3,203 | 3,203 | - | 3,203 | 30.0 |
Communications | 565 | 3,094 | 2,529 | - | 2,529 | 42.0 |
Statistics and Analytics | - | 1,994 | 1,994 | - | 1,994 | 21.5 |
Public Policy | 33 | 3,549 | 3,516 | - | 3,516 | 37.8 |
Public Health | - | 6,876 | 6,876 | - | 6,876 | 61.0 |
Strategy and Innovation | - | 2,026 | 2,026 | - | 2,026 | 17.0 |
Delivery Unit and Governance | - | 880 | 880 | - | 880 | 15.0 |
Arm's Length Functions | 588 | 5,007 | 4,419 | 24 | 4,443 | 43.0 |
Total | 5,120 | 82,180 | 77,060 | 2,709 | 79,769 | 682.6 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate
I-SPP-GP24-001 Statistics Jersey – Administrative data linkage team 393 436 436 436 I-SPP-GP24-002 Health Board 206 206 206 206 I-SPP-GP24-003 Continuation of Strategic Health Policy and Governance Team 387 387 387 387 I-SPP-GP24-004 Maintaining the Public Health and Health Protection Function 2,273 2,273 2,273 2,273 I-SPP-GP24-005 Major Incident Health and Wellbeing Recovery Programme 899 713 401 401 I-SPP-GP24-006 Strategic Housing and Regeneration Team 138 85 85 85 I-SPP-GP24-007 Vaccine Scheme 400 400 400 400 Total 4,696 4,500 4,188 4,188
Summary of Revenue Growth Allocations
I-SPP-GP24-001 Statistics Jersey – Administrative data linkage team
Statistics Jersey secured Covid Health Recovery funding for 2022-23 to develop a system to link data already held by government to provide insights to support recovery from the pandemic. The new team have linked administrative data sources and have published detailed population and migration statistics for the period 2017 to 2021, showing the changes over the course of the covid pandemic.
This funding will allow continuation of the more accurate, frequent, and granular population and migration statistics through this approach and will deliver on the Chief Minister's plan commitment to provide ". resources to collect accurate and timely statistics on populations trends including migration and immigration volumes and analysis." The funding will also allow Statistics Jersey to publish Island-wide gender pay gap data on an annual basis, in line with
ministerial commitments.
A linked administrative data team will allow for new developments such as production of quarterly Gross Value Added (GVA), more frequent data on average earnings and income (which are required to understand the economy and affordable living). The development may be able to deliver on the scrutiny recommendation to review the feasibility of using administrative data already held by government (e.g. on tax and social security) to produce indicators of low income
and duration.
I-SPP-GP24-002 Health Board
On 14 June 2023 the States Assembly agreed the establishment of an Advisory Board for the Health and Community Services Department. The Board will include independent non-executive directors with the skills, knowledge, and experience necessary to critically examine, direct and constructively challenge the Department. The Board will work to ensure robust management of corporate and clinical risks and will advise the Minister for Health and Social Services on priorities for reform and improvement. The funding will provide for the costs associated with the non-executive directors.
I-SPP-GP24-003 Continuation of Strategic Health Policy and Governance Team
In 2022 a decision was taken to fund a dedicated health policy function to the end of 2023. Health policy had previously been undertaken by operational officers and clinical managers, diverting them for their core duties. The Government Plan provides the salary costs associated with the existing health policy staff, whose work includes various duties including the following: health funding reform, women's health, assisted dying, amendments to mental health and capacity laws and reform of medicines law and misuse of drugs laws.
I-SPP-GP24-004 Maintaining the Public Health and Health Protection Function
Public health services are critical for keeping the island safe, preventing disease, reducing health inequalities, and improving the population's health, through for example, managing outbreaks of infectious disease, developing alcohol policy, or delivering child nutrition programmes. Short term funding has been invested since 2020 to build the health protection function and commission or deliver some health improvement services, ensuring that islanders are kept safe and ill health such as diabetes and hypertension is prevented and reduced. The Government Plan provides the salary costs associated with the existing public health staff, enabling the development of joint strategic needs assessments (JSNA), public health law, delivery of some health improvement services and public health campaigns.
I-SPP-GP24-005 Major Incident Health and Wellbeing Recovery Programme
Since December 2022, Jersey has needed to respond to an unforeseen and unprecedented number of major incidents in a very short space of time, resulting in significant loss of life for our small island community, with bereavement, displacement and trauma experienced by many. Learning from tragedies in other jurisdictions confirms that both the psychological and physiological effects from major incidents can be experienced long after the event, and in different ways over time. Investment from this Government Plan will provide recovery support for those affected (both the public and responders) including psychological interventions and complex trauma support, health checks, wellbeing and social support co-ordinated via a Post Incident Support Hub and longer-term wellbeing monitoring.
I-SPP-GP24-006 Strategic Housing and Regeneration Team
The Council of Ministers made a commitment to review the resources allocated to housing, to ensure strong and sustained action to tackle the housing crisis and increase home ownership in Jersey. Additional funding of £300,000 has been allocated to support enhancements to the capacity of the Housing Advice Service (Customer and Local Services) and Strategic Housing and Regeneration Team (Cabinet Office), to accelerate the development and implementation of action to address the housing crisis in Jersey.
I-SPP-GP24-007 Vaccine Scheme
Vaccination is a powerful, cost-effective and preventive safeguard in reducing deaths and severe disease. Delivery of core vaccination programmes has been a major success in preventing infectious disease in Jersey. Jersey's vaccination programmes are currently aligned to those in all other parts of the British Isles. Jersey will continue to align vaccination strategy to the rest of the British Isles, however in a post-pandemic environment, the next step is to remodel and develop the delivery system for COVID and influenza vaccination alongside routine childhood and adult immunisations programmes.
Optimising vaccination coverage is complex, and dependent on a number of factors, including access, affordability, behavioural factors, and the knowledge/attitudes of populations. This investment is to focus on the ambition to maintain and improve uptake, enhance resilience by providing capacity and support to manage surges when there is increased demand or unforeseen emerging threats and reduce inequalities associated with accessibility to vaccination for all eligible Islanders.
Children, Young People, Education and Skills
Minister | Minister for Children and Education |
Accountable Officers | Chief Officer, Children, Young People, Education and Skills |
Department | Children, Young People, Education and Skills |
Further information on services provided | |
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations 22,945 22,945 22,945 22,945 Total revenue 22,945 22,945 22,945 22,945 Expenditure
Social benefit payments 17,460 17,560 17,830 18,040 Staff costs 168,663 169,401 170,354 170,354 Other operating expenses 32,452 32,452 32,452 32,452 Grants and subsidies payments 10,827 10,965 11,096 11,096 Impairments - - - - Finance costs 10 10 10 10 Total expenditure 229,412 230,388 231,742 231,952 Net revenue expenditure (near cash) 206,467 207,443 208,797 209,007 Depreciation and amortisation 125 125 125 125 Net revenue expenditure after depreciation 206,592 207,568 208,922 209,132
Service Level Analysis
Service Level Analysis
2024 Estimate | Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Children's Social Care & Safeguarding | 6 | 34,124 | 34,118 | - | 34,118 | 370.0 |
Education | 21,225 | 153,835 | 132,610 | 80 | 132,690 | 1,999.0 |
Integrated Services and Commissioning | 81 | 11,199 | 11,118 | - | 11,118 | 129.0 |
Office of the Chief Officer | 653 | 5,537 | 4,884 | 37 | 4,921 | 25.0 |
Skills and Student Finance | 14 | 20,274 | 20,260 | - | 20,260 | 41.0 |
Young People | 966 | 4,443 | 3,477 | 8 | 3,485 | 62.5 |
Total | 22,945 | 229,412 | 206,467 | 125 | 206,592 | 2,626.5 |
Service Level Analysis
2025 Estimate | Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Children's Social Care & Safeguarding | 6 | 33,674 | 33,668 | - | 33,668 | 370.0 |
Education | 21,225 | 155,161 | 133,936 | 80 | 134,016 | 1,999.0 |
Integrated Services and Commissioning | 81 | 11,199 | 11,118 | - | 11,118 | 129.0 |
Office of the Chief Officer | 653 | 5,537 | 4,884 | 37 | 4,921 | 25.0 |
Skills and Student Finance | 14 | 20,374 | 20,360 | - | 20,360 | 41.0 |
Young People | 966 | 4,443 | 3,477 | 8 | 3,485 | 62.5 |
Total | 22,945 | 230,388 | 207,443 | 125 | 207,568 | 2,626.5 |
Service Level Analysis
2026 Estimate | Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Children's Social Care & Safeguarding | 6 | 33,224 | 33,218 | - | 33,218 | 370.0 |
Education | 21,225 | 156,695 | 135,470 | 80 | 135,550 | 1,999.0 |
Integrated Services and Commissioning | 81 | 11,199 | 11,118 | - | 11,118 | 129.0 |
Office of the Chief Officer | 653 | 5,537 | 4,884 | 37 | 4,921 | 25.0 |
Skills and Student Finance | 14 | 20,644 | 20,630 | - | 20,630 | 41.0 |
Young People | 966 | 4,443 | 3,477 | 8 | 3,485 | 62.5 |
Total | 22,945 | 231,742 | 208,797 | 125 | 208,922 | 2,626.5 |
Service Level Analysis
2027 Estimate | Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Children's Social Care & Safeguarding | 6 | 33,224 | 33,218 | - | 33,218 | 370.0 |
Education | 21,225 | 156,695 | 135,470 | 80 | 135,550 | 1,999.0 |
Integrated Services and Commissioning | 81 | 11,199 | 11,118 | - | 11,118 | 129.0 |
Office of the Chief Officer | 653 | 5,537 | 4,884 | 37 | 4,921 | 25.0 |
Skills and Student Finance | 14 | 20,854 | 20,840 | - | 20,840 | 41.0 |
Young People | 966 | 4,443 | 3,477 | 8 | 3,485 | 62.5 |
Total | 22,945 | 231,952 | 209,007 | 125 | 209,132 | 2,626.5 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate I-CYP-GP24-001 Children's Social Care Reform – New Homes 1,700 1,700 1,700 1,700 I-CYP-GP24-002 Investment across CYPES frontline services 2,615 2,607 2,599 2,591 I-CYP-GP24-003 Investment in young people workforce participation 385 393 401 409 Total 4,700 4,700 4,700 4,700
Summary of Revenue Growth Allocations
I-CYP-GP24-001 Children's Social Care Reform – New Homes
It has been acknowledged that more homes are required for children in the care of the Minister. This project has set out a plan to increase the number and range of homes available for children. In the first quarter of 2023 the Minister, urgently provided safe care for a small number of children. The service has subsequently set up two new children's homes to meet the unanticipated urgent needs of children in care. The purpose of the funding is to provide the resources required to staff and run the extra two children's homes.
The global pandemic has had significant impact on children, young people, and their parents/carers with increased levels of complexity of need and referrals to services supporting children with vulnerabilities, emotional and mental health issues and or risk.
Children come into care generally at very short notice or on an emergency basis as a result of matters of safeguarding and protection. Some children will be subject to emergency orders providing protection from harm, court processes or because someone with parental responsibility is not able to discharge that responsibility.
The Minister is required to provide a home (care placement) in these circumstances.
I-CYP-GP24-002 Investment across CYPES frontline services
The needs of children and young people are changing following an unprecedented period of disruption over the past four years. It is internationally recognised that the pandemic will have a long-lasting impact on children and young people and this impact is felt both in schools and in homes. Professionals' understanding of need and how best to support children and young people is continually evolving and it is understood that different cohorts of children require very specialised education and care interventions in order for them to achieve their best outcomes. Post pandemic, increased numbers of young people requiring different types of specialist support are still being identified. This Government Plan request provides the Children, Young People, Education and Skills Department with additional resources to target those with high levels of need in nursery, educational, youth services and care settings. These interventions will allow children and young people to thrive and achieve higher outcomes throughout their childhood and into adulthood.
I-CYP-GP24-003 Investment in young people workforce participation
The effects of young people disengaging from education, employment or training, or simply not having a clear destination established upon leaving statutory education can cause long term detrimental effect on their prospects.
It is challenging to engage this group of young people and support them to access the wide range of opportunities generally available. Sometimes there is no appropriate provision to match their individual needs and sometimes the choice is confusing.
This provision will consolidate all current provisions and services working to reduce the number of young people without a destination after finishing full time education. Through partnership working the opportunities for these young people will be reimagined and a young person centric approach will be created. This will include a Triage Service that will act as an instrument to assist young people identified as, or at risk of becoming, NEET' (not in employment, education, or training) to be supported in re-engaging in bespoke education or training opportunities as well as more traditional routes into education and/or employment. Throughout, a support network will be in place to reduce confusion and improve engagement, with the aim to always have a supportive relationship with the young person.
Customer and Local Services
Minister | Minister for Social Security |
Accountable Officer | Chief Officer, Customer and Local Services |
Department | Customer and Local Services |
Further information on services provided | |
|
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure |
|
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations 11,774 11,774 11,774 11,774 Total revenue 11,774 11,774 11,774 11,774 Expenditure
Social benefit payments 92,092 94,363 96,700 97,940 Staff costs 15,723 15,776 15,776 15,591 Other operating expenses 5,489 4,989 4,989 5,174 Grants and subsidies payments 5,297 5,244 5,197 5,150 Impairments - - - - Finance costs - - - - Total expenditure 118,601 120,372 122,662 123,855 Net revenue expenditure (near cash) 106,827 108,598 110,888 112,081 Depreciation and amortisation 4 4 4 4 Net revenue expenditure after 106,831 108,602 110,892 112,085
depreciation
Service Level Analysis
Service Level Analysis
2024 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Customer Operations | 9,524 | 108,358 | 98,834 | - | 98,834 | 170.3 |
Customer Services | 1,757 | 6,754 | 4,997 | - | 4,997 | 108.9 |
Local Services | 493 | 3,489 | 2,996 | 4 | 3,000 | 5.5 |
Total | 11,774 | 118,601 | 106,827 | 4 | 106,831 | 284.8 |
Service Level Analysis
2025 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Customer Operations | 9,524 | 110,182 | 100,658 | - | 100,658 | 170.3 |
Customer Services | 1,757 | 6,754 | 4,997 | - | 4,997 | 108.9 |
Local Services | 493 | 3,436 | 2,943 | 4 | 2,947 | 5.5 |
Total | 11,774 | 120,372 | 108,598 | 4 | 108,602 | 284.8 |
Service Level Analysis
2026 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Customer Operations | 9,524 | 112,519 | 102,995 | - | 102,995 | 170.3 |
Customer Services | 1,757 | 6,754 | 4,997 | - | 4,997 | 108.9 |
Local Services | 493 | 3,389 | 2,896 | 4 | 2,900 | 5.5 |
Total | 11,774 | 122,662 | 110,888 | 4 | 110,892 | 284.8 |
Service Level Analysis
2027 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Customer Operations | 9,524 | 113,944 | 104,420 | - | 104,420 | 170.3 |
Customer Services | 1,757 | 6,569 | 4,812 | - | 4,812 | 108.9 |
Local Services | 493 | 3,342 | 2,849 | 4 | 2,853 | 5.5 |
Total | 11,774 | 123,855 | 112,081 | 4 | 112,085 | 284.8 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate I-CLS-GP24-001 Community Compass 380 377 380 383 I-CLS-GP24-002 Housing Advice Services 162 215 215 215 I-CLS-GP24-003 Jersey Pension Saver Scheme 500 - - - I-CLS-GP24-004[2] Children with Life Changing Conditions 600 600 600 600 Total 1,642 1,192 1,195 1,198
Summary of Revenue Growth Allocations
I-CLS-GP24-001 Community Compass
The investment will see the continuation of the successful Community Compass project that has seen more than 90 small grants awarded across the community, engaging more islanders in art, culture and physical activities. This has supported social mobility and has also enabled local charities to increase their capacity as Community Navigators, supporting islanders of all ages. The investment will be distributed across local charities, sports clubs and art and cultural organisations to empower them to be more inclusive and make activities affordable.
I-CLS-GP24-002 Housing Advice Services
This funding will provide additional resources for the Housing Advice Service in Customer and Local Services to support the expansion of Housing services. This funding supports the Ministerial priority for a relentless focus for housing. The resources allocated will help deliver the actions within the published Roadmap for improved access to social housing in Jersey (published in July 2023).
I-CLS-GP24-003 Jersey Pension Saver Scheme
Plans for a new retirement saving scheme for working Islanders who do not have an occupational pension are being developed. The main details of the scheme will be debated by the States Assembly in Q4 2023. Subject to States approval, public and stakeholder consultation will follow at the end of 2023 and early 2024. This funding will ensure the continued development including regulation, legislation, procurement, and the approach and readiness to implement, leading to a final States decision at the end of 2024.
Infrastructure
Minister | Minister for Infrastructure |
Accountable Officer | Chief Officer, Infrastructure and Environment |
Department | Infrastructure and Environment |
Further information on services provided |
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey 22 22 22 22 Earned through operations 24,621 24,577 25,224 25,224 Total revenue 24,643 24,599 25,246 25,246 Expenditure
Social benefit payments - - - - Staff costs 30,802 30,802 30,802 30,802 Other operating expenses 48,633 50,164 49,224 49,061 Grants and subsidies payments 742 742 742 742 Impairments 26 26 26 26 Finance costs 1,605 1,605 1,605 1,605 Total expenditure 81,808 83,339 82,399 82,236 Net revenue expenditure (near cash) 57,165 58,740 57,153 56,990 Depreciation and amortisation 46,677 46,677 46,677 46,677 Net revenue expenditure after depreciation 103,842 105,417 103,830 103,667
Service Level Analysis
Service Level Analysis
2024 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Office of the Chief Officer | 489 | 1,051 | 562 | - | 562 | 6.7 |
Sports | 3,877 | 8,059 | 4,182 | 155 | 4,337 | 90.4 |
Operations and Transport | 12,723 | 49,056 | 36,333 | 21,125 | 57,458 | 376.4 |
Property | 7,554 | 23,642 | 16,088 | 25,397 | 41,485 | 50.8 |
Total | 24,643 | 81,808 | 57,165 | 46,677 | 103,842 | 524.3 |
Service Level Analysis
2025 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Office of the Chief Officer | 489 | 1,051 | 562 | - | 562 | 6.7 |
Sports | 3,828 | 8,059 | 4,231 | 155 | 4,386 | 90.4 |
Operations and Transport | 12,728 | 49,081 | 36,353 | 21,125 | 57,478 | 376.4 |
Property | 7,554 | 25,148 | 17,594 | 25,397 | 42,991 | 50.8 |
Total | 24,599 | 83,339 | 58,740 | 46,677 | 105,417 | 524.3 |
Service Level Analysis
2026 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Office of the Chief Officer | 489 | 1,051 | 562 | - | 562 | 6.7 |
Sports | 4,470 | 8,059 | 3,589 | 155 | 3,744 | 90.4 |
Operations and Transport | 12,733 | 48,573 | 35,840 | 21,125 | 56,965 | 376.4 |
Property | 7,554 | 24,716 | 17,162 | 25,397 | 42,559 | 50.8 |
Total | 25,246 | 82,399 | 57,153 | 46,677 | 103,830 | 524.3 |
Service Level Analysis
2027 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Office of the Chief Officer | 489 | 1,051 | 562 | - | 562 | 6.7 |
Sports | 4,470 | 8,059 | 3,589 | 155 | 3,744 | 90.4 |
Operations and Transport | 12,733 | 48,573 | 35,840 | 21,125 | 56,965 | 376.4 |
Property | 7,554 | 24,553 | 16,999 | 25,397 | 42,396 | 50.8 |
Total | 25,246 | 82,236 | 56,990 | 46,677 | 103,667 | 524.3 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate
I-IHE-GP24-001 Ambulance Station HQ Maintenance 423 679 247 84 I-IHE-GP24-002 Fort Regent 1,093 1,142 500 500 Total 1,516 1,821 747 584
Summary of Revenue Growth Allocations
I-IHE-GP24-001 Ambulance Station HQ Maintenance
Plans are underway for a new Ambulance Headquarters and Station; the process to completion is projected to take 5-10 years with the current building in urgent need of essential backlog maintenance. An independently commissioned building condition survey (2022) has identified an absolute requirement for essential maintenance and has confirmed the requirement for a risk stratified program of works to be undertaken over 5 years. These range from urgent health and safety matters to essential works and preventative maintenance, to prevent further deterioration and service disruption.
The Ambulance Headquarters and Station were built in the early 1980's, it is a critical national asset providing a 24/7/365 prehospital emergency service. No alternative Ambulance HQ exists on island; therefore, it is essential the estates infrastructure and its operational capability is maintained, to ensure the delivery of an effective emergency service with a building that maintains a safe working environment.
Further to the conduct of a condition report it was bought to light that investment was urgently required. With investment, opportunity exists to safely maintain the service on the current site and improve the health and safety of staff and contractors working, by preventing further deterioration and the possibility of the building becoming unusable.
I-IHE -GP24-002 Fort Regent
The Inspiring Active Places Strategy considered potential investment requirements in public sports facilities over a period of 10 years and was created in partnership with key stakeholders involved in the development and delivery of community sport and physical activity on the Island. The public sport and wellbeing hubs will provide a range of multipurpose activity areas which will accommodate a wide range of sports and physical activities.
This strategy involved the decant of Fort Regent facilities, being the services moved to other sports infrastructures, including existing ones to be repurposed and new ones to be built. The gym facilities at Fort Regent were successfully moved to a refurbished Springfield facility with the other clubs and services to be moved to Oakfield once new built facilities are operational.
Due to unforeseen financial issues, the company that was awarded the tender to build Oakfield new sports facilities ceased operations, resulting in a project delay, and the construction is being re tendered. This has led to the need to keep Fort Regent operational until the end of the construction of the new sports facilities at Oakfield.
These operation level needs to be maintained firstly to keep the community service to the various sports still at Fort Regent and with no new home to migrate to, and secondly to the associated services widely used by the community like the café and play area, the nursery, and the events halls.
The construction of the new sports facilities will benefit islanders for years to come and provide facilities for a variety of sports and activities.
Environment
Minister | Minister for the Environment |
Accountable Officer | Chief Officer, Infrastructure and Environment |
Department | Infrastructure and Environment |
Further information on services provided |
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations 6,351 6,352 6,352 6,352 Total revenue 6,351 6,352 6,352 6,352 Expenditure
Social benefit payments - - - - Staff costs 14,169 14,393 14,427 14,427 Other operating expenses 2,931 2,648 2,649 2,649 Grants and subsidies payments 148 148 148 148 Impairments - - - - Finance costs 2 2 2 2 Total expenditure 17,250 17,191 17,226 17,226 Net revenue expenditure (near cash) 10,899 10,839 10,874 10,874 Depreciation and amortisation 233 233 233 233 Net revenue expenditure after depreciation 11,132 11,072 11,107 11,107
Service Level Analysis
Service Level Analysis
2024 Estimate Near-Cash Net Revenue Non-Cash Net Revenue FTE £'000 Income Expenditure Expenditure Depreciation Expenditure Employees
Office of the Chief Officer 490 953 463 - 463 6.7 Natural Environment 814 7,278 6,464 68 6,532 73.4 Regulation 5,047 9,019 3,972 165 4,137 110.0 Total 6,351 17,250 10,899 233 11,132 190.1
Service Level Analysis
2025 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Office of the Chief Officer | 490 | 953 | 463 | - | 463 | 6.7 |
Natural Environment | 815 | 7,219 | 6,404 | 68 | 6,472 | 73.4 |
Regulation | 5,047 | 9,019 | 3,972 | 165 | 4,137 | 110.0 |
Total | 6,352 | 17,191 | 10,839 | 233 | 11,072 | 190.1 |
Service Level Analysis
2026 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Office of the Chief Officer | 490 | 953 | 463 | - | 463 | 6.7 |
Natural Environment | 815 | 7,254 | 6,439 | 68 | 6,507 | 73.4 |
Regulation | 5,047 | 9,019 | 3,972 | 165 | 4,137 | 110.0 |
Total | 6,352 | 17,226 | 10,874 | 233 | 11,107 | 190.1 |
Service Level Analysis
2027 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Office of the Chief Officer | 490 | 953 | 463 | - | 463 | 6.7 |
Natural Environment | 815 | 7,254 | 6,439 | 68 | 6,507 | 73.4 |
Regulation | 5,047 | 9,019 | 3,972 | 165 | 4,137 | 110.0 |
Total | 6,352 | 17,226 | 10,874 | 233 | 11,107 | 190.1 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate I-IHE-GP24-003 Natural Environment Team 300 300 300 300
Total 300 300 300 300
Summary of Revenue Growth Allocations
I-IHE-GP24-003 Natural Environment Team
Government policies such as the Carbon Neutral Roadmap, the Outline Economic Framework and the Bridging Island Plan have all placed additional emphasis on protection and monitoring of our environment, resulting in growth in demand for services and pressure on resourcing, additional funding to maintain existing temporarily funded resource and secure additional resource to ensure the Directorate can deliver Government's strategic aims and Jersey's international commitments.
Also, Jersey's participation in environment chapters of Free Trade Agreements depend on the Island's ability to deliver on environmental commitments (separate to sanitary and phytosanitary requirements under the Brexit workstream). This is subject to UK Government scrutiny of Jersey's operational and legislative delivery. New obligations from international commitments such as the United Nations Biodiversity Commitment (signed in 2022) are increasing.
This investment will deliver scoping to better define and target the strategies for biodiversity as required by the new Jersey Wildlife Law 2021.
We also have an ongoing requirement to clear invasive nonnative species such Oak Processionary Moth, Asian Hornets and Purple dew plant. If left unchecked these species can create environmental and sometimes public health problems to the island.
Health and Community Services
Minister | Minister for Health and Social Services |
Accountable Officer | Chief Officer, Health and Community Services |
Department | Health and Community Services |
Further information on services provided | |
|
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure |
|
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations 23,792 23,792 23,792 23,792 Total revenue 23,792 23,792 23,792 23,792 Expenditure
Social benefit payments 63 63 63 63 Staff costs 204,621 199,794 199,845 199,845 Other operating expenses 105,342 103,755 108,970 114,213 Grants and subsidies payments - - - - Impairments - - - - Finance costs 1 1 1 1 Total expenditure 310,027 303,613 308,879 314,122 Net revenue expenditure (near cash) 286,235 279,821 285,087 290,330 Depreciation and amortisation 4,066 4,341 4,341 4,341 Net revenue expenditure after
depreciation 290,301 284,162 289,428 294,671
Service Level Analysis
Service Level Analysis
2024 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Chief Nurse | 77 | 5,785 | 5,708 | - | 5,708 | 74.3 |
Hospital and Community Service | 22,850 | 277,104 | 254,254 | 4,066 | 258,320 | 2,479.7 |
Medical Director | 865 | 9,885 | 9,020 | - | 9,020 | 134.9 |
Improvement & Innovation | - | 17,253 | 17,253 | - | 17,253 | 25.9 |
Total | 23,792 | 310,027 | 286,235 | 4,066 | 290,301 | 2,714.8 |
Service Level Analysis
2025 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Chief Nurse | 77 | 5,785 | 5,708 | - | 5,708 | 74.3 |
Hospital and Community Service | 22,850 | 270,690 | 247,840 | 4,341 | 252,181 | 2,479.7 |
Medical Director | 865 | 9,885 | 9,020 | - | 9,020 | 134.9 |
Improvement & Innovation | - | 17,253 | 17,253 | - | 17,253 | 25.9 |
Total | 23,792 | 303,613 | 279,821 | 4,341 | 284,162 | 2,714.8 |
Service Level Analysis
2026 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Chief Nurse | 77 | 5,785 | 5,708 | - | 5,708 | 74.3 |
Hospital and Community Service | 22,850 | 275,956 | 253,106 | 4,341 | 257,447 | 2,479.7 |
Medical Director | 865 | 9,885 | 9,020 | - | 9,020 | 134.9 |
Improvement & Innovation | - | 17,253 | 17,253 | - | 17,253 | 25.9 |
Total | 23,792 | 308,879 | 285,087 | 4,341 | 289,428 | 2,714.8 |
Service Level Analysis
2027 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Chief Nurse | 77 | 5,785 | 5,708 | - | 5,708 | 74.3 |
Hospital and Community Service | 22,850 | 281,199 | 258,349 | 4,341 | 262,690 | 2,479.7 |
Medical Director | 865 | 9,885 | 9,020 | - | 9,020 | 134.9 |
Improvement & Innovation | - | 17,253 | 17,253 | - | 17,253 | 25.9 |
Total | 23,792 | 314,122 | 290,330 | 4,341 | 294,671 | 2,714.8 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate I-HCS-GP24-001 Ongoing Risks and Pressures in HCS 21,000 14,500 14,500 14,500 I-HCS-GP24-002[3] Free GP Visits for Full Time Students 75 75 75 75 Total 21,075 14,575 14,575 14,575
Summary of Revenue Growth Allocations
I-HCS-GP24-001 Ongoing Risks and Pressures in HCS
In the aftermath of the Covid-19 pandemic, the Health and Community Services department is facing a range of challenging, including financial pressures of up to £35m. This is driven by both factors in the direct control of the department, and structural factors outside of its direct control. A team to support delivery of the Financial Recovery Programme has been put in place in 2023, and a comprehensive plan is expected to be produced by the Autumn of 2023. It will also be essential to ensure that central functions are aligned to support the department in resolving some of the operational challenges. As a part of delivering the Financial Recovery Programme, this funding will be used to maintain existing healthcare services that are facing further inflationary, activity and efficiency related cost pressures. Examples of these services are mental health placements, social care packages, high-cost drugs, off-Island care, expansion beds and cancer services.
The recovery plan is identifying opportunities for improved efficiency and effectiveness of services to help reduce costs and increase income to ensure that the service can be delivered within the revised cash limits – reducing spend by £25m a year by 2025. The Council of Ministers have recognised that the delivery of these savings will take time, and it is anticipated that not all structural elements can be resolved without impacting healthcare services and patients. A further £21m has therefore been allocated to the department in 2024, reducing to £15m in 2025 onwards to maintain healthcare services.
Jersey Overseas Aid
Minister | Minister for International Development |
Accountable Officer | Executive Director, Jersey Overseas Aid |
Department | Jersey Overseas Aid |
Further information on services provided | |
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure |
|
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations - - - - Total revenue - - - - Expenditure
Social benefit payments - - - - Staff costs 710 755 777 777 Other operating expenses 353 373 387 396 Grants and subsidies payments 18,978 19,978 20,322 20,936 Impairments - - - - Finance costs - - - - Total expenditure 20,041 21,106 21,486 22,109 Net revenue expenditure (near cash) 20,041 21,106 21,486 22,109 Depreciation and amortisation - - - - Net revenue expenditure after depreciation 20,041 21,106 21,486 22,109
Service Level Analysis
Service Level Analysis
2024 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
Grants to Overseas Aid Commission - 20,041 | 20,041 | - | 20,041 | 9.2 |
Total - 20,041 | 20,041 | - | 20,041 | 9.2 |
Service Level Analysis
2025 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
Grants to Overseas Aid Commission - 21,106 | 21,106 | - | 21,106 | 9.2 |
Total - 21,106 | 21,106 | - | 21,106 | 9.2 |
Service Level Analysis
2026 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
Grants to Overseas Aid Commission - 21,486 | 21,486 | - | 21,486 | 9.2 |
Total - 21,486 | 21,486 | - | 21,486 | 9.2 |
Service Level Analysis
2027 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
Grants to Overseas Aid Commission - 22,109 | 22,109 | - | 22,109 | 9.2 |
Total - 22,109 | 22,109 | - | 22,109 | 9.2 |
Justice and Home Affairs
Minister | Minister for Justice and Home Affairs Minister for Social Security (Health and Safety Inspectorate) |
Accountable Officer | Chief Officer, Justice and Home Affairs |
Department | Justice and Home Affairs |
Further information on services provided |
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure |
|
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations 4,531 4,531 4,531 4,531 Total revenue 4,531 4,531 4,531 4,531 Expenditure
Social benefit payments - - - - Staff costs 35,774 36,382 36,431 36,481 Other operating expenses 8,514 8,144 8,101 8,095 Grants and subsidies payments 282 282 282 282 Impairments - - - - Finance costs 30 30 30 30 Total expenditure 44,600 44,838 44,844 44,888 Net revenue expenditure (near cash) 40,069 40,307 40,313 40,357 Depreciation and amortisation 1,000 1,000 1,000 1,000 Net revenue expenditure after depreciation 41,069 41,307 41,313 41,357
Service Level Analysis
Service Level Analysis
2024 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Health and Safety Inspectorate | - | 619 | 619 | - | 619 | 7.0 |
States of Jersey Ambulance Service | 16 | 6,774 | 6,758 | 73 | 6,831 | 86.0 |
States of Jersey Fire and Rescue Service | 312 | 8,986 | 8,674 | 141 | 8,815 | 88.0 |
States of Jersey Prison Service | 622 | 11,851 | 11,229 | 269 | 11,498 | 152.0 |
Jersey Field Squadron | - | 1,729 | 1,729 | - | 1,729 | 5.0 |
Jersey Customs and Immigration Service | 2,701 | 8,503 | 5,802 | 313 | 6,115 | 89.0 |
Justice and Home Affairs Directorate | 327 | 5,342 | 5,015 | 193 | 5,208 | 56.0 |
Superintendent Registrar | 553 | 796 | 243 | 11 | 254 | 11.4 |
Total | 4,531 | 44,600 | 40,069 | 1,000 | 41,069 | 494.4 |
Service Level Analysis
2025 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Health and Safety Inspectorate | - | 619 | 619 | - | 619 | 7.0 |
States of Jersey Ambulance Service | 16 | 7,122 | 7,106 | 73 | 7,179 | 86.0 |
States of Jersey Fire and Rescue Service | 312 | 9,290 | 8,978 | 141 | 9,119 | 88.0 |
States of Jersey Prison Service | 622 | 11,851 | 11,229 | 269 | 11,498 | 152.0 |
Jersey Field Squadron | - | 1,737 | 1,737 | - | 1,737 | 5.0 |
Jersey Customs and Immigration Service | 2,701 | 8,503 | 5,802 | 313 | 6,115 | 89.0 |
Justice and Home Affairs Directorate | 327 | 4,920 | 4,593 | 193 | 4,786 | 56.0 |
Superintendent Registrar | 553 | 796 | 243 | 11 | 254 | 11.4 |
Total | 4,531 | 44,838 | 40,307 | 1,000 | 41,307 | 494.4 |
Service Level Analysis
2026 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Health and Safety Inspectorate | - | 619 | 619 | - | 619 | 7.0 |
States of Jersey Ambulance Service | 16 | 7,137 | 7,121 | 73 | 7,194 | 86.0 |
States of Jersey Fire and Rescue Service | 312 | 9,285 | 8,973 | 141 | 9,114 | 88.0 |
States of Jersey Prison Service | 622 | 11,851 | 11,229 | 269 | 11,498 | 152.0 |
Jersey Field Squadron | - | 1,772 | 1,772 | - | 1,772 | 5.0 |
Jersey Customs and Immigration Service | 2,701 | 8,503 | 5,802 | 313 | 6,115 | 89.0 |
Justice and Home Affairs Directorate | 327 | 4,881 | 4,554 | 193 | 4,747 | 56.0 |
Superintendent Registrar | 553 | 796 | 243 | 11 | 254 | 11.4 |
Total | 4,531 | 44,844 | 40,313 | 1,000 | 41,313 | 494.4 |
Service Level Analysis
2027 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Health and Safety Inspectorate | - | 619 | 619 | - | 619 | 7.0 |
States of Jersey Ambulance Service | 16 | 7,160 | 7,144 | 73 | 7,217 | 86.0 |
States of Jersey Fire and Rescue Service | 312 | 9,279 | 8,967 | 141 | 9,108 | 88.0 |
States of Jersey Prison Service | 622 | 11,851 | 11,229 | 269 | 11,498 | 152.0 |
Jersey Field Squadron | - | 1,806 | 1,806 | - | 1,806 | 5.0 |
Jersey Customs and Immigration Service | 2,701 | 8,503 | 5,802 | 313 | 6,115 | 89.0 |
Justice and Home Affairs Directorate | 327 | 4,874 | 4,547 | 193 | 4,740 | 56.0 |
Superintendent Registrar | 553 | 796 | 243 | 11 | 254 | 11.4 |
Total | 4,531 | 44,888 | 40,357 | 1,000 | 41,357 | 494.4 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate I-JHA-GP24-001 Fire and Rescue Service Pay, Terms and Conditions Review 1,429 1,429 1,429 1,429 I-JHA-GP24-002 Ambulance Service – Outcome of Demand and Capacity Review 202 482 503 526 I-JHA-GP24-003 Data Management and Analyst 110 100 93 86 I-JHA-GP24-004 Fire and Rescue Service Operations 145 85 80 74 I-JHA-GP24-005 Defence Funding 108 88 123 157
Total 1,994 2,184 2,228 2,272
Summary of Revenue Growth Allocations
I-JHA-GP24-001 Fire and Rescue Service Pay, Terms and Conditions Review
The Pay, Terms and Conditions review makes provision for the increasingly demanding professional standards required of the modern service and firefighter. This review provides for increased capacity in efficiency, productivity and effectiveness with more aligned pay and benefits for on-call firefighters and dual contract holders.
The funding will maintain and further develop a service that is professional, resilient, multi-skilled and flexible. All existing Qualified Fire Fighters will be required to obtain the Institution of Fire Engineers Level 2 certificate with new Fire Fighters attaining Level 3 certificate to provide a broader talent pool for promotion and succession planning options.
The Fire and Rescue Service respond to an ever-increasing number of non-fire incidents, including public safety activity. The risk landscape is changing and becoming much more complex and challenging. This Pay, Terms and Conditions review enhances the Services ability to attract talented people to help guide the future of the profession and their services.
I-JHA-GP24-002 Ambulance Service - Outcome of Demand and Capacity Review
A full demand and capacity review has been undertaken and this case represents best value in attaining the resources needed to fulfil the outcomes of this review. This case aligns with the key priorities of the Minister for Justice and Home Affairs and will deliver the necessary improvements within the Ambulance Service to meet current demand through to 2025, in an efficient and cost-effective manner, improving response times, patient care, and patient and staff safety.
Recruitment has been phased to allow for start dates from the end of June 2024, allowing time for the recruitment process from January.
This investment will fund an uplift to enable the transfer of posts to a higher clinical level, enabling the facilitation of a fourth emergency ambulance by developing our current staff. A few additional patient transport service posts will allow for the provision of non-emergency stretcher
transfers, further freeing up the emergency ambulance service. The additional post will help facilitate the 24/7 operational command cover. The case includes an associated increase in training costs and vehicles in order to operate the necessary services safely.
I-JHA-GP24-003 Data Management and Analyst
Justice and Home Affairs (JHA), excluding the Police are one of the only Government of Jersey (GoJ) departments providing front line services, without dedicated analytical resources. This is despite being made up of multiple, lifesaving, front line services that collect vast amounts of data required to keep Jersey's population safe and secure.
Dedicated analytical resource is essential to help understand if our community is getting safer, the stories behind key trends in crime and disorder and to identify which interventions are working, which are not, and why.
JHA will use this additional resource to collaborate, standardise and improve the approach to the collection, management, and interpretation of data across JHA services.
The focus will be in three parts:
• JHA service data analysis and use for management information, risk management and delivery of key performance indicators to drive data driven decision making
• provide the data and analysis required to deliver the new Building a Safer Community Framework and support the Violence Against Women and Girls (VAWG) Taskforce
• support the ongoing review and development of Criminal Justice Policy & Legislation
I-JHA-GP24-004 Fire and Rescue Service Operations
The additional funding applied to the States of Jersey Fire and Rescue Service will assist in the alleviation of pressure on budgets for equipment, training and personal protection equipment and, as such, assist in the management of risk and in seeking to comply with both professional requirements for effectiveness but also the legal requirement to protect firefighters when undertaking inherently hazardous activities.
I-JHA-GP24-005 Defence funding
The Government of Jersey (GoJ) contributes to the UK and Crown Dependencies' Defence effort through the maintenance of the Jersey Militia in the form of an Army Reserve Squadron of Front- Line Engineers (Sappers), the Jersey Field Squadron. It is vital for the Island to contribute to the UK defence budget, and this is Jersey's contribution.
The department was awarded funding in the Government Plan 2022 however, due to unforeseen increases in costs and inflationary pressures it has meant a further bid is required.
The additional requested funding will ensure that the required Jersey Field Squadron establishment is maintained for the period of the Government Plan. It will further ensure that the good relationship between the GoJ and the MoD is sustained during a period of global insecurity and financial uncertainty.
States of Jersey Police
Minister | Minister for Justice and Home Affairs |
Accountable Officer | Chief of Police |
Department | Justice and Home Affairs |
Further information on services provided |
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure |
|
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations 162 162 162 162 Total revenue 162 162 162 162 Expenditure
Social benefit payments - - - - Staff costs 24,794 24,884 24,861 24,840 Other operating expenses 2,703 2,703 2,703 2,703 Grants and subsidies payments - - - - Impairments - - - - Finance costs - - - - Total expenditure 27,497 27,587 27,564 27,543 Net revenue expenditure (near cash) 27,335 27,425 27,402 27,381 Depreciation and amortisation 650 650 650 650 Net revenue expenditure after depreciation 27,985 28,075 28,052 28,031
Service Level Analysis
Service Level Analysis
2024 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
States of Jersey Police Service 162 27,497 | 27,335 | 650 | 27,985 | 338.0 |
Total 162 27,497 | 27,335 | 650 | 27,985 | 338.0 |
Service Level Analysis
2025 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
States of Jersey Police Service 162 27,587 | 27,425 | 650 | 28,075 | 338.0 |
Total 162 27,587 | 27,425 | 650 | 28,075 | 338.0 |
Service Level Analysis
2026 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
States of Jersey Police Service 162 27,564 | 27,402 | 650 | 28,052 | 338.0 |
Total 162 27,564 | 27,402 | 650 | 28,052 | 338.0 |
Service Level Analysis
2027 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
States of Jersey Police Service 162 27,543 | 27,381 | 650 | 28,031 | 337.0 |
Total 162 27,543 | 27,381 | 650 | 28,031 | 337.0 |
Revenue Expenditure Growth
Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate
I-POL-GP24-001 Digital Forensics Unit 237 327 304 283 Total 237 327 304 283
Summary of Revenue Growth Allocations
I-POL-GP24-001 Digital Forensics Unit
Digital forensics is a rapidly evolving branch of forensic investigation that looks to maximise the evidence recovered from devices used to commit or help commit crime. This work is carried out by Digital Forensics Unit (DFU) at the States of Jersey Police. The number of devices that people own and the volume of data that is stored on devices makes examinations complex and lengthy.
Recovering data as evidence has a legal basis under the Criminal Procedures Law which comes at a cost, and the process needs to comply with the Forensic Science Statutory Code from 2 October 2023.
The number of cases submitted to the Digital Forensics Unit has increased by over 140% since 2013. Despite the enormous increase in demand and developments in technology, the digital
forensic unit resources have remained static, which is not sustainable.
Recent events in the form of two major incidents (marine collision and Haut Du Mont explosion) brought into focus the lack of resilience and capacity within the unit.
Keeping up with demand, advances in technology, the required software licences, equipment, and technology comes with cost. The additional investment will allow the department to commence addressing the increasing demands on the DFU.
Ministry of External Relations
Minister | Minister for External Relations |
Accountable Officer | Chief Officer, Ministry of External Relations |
Department | Ministry of External Relations |
Further information on services provided |
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations 330 330 330 330 Total revenue 330 330 330 330 Expenditure
Social benefit payments - - - - Staff costs 2,056 1,964 1,964 1,964 Other operating expenses 396 396 396 396 Grants and subsidies payments 1,255 1,255 1,255 1,255 Impairments - - - - Finance costs - - - - Total expenditure 3,707 3,615 3,615 3,615 Net revenue expenditure (near cash) 3,377 3,285 3,285 3,285 Depreciation and amortisation - - - - Net revenue expenditure after depreciation 3,377 3,285 3,285 3,285
Service Analysis
Service Level Analysis
2024 Estimate £'000 Near Cash Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
External Relations 330 3,707 | 3,377 | - | 3,377 | 16.0 |
Total 330 3,707 | 3,377 | - | 3,377 | 16.0 |
Service Level Analysis
2025 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
External Relations 330 3,615 | 3,285 | - | 3,285 | 16.0 |
Total 330 3,615 | 3,285 | - | 3,285 | 16.0 |
Service Level Analysis
2026 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
External Relations 330 3,615 | 3,285 | - | 3,285 | 16.0 |
Total 330 3,615 | 3,285 | - | 3,285 | 16.0 |
Service Level Analysis
2027 Estimate Near Cash £'000 Income Expenditure | Net Revenue Expenditure | Non-Cash Depreciation | Net Revenue Expenditure | FTE Employees |
External Relations 330 3,615 | 3,285 | - | 3,285 | 16.0 |
Total 330 3,615 | 3,285 | - | 3,285 | 16.0 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate
I-MER-GP24-001 Overseas Offices 134 134 134 134 Total 134 134 134 134
Summary of Revenue Growth Allocations
I-MER-GP24-001 Overseas Offices
The overseas offices, based in London, Brussels and Caen, provide critical platforms from which Jersey's relations with key stakeholders are managed. The offices are responsible for relationship-building, horizon-scanning and lobbying to ensure the Government has sight of risks and opportunities arising on the international stage, as well as supporting a number of other GoJ departments achieve their objectives through international engagement.
In recent years the offices have come under increasing funding stress due mainly to cost of living/inflationary pressures affecting operational costs e.g. salaries, rent, rates, insurance, energy, repairs and maintenance. This position has been exacerbated by the minimal uplift applied to the grants since the offices were established (in 2013, 2011 and 2014 respectively), combined with the increased ask of the offices from across Government, particularly post Brexit. The additional part-time FTE will provide further on-island support and resilience in respect of Government's ability to expand and build-on our regional and national relations with France.
The growth funding will ensure the offices are operating on a sustainable footing and are sufficiently resourced to support deliverables and objectives as outlined in the Common Policy on External Relations.
Economic Development, Tourism, Sport and Culture
Minister | Minister for Sustainable Economic Development Minister for External Relations (Intellectual Property) |
Accountable Officer | Chief Officer, Department for the Economy |
Department | Department for the Economy |
Further information on services provided | |
|
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations - - - - Total revenue - - - - Expenditure
Social benefit payments - - - - Staff costs 5,046 5,046 5,046 5,046 Other operating expenses 3,429 3,482 3,780 4,146 Grants and subsidies payments 28,644 28,544 28,544 28,544 Impairments - - - - Finance costs - - - - Total expenditure 37,119 37,072 37,370 37,736 Net revenue expenditure (near cash) 37,119 37,072 37,370 37,736 Depreciation and amortisation - - - - Net revenue expenditure after depreciation 37,119 37,072 37,370 37,736
Service Level Analysis
Service Level Analysis
2024 Estimate |
| Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Local and Digital Economy | - | 34,448 | 34,448 | - | 34,448 | 34.0 |
Future Economy | - | 503 | 503 | - | 503 | - |
Economics | - | 1,828 | 1,828 | - | 1,828 | 9.0 |
Management and Governance | - | 40 | 40 | - | 40 | 4.5 |
Intellectual Property | - | 300 | 300 | - | 300 | - |
Total | - | 37,119 | 37,119 | - | 37,119 | 47.5 |
Service Level Analysis
2025 Estimate |
| Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Local and Digital Economy | - | 34,401 | 34,401 | - | 34,401 | 34.0 |
Future Economy | - | 503 | 503 | - | 503 | - |
Economics | - | 1,828 | 1,828 | - | 1,828 | 9.0 |
Management and Governance | - | 40 | 40 | - | 40 | 4.5 |
Intellectual Property | - | 300 | 300 | - | 300 | - |
Total | - | 37,072 | 37,072 | - | 37,072 | 47.5 |
Service Level Analysis
2026 Estimate |
| Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Local and Digital Economy | - | 34,699 | 34,699 | - | 34,699 | 34.0 |
Future Economy | - | 503 | 503 | - | 503 | - |
Economics | - | 1,828 | 1,828 | - | 1,828 | 9.0 |
Management and Governance | - | 40 | 40 | - | 40 | 4.5 |
Intellectual Property | - | 300 | 300 | - | 300 | - |
Total | - | 37,370 | 37,370 | - | 37,370 | 47.5 |
| Service Level Analysis |
|
|
|
|
|
Net Net
2027 Estimate Near Cash Revenue Non-Cash Revenue FTE £'000 Income Expenditure Expenditure Depreciation Expenditure Employees Local and Digital Economy - 35,065 35,065 - 35,065 34.0
Future Economy - 503 503 - 503 - Economics - 1,828 1,828 - 1,828 9.0 Management and Governance - 40 40 - 40 4.5 Intellectual Property - 300 300 - 300 -
Total - 37,736 37,736 - 37,736 47.5
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate
I-DFE-GP24-001 Implementation of Digital, Visitor Economy 650 650 650 650
and Elite Sport Strategies
I-DFE-GP24-002 Rural and Marine Economy 1,150 1,150 1,150 1,150 I-DFE-GP24-003 Jersey Business – Core Grant Funding 150 150 150 150 I-DFE-GP24-004 Intellectual Property Framework 300 300 300 300 I-DFE-GP24-007[4] New Growth for Agriculture and Fisheries 3,000 3,000 3,000 3,000 Total 5,250 5,250 5,250 5,250
Summary of Revenue Growth Allocations
I-DFE-GP24-001 Implementation of Digital, Visitor Economy and Elite Sport Strategies
The Future Economy vision is of a resilient, innovative, skilled, fair and international economy in which all, particularly young people in Jersey, can lead vibrant and rewarding lives on the Island. As outlined in the 2023 Ministerial Delivery Plan, the Department for the Economy will begin putting into action 3 new strategies in 2024, which all address significant areas of priority for the Island and play a key role, both directly and holistically, in delivering against the Future Economy vision. They are the Visitor Economy Strategy, the Digital Economy Strategyand the Sport – Elite Performance Strategy. This funding will allow the implementation of the short/medium-term and highest priority initiatives identified through these strategies and enable work to begin in delivering against the desired outcomes.
I-DFE-GP24-002 Rural and Marine Economy
The investment will enable delivery of the essential components of the Economic Framework for the Rural Environment and the Economic Framework for the Marine Environment, in line with Minister's priority "Implementing the Rural and Marine Economic Frameworks. We will deliver increased support in the marine and agriculture sectors." The investment will enable an increase to the budget for the Rural Support Scheme and establish budget for the Marine Support Scheme, providing grant payments to rural and marine enterprises which underpin environmental, landscape and marine management, stimulate economic diversity and growth, enable social
inclusion, and contribute to the Island's food resilience.
I-DFE-GP24-003 Jersey Business – Core Grant Funding
Jersey Business play a fundamental role in delivering the Future Economy vision through their work with the local business community, especially small and medium size enterprises, which make up 94% of all undertakings in Jersey.As the Arms-Length Organisation responsible for providing direct support to Jersey companies, they are vital in helping Jersey's economy to stabilise and grow over the period 2024-27 and beyond, following the sustained economic shocks of Covid, Brexit, the Ukraine conflict, the cost-of-living crisis and ongoing recruitment pressures in the Island.Tackling the legacy economic issues that have been highlighted and brought to the fore such as low productivity, workplace skills and financial literacy and resilience are a key aspect of Jersey Business' activity. This investment will increase the base grant to Jersey Business Limited, to ensure they can continue to be able to support the CSP 2023-2026 priority to: "Develop a more sustainable, innovative, outward-facing and prosperous economy".
I-DFE-GP24-004 Intellectual Property Framework
The growth funding allows for a new Intellectual Property framework to be enacted on the island. Within the next 18 months a new framework needs to be delivered to ensure that the island is compliant with Free Trade Agreements, as agreed with the UK government. The work requires significant legal work, including new legislation and will also require a new administration process. In addition to making Jersey compliant with future Free Trade Agreements (FTA), there are also possible future benefits from registrations that could create revenue streams, as well as opportunities to promote and protect innovation on the island. Whilst the work for this sits under the Department for the Economy, this growth line maps to the Minster for External relations, in terms of political accountability.
Financial Services
Minister | Chief Minister |
Accountable Officer | Chief Officer, Department for the Economy |
Department | Department for the Economy |
Further information on services provided | |
|
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations - - - - Total revenue - - - - Expenditure
Social benefit payments - - - - Staff costs 4,140 4,149 4,104 4,079 Other operating expenses 609 609 609 609 Grants and subsidies payments 6,466 6,466 6,466 6,466 Impairments - - - - Finance costs - - - - Total expenditure 11,215 11,224 11,179 11,154 Net revenue expenditure (near cash) 11,215 11,224 11,179 11,154 Depreciation and amortisation - - - - Net revenue expenditure after depreciation 11,215 11,224 11,179 11,154
Service Level Analysis
Service Level Analysis
2024 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Financial Services | - | 7,493 | 7,493 | - | 7,493 | 6.0 |
Financial Crime | - | 1,232 | 1,232 | - | 1,232 | 40.0 |
Financial Intelligence Unit | - | 2,490 | 2,490 | - | 2,490 | - |
Total | - | 11,215 | 11,215 | - | 11,215 | 46.0 |
Service Level Analysis
2025 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Financial Services | - | 7,493 | 7,493 | - | 7,493 | 6.0 |
Financial Crime | - | 1,232 | 1,232 | - | 1,232 | 40.0 |
Financial Intelligence Unit | - | 2,499 | 2,499 | - | 2,499 | - |
Total | - | 11,224 | 11,224 | - | 11,224 | 46.0 |
Service Level Analysis
2026 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Financial Services | - | 7,493 | 7,493 | - | 7,493 | 6.0 |
Financial Crime | - | 1,232 | 1,232 | - | 1,232 | 40.0 |
Financial Intelligence Unit | - | 2,454 | 2,454 | - | 2,454 | - |
Total | - | 11,179 | 11,179 | - | 11,179 | 46.0 |
Service Level Analysis
2027 Estimate |
| Near-Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Financial Services | - | 7,493 | 7,493 | - | 7,493 | 6.0 |
Financial Crime | - | 1,232 | 1,232 | - | 1,232 | 40.0 |
Financial Intelligence Unit | - | 2,429 | 2,429 | - | 2,429 | - |
Total | - | 11,154 | 11,154 | - | 11,154 | 46.0 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate
I-DFE-GP24-005 Financial Intelligence Unit (FIU) 746 755 710 685 I-DFE-GP24-006 Jersey Finance – Additional Grant Funding 750 750 750 750 Total 1,496 1,505 1,460 1,435
Summary of Revenue Growth Allocations
I-DFE-GP24-005 Financial Intelligence Unit (FIU)
In line with the Minister's priority, additional investment and expansion of the FIU is required to support its ongoing transformation to be appropriately scaled, resourced and supported to enable delivery of the necessary, additional and beneficial intelligence insight, on financial crime threats, as they impact Jersey both domestically and internationally.
This allocation is intended to provide a longer-term funding model to deliver a professional, capable and technology supported capability and is underpinned by the requirements from international standard setter (the Financial Action Task Force) on countering money laundering, terrorist financing and proliferation financing risks.
I-DFE-GP24-006 Jersey Finance – Additional Grant Funding
The growth funding for Jersey Finance Limited aims to secure the prosperity of Jersey's financial and related professional services. This will enable Jersey Finance to maintain current levels of activity in addition to continuing to build on the recently enhanced presence in key markets such as the Middle East and Africa. Additionally, this funding will enable further work on both Fintech and Sustainable Finance, identified as high priority areas for the industry.
Treasury and Exchequer
Minister | Minister for Treasury and Resources Chief Minister (see table 4 Ministerial mapping) |
Accountable Officer | Treasurer of the States and Chief Officer, Treasury and Exchequer |
Department | Treasury and Exchequer |
Further information on services provided | |
|
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations 4,189 4,189 4,189 4,189 Total revenue 4,189 4,189 4,189 4,189 Expenditure
Social benefit payments 114,921 128,108 128,598 129,779 Staff costs 30,699 31,207 31,207 31,207 Other operating expenses 17,268 17,238 16,308 16,308 Grants and subsidies payments - - - - Impairments 5 5 5 5 Finance costs 884 914 944 944 Total expenditure 163,777 177,472 177,062 178,243 Net revenue expenditure (near cash) 159,588 173,283 172,873 174,054 Depreciation and amortisation 1,400 1,540 1,540 1,540 Net revenue expenditure after depreciation 160,988 174,823 174,413 175,594
Service Level Analysis
Service Level Analysis
2024 Estimate |
| Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Finance Business Partners, Analytics & Management Information Finance Hub | 196 2,346 | 4,639 5,358 | 4,443 3,012 | - - | 4,443 3,012 | 70.0 65.5 |
Revenue Jersey Assurance and Risk | 214 41 | 13,206 2,917 | 12,992 2,876 | 1,400 - | 14,392 2,876 | 169.0 25.0 |
Strategic Finance Treasury and Investment Management Commercial Services | 35 1,182 175 | 3,454 14,430 3,788 | 3,419 13,248 3,613 | - - - | 3,419 13,248 3,613 | 32.3 16.0 44.0 |
Grants to Funds Corporate Costs | - - | 114,921 1,064 | 114,921 1,064 | - - | 114,921 1,064 | - - |
Total | 4,189 | 163,777 | 159,588 | 1,400 | 160,988 | 421.8 |
Service Level Analysis
2025 Estimate |
| Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Finance Business Partners, Analytics & Management Information Finance Hub | 196 2,346 | 4,639 5,358 | 4,443 3,012 | - - | 4,443 3,012 | 70.0 65.5 |
Revenue Jersey | 214 | 13,640 | 13,426 | 1,540 | 14,966 | 169.0 |
Assurance and Risk Strategic Finance Treasury and Investment Management Commercial Services | 41 35 1,182 175 | 2,917 3,454 14,474 3,788 | 2,876 3,419 13,292 3,613 | - - - - | 2,876 3,419 13,292 3,613 | 25.0 32.3 16.0 44.0 |
Grants to Funds | - | 128,108 | 128,108 | - | 128,108 | - |
Corporate Costs | - | 1,094 | 1,094 | - | 1,094 | - |
Total | 4,189 | 177,472 | 173,283 | 1,540 | 174,823 | 421.8 |
Service Level Analysis
2026 Estimate |
| Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Finance Business Partners, Analytics & Management Information | 196 | 4,639 | 4,443 | - | 4,443 | 70.0 |
Finance Hub | 2,346 | 5,358 | 3,012 | - | 3,012 | 65.5 |
Revenue Jersey | 214 | 13,640 | 13,426 | 1,540 | 14,966 | 164.0 |
Assurance and Risk | 41 | 2,917 | 2,876 | - | 2,876 | 25.0 |
Strategic Finance | 35 | 3,454 | 3,419 | - | 3,419 | 32.3 |
Treasury and Investment Management | 1,182 | 13,544 | 12,362 | - | 12,362 | 16.0 |
Commercial Services | 175 | 3,788 | 3,613 | - | 3,613 | 44.0 |
Grants to Funds | - | 128,598 | 128,598 | - | 128,598 | - |
Corporate Costs | - | 1,124 | 1,124 | - | 1,124 | - |
Total | 4,189 | 177,062 | 172,873 | 1,540 | 174,413 | 416.8 |
Service Level Analysis
2027 Estimate |
| Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE |
£'000 | Income | Expenditure | Expenditure | Depreciation | Expenditure | Employees |
Finance Business Partners, Analytics & Management Information | 196 | 4,639 | 4,443 | - | 4,443 | 70.0 |
Finance Hub | 2,346 | 5,358 | 3,012 | - | 3,012 | 65.5 |
Revenue Jersey | 214 | 13,640 | 13,426 | 1,540 | 14,966 | 164.0 |
Assurance and Risk | 41 | 2,917 | 2,876 | - | 2,876 | 25.0 |
Strategic Finance | 35 | 3,454 | 3,419 | - | 3,419 | 32.3 |
Treasury and Investment Management | 1,182 | 13,544 | 12,362 | - | 12,362 | 16.0 |
Commercial Services | 175 | 3,788 | 3,613 | - | 3,613 | 44.0 |
Grants to Funds | - | 129,779 | 129,779 | - | 129,779 | - |
Corporate Costs | - | 1,124 | 1,124 | - | 1,124 | - |
Total | 4,189 | 178,243 | 174,054 | 1,540 | 175,594 | 416.8 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate I-T&E-GP24-001 Insurance Premiums 4,300 4,300 4,300 4,300 I-T&E-GP24-002 Tax Compliance and Customer Service 1,676 2,176 2,176 2,176
Total 5,976 6,476 6,476 6,476
Summary of Revenue Growth Allocations
I-T&E-GP24-001 Insurance Premiums
The Government's insurance costs (premiums) continue to increase at a rate that is substantially above inflation as a result of increasing claims costs and a general reduction in risk appetite across the industry. This investment in insurance costs is intended to meet the burden of these additional costs. As referenced, in the Government Plan 2023-26, a strategic review of the Government's risk and insurance strategy has now been completed. As the recommendations are implemented over the coming years it is expected that the Government's insurance costs will stabilise allowing for greater financial certainty over the longer term.
I-T&E-GP24-002 Tax Compliance and Customer Service
Revenue Jersey is responsible for the collection of over 80% of all States' revenues, totalling in excess of £1 billion per annum. This money is used to fund the services provided by the States.
The work undertaken by Revenue Jersey is aimed at optimising tax collection while ensuring fairness and efficiency in our tax system. This funding will be used to enhance the tax compliance team and also fund initiatives aimed at streamlining the tax process, making it easier for Islanders to meet their tax obligations, while maintaining suitable levels of customer service and operational standards across the section. This will also include retaining positions that have demonstrated their value in delivering efficient tax services while minimising cost of operations.
This investment is projected to have a positive impact on Government revenue and based on our experience to date, we anticipate that this initiative will contribute to increasing Government income by at least £16m each year. This additional revenue will help fund essential public services without the need for raising taxes.
Finally, this investment strikes a balance between improving tax compliance and ensuring efficient operational standard. It is an investment that benefits both the Government and Islanders, ensuring a fair and efficient tax system while safeguarding financial stability.
Non-Ministerial Departments
Head of Expenditure | Accountable Officer | Further information on services provided |
Bailiff 's Chambers | Chief Officer, Bailiff 's Chambers | |
| ||
Law Officers' Department | Practice Director, Law Officers Department | |
| ||
Judicial Greffe | Judicial Greffier | |
| ||
Viscount's Department | Viscount | |
| ||
Official Analyst | Official Analyst | |
Office of the Lieutenant Governor | Chief of Staff and Private Secretary | |
| ||
Probation | Chief Probation Officer | |
Comptroller and Auditor General | Comptroller and Auditor General | |
|
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure |
|
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey 370 370 370 370 Earned through operations 3,161 3,121 3,123 3,123 Total revenue 3,531 3,491 3,493 3,493 Expenditure
Social benefit payments - - - - Staff costs 24,228 24,352 24,373 24,373 Other operating expenses 12,302 12,302 12,077 12,155 Grants and subsidies payments 90 90 90 90 Impairments - - - - Finance costs 15 15 15 15 Total expenditure 36,635 36,759 36,555 36,633 Net revenue expenditure (near cash) 33,104 33,268 33,062 33,140 Depreciation and amortisation 85 165 165 165 Net revenue expenditure after depreciation 33,189 33,433 33,227 33,305
Service Level Analysis
Service Level Analysis
2024 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Bailiff 's Chambers |
|
|
|
|
|
|
Bailiff 's Chambers General | 68 | 2,970 | 2,902 | - | 2,902 | 16.3 |
Court and Case Costs Law Officers' Department | - | 306 | 306 | - | 306 | - |
Law Officers' General | 127 | 11,897 | 11,770 | - | 11,770 | 101.7 |
Court and Case Costs Judicial Greffe | - | 1,111 | 1,111 | - | 1,111 | - |
Judicial Greffe - General | 2,094 | 5,422 | 3,328 | - | 3,328 | 53.1 |
Court and Case Costs Viscount's Department | - | 5,531 | 5,531 | - | 5,531 | - |
Duties of the Viscount | 882 | 3,049 | 2,167 | 24 | 2,191 | 32.8 |
Court & Case Costs | - | 246 | 246 | - | 246 | - |
Official Analyst | 53 | 788 | 735 | 61 | 796 | 7.7 |
Office of the Lieutenant Governor Probation | 132 | 1,037 | 905 | - | 905 | 13.3 |
Probation and Aftercare Service | 78 | 2,923 | 2,845 | - | 2,845 | 33.7 |
Court and Case Costs | - | 106 | 106 | - | 106 | 1.0 |
Comptroller & Auditor General | 97 | 1,249 | 1,152 | - | 1,152 | - |
Total | 3,531 | 36,635 | 33,104 | 85 | 33,189 | 259.6 |
Service Level Analysis
2025 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Bailiff 's Chambers |
|
|
|
|
|
|
Bailiff 's Chambers General | 68 | 3,170 | 3,102 | - | 3,102 | 16.3 |
Court and Case Costs Law Officers' Department | - | 306 | 306 | - | 306 | - |
Law Officers' General | 127 | 11,958 | 11,831 | - | 11,831 | 101.7 |
Court and Case Costs Judicial Greffe | - | 1,111 | 1,111 | - | 1,111 | - |
Judicial Greffe - General | 2,094 | 5,416 | 3,322 | - | 3,322 | 53.1 |
Court and Case Costs Viscount's Department | - | 5,531 | 5,531 | - | 5,531 | - |
Duties of the Viscount | 882 | 2,979 | 2,097 | 24 | 2,121 | 32.8 |
Court & Case Costs | - | 246 | 246 | - | 246 | - |
Official Analyst | 53 | 791 | 738 | 61 | 799 | 7.7 |
Office of the Lieutenant Governor Probation | 132 | 1,037 | 905 | - | 905 | 13.3 |
Probation and Aftercare Service | 34 | 2,811 | 2,777 | 80 | 2,857 | 33.7 |
Court and Case Costs | - | 106 | 106 | - | 106 | 1.0 |
Comptroller & Auditor General | 101 | 1,297 | 1,196 | - | 1,196 | - |
Total | 3,491 | 36,759 | 33,268 | 165 | 33,433 | 259.6 |
Service Level Analysis
2026 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Bailiff 's Chambers |
|
|
|
|
|
|
Bailiff 's Chambers General | 68 | 2,970 | 2,902 | - | 2,902 | 16.3 |
Court and Case Costs Law Officers' Department | - | 306 | 306 | - | 306 | - |
Law Officers' General | 127 | 11,958 | 11,831 | - | 11,831 | 101.7 |
Court and Case Costs Judicial Greffe | - | 1,111 | 1,111 | - | 1,111 | - |
Judicial Greffe - General | 2,094 | 5,416 | 3,322 | - | 3,322 | 53.1 |
Court and Case Costs Viscount's Department | - | 5,531 | 5,531 | - | 5,531 | - |
Duties of the Viscount | 882 | 2,979 | 2,097 | 24 | 2,121 | 32.8 |
Court & Case Costs | - | 246 | 246 | - | 246 | - |
Official Analyst | 53 | 794 | 741 | 61 | 802 | 7.7 |
Office of the Lieutenant Governor Probation | 132 | 1,037 | 905 | - | 905 | 13.3 |
Probation and Aftercare Service | 34 | 2,811 | 2,777 | 80 | 2,857 | 33.7 |
Court and Case Costs | - | 106 | 106 | - | 106 | 1.0 |
Comptroller & Auditor General | 103 | 1,290 | 1,187 | - | 1,187 | - |
Total | 3,493 | 36,555 | 33,062 | 165 | 33,227 | 259.6 |
Service Level Analysis
2027 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | |
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | |
Bailiff 's Chambers |
|
|
|
|
|
|
Bailiff 's Chambers General | 68 | 2,970 | 2,902 | - | 2,902 | 16.3 |
Court and Case Costs Law Officers' Department | - | 306 | 306 | - - | 306 | - |
Law Officers' General | 127 | 11,958 | 11,831 | - | 11,831 | 101.7 |
Court and Case Costs Judicial Greffe | - | 1,111 | 1,111 | - - | 1,111 | - |
Judicial Greffe - General | 2,094 | 5,416 | 3,322 | - | 3,322 | 53.1 |
Court and Case Costs Viscount's Department | - | 5,531 | 5,531 | - - | 5,531 | - |
Duties of the Viscount | 882 | 2,979 | 2,097 | 24 | 2,121 | 32.8 |
Court & Case Costs | - | 246 | 246 | - | 246 | - |
Official Analyst | 53 | 844 | 791 | 61 | 852 | 7.7 |
Office of the Lieutenant Governor Probation | 132 | 1,037 | 905 | - | 905 | 13.3 |
Probation and Aftercare Service | 34 | 2,811 | 2,777 | 80 | 2,857 | 33.7 |
Court and Case Costs | - | 106 | 106 | - | 106 | 1.0 |
Comptroller & Auditor General | 103 | 1,318 | 1,215 | - | 1,215 | - |
Total | 3,493 | 36,633 | 33,140 | 165 | 33,305 | 259.6 |
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate
Comptroller and Auditor General
I-C&AG-GP24-001 C&AG Recruitment Costs and Inflation Pressures 30 40 - 28
Judicial Greffe
I-JG-GP24-001 JG Staff 194 188 188 188
Law Officers' Department
I-LOD-GP24-001 LOD - Civil Division 205 205 205 205 I-LOD-GP24-002 LOD - Criminal Courts Team 77 92 92 92 I-LOD-GP24-003 LOD - Moneyval 620 666 666 666
Official Analyst
I-OAN-GP24-001 Replacement HPLC Analyser - - - 50
Probation
I-PRO-GP24-001 Independent (HMIP) Inspection of the Jersey Probation Service 68 - - -
Viscount's Department
I-VID-GP24-001 Additional Staff Resource and Refurbishment 125 55 55 55 Total 1,319 1,246 1,206 1,284
Summary of Revenue Growth Allocations
I-C&AG-GP24-001 C&AG Recruitment Costs and Inflation Pressures
The investment requirements in 2024 and 2025 represent one-off unavoidable events within the current Government Plan 2024-27 cycle that will require additional funding:
• recruitment of two new Board members when current terms of office expire, to commence during the latter part of 2024 so members are in place to take Office in March 2025.
• recruitment of a new Comptroller and Auditor General, to commence during the latter part of 2025 so a new Comptroller and Auditor General is in place when the current term ends on 31 December 2026.
The estimated investment requirement for 2027 is based on the position for 2026 making a prudent allowance for the impact of UK and Jersey inflation taking into account the forecasts of HM Treasury, the Office of Budget Responsibility and the Fiscal Policy Panel to reflect the contractual nature of over 95% of the Jersey Audit Office spend.
I-JG-GP24-001 JG Staff
The Judicial Greffe's primary function is to support the delivery of, and access to, justice in Jersey. It is responsible for the provision of judicial, secretarial, administrative, and interlocutory support for the Island's Courts and Tribunals including the Court of Appeal, the Royal Court, the Magistrates Court the Petty Depts Court and seven Tribunals. The Department also supports a variety of areas of judicial work including intellectual property registrations, land registration and wills.
This investment sets out what is required to ensure the continued effective delivery of justice considering a growing workload and legislative and structural changes. It will allow for the continued effective running of the Court Service and will enhance the delivery of justice in Jersey. The outcomes will maintain access to justice, support families and children and improve the effectiveness of the Court infrastructure to meet Jersey's social and economic needs and maintain Island's international reputation.
Funding is sought to recruit a Family Court Manager to address the growing workload in the Family Court, reduce the reliance on temporary staff and support succession planning and business continuity, and recruit one Operations and Business Manager to be shared between the Judicial Greffe, the Viscount's Department and the Bailiff 's Chambers to focus on all aspects of operations and business management, help the departments meet regulatory standards including Health and Safety and will enhance the smooth running of the courts.
I-LOD-GP24-001 LOD – Civil Division
This investment supports the LOD Business Plan key objective: to provide legal advice to the Government, States Assembly and the Crown.
A Legal Adviser was recruited on a two-year fixed term contract in GP22, funded by Justice and Home Affairs, in order to advise on immigration matters post-Brexit. Immigration work has intensified and has not reduced post-Brexit and the role is now required on a permanent basis. An additional conveyancer was added to the small Conveyancing team in August 2022 at the request of Jersey Property Holdings (JPH) to cover increased workload, funded on a fixed term basis for one year by JPH. The workload of the Conveyancing team remains high and shows no signs of diminishing, with an increasing number of instructions from I&E Operations for drainage work across the Island, an increase in Environmental Protection and Planning Compliance matters, and an increase in work for the Receiver General. This growth bid is supported by JPH who funded the 18-month Fixed Term post.
I-LOD-GP24-002 LOD – Criminal Courts Team
This investment supports the LOD Business Plan key objective: to provide an independent prosecution service for the Island.
The Criminal Courts team prosecutes cases before the Magistrate's and Youth Courts, the Royal Court and Court of Appeal (Criminal Division), and gives advice to the States of Jersey Police, the Honorary Police, Customs, and numerous Government regulatory Departments.
There has been a sustained increase in the number of new cases for the Royal Court and Magistrate's Court with additional work created by the prosecution of JFSC registry, data protection breaches, new Practice Directions increasing administration and the ability to cope with spikes in demand such as Operations Spire and Nectar.
The request is for two additional paralegal posts, the entry level to the Legal Adviser pay scale, in order that Criminal Courts team Legal Advisers can work more efficiently, spend more time in case preparation and in court and maintain the reputation and quality required of the Island's prosecution service.
I-LOD-GP24-003 LOD – Moneyval
This investment supports the LOD Business Plan key objectives; to provide an independent prosecution service for the Island, enable the forfeiture and confiscation of the proceeds of crime and assist overseas law enforcement agencies.
In order to maintain its reputation as a well-regulated international finance centre Jersey must be able to demonstrate that it investigates and prosecutes financial crime.
The Law Officers' Department's Economic Confiscation Unit (ECCU) and Mutual Legal Assistance (MLA) teams need further resources in order to accelerate the prosecution of financial crime and demonstrate to Moneyval that the Island has the capacity to do so.
This investment adds an additional legal adviser and civilian investigator to ECCU, makes permanent the three existing posts of Detective Investigator, Detective Sergeant and Detective Constable (or equivalent Civilian roles) within ECCU and adds two legal advisers to the Mutual Legal Assistance team.
The additional resources will allow a greater number of financial crime cases to be investigated, increase the speed at which current cases are investigated and enable more efficient cooperation with overseas jurisdictions.
The ECCU and MLA teams also recover substantial costs for the Island, such as the first major confiscation under the 2018 Forfeiture of Assets (Civil Proceedings) Law resulting in $10m paid into the COCF in 2019, and the Doraville case in 2020 which resulted in $5m for the Island. Other substantial cases are currently under investigation.
I-OAN -GP24-001 Replacement HPLC Analyser
Analysis of suspected drug containing items and the forensic confirmation of identity and purity are essential evidence used in prosecuting individuals for offences under the Misuse of Drugs (Jersey) Law, 1978. Provision of such services in relation to law and order is a function of the Official Analyst as required by Official Analyst (Jersey) Law 2022.
This investment is to replace existing equipment that is expected to be at the end of its working life by 2027. High Pressure Liquid Chromatograph (HPLC) equipment is used to identify and quantify the purity of drugs such as cocaine, amphetamine and heroin present in exhibits submitted by Police and Customs officers. The results are required within the Criminal Justice process as evidence in prosecutions in the Courts. Existing equipment is at the end of its working life and is no longer supported by the manufacturer. Inability to provide this analysis would hamper the ability of Law Officers to bring prosecutions to Court.
I-PRO-GP24-001 Independent (HMIP) Inspection of the Jersey Probation Service
The Probation Service is a department of the Royal Court that provides assessments for the courts and supervision services for offenders within the community and custody. Its work also extends to working with children in the court system and those who have been sanctioned via the Parish Hall Enquiry system.
The Probation Service wishes to be inspected by an external inspectorate to ensure transparency and provide assurance and recommendations about the quality of the Probation Service. As a key agency in the island's criminal justice system, it is important that the work of
the Service is inspected to receive assurances it is effective, efficient and provides value for money. Apart from examining strategic and operational context an inspection can also provide the public and other stakeholders with assurance that the Service is committed to transparency and remains open to develop practice.
The inspection, originally planned in 2023, was delayed due to key resource issues and it is therefore requested the investment is carried over to 2024.
I-VID-GP24-001 Additional Staff Resource and Refurbishment
The Viscount's Department supports the Viscount and Deputy Viscount in carrying out their functions and activities including enforcement of court orders such as seizure of assets, property restraint orders, enforcing asset freezing (or saisie) and confiscation orders and holding third party assets on the orders of the Royal Court. Other general enforcement duties include serving summonses and other legal documents on members of the public, making wage arrests, executing evictions.
The Viscount's Department has been facing unprecedented challenges including:
• Conducting essential digital projects to improve the efficiency of the department and manage highly sensitive data.
• A growing and increasingly complex case load.
• A lack of resilience and resource across the department as staff are managing essential and time critical projects and taking on greater responsibilities as well as business as usual.
• Training and succession planning in specialist areas.
The Viscount's Department has no dedicated administrative or business support and a small Finance team who also act as reception. The increased workload is putting additional pressure on the finance team and has revealed the need for business support particularly across the Court Services Team and the Finance Team.
This investment will recruit a Business Support Officer to offer business support to the department, particularly the Court Services Team and the Finance Team, to address rising workloads and improve the efficiency of the department. It will also provide one off refurbishment to provide sufficient space for the current headcount and the additional post requested.
States Assembly
Head of Expenditure | Accountable Officer | Further information on services provided |
States Assembly | Greffier of the States | |
|
Statement of Comprehensive Net Expenditure
Statement of Comprehensive Net Expenditure
2024 2025 2026 2027 £'000 Estimate Estimate Estimate Estimate Revenue
Levied by the States of Jersey - - - - Earned through operations - - - - Total revenue - - - - Expenditure
Social benefit payments - - - - Staff costs 8,455 8,459 8,459 8,459 Other operating expenses 1,449 1,348 1,348 1,348 Grants and subsidies payments - - - - Impairments - - - - Finance costs - - - -
Total expenditure | 9,904 | 9,807 | 9,807 | 9,807 |
Net revenue expenditure (near cash) | 9,904 | 9,807 | 9,807 | 9,807 |
Depreciation and amortisation | - | - | - | - |
Net revenue expenditure after depreciation | 9,904 | 9,807 | 9,807 | 9,807 |
Service Level Analysis
Service Level Analysis
2024 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | ||||||
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | ||||||
States Assembly General | - | 3,366 | 3,366 | - | 3,366 | 3.0 | |||||
Committees and Panels | - | 2,131 | 2,131 | - | 2,131 | 23.0 | |||||
Members' Services and Renumeration | - | 1,841 | 1,841 | - | 1,841 | 19.0 | |||||
Law Drafting | - | 1,742 824 | 1,742 | - - | 1,742 | 12.0 10.0 | |||||
Digital and Public Engagement |
| 824 |
| 824 |
| ||||||
Total | - | 9,904 | 9,904 | - | 9,904 | 67.0 | |||||
Service Level Analysis
2025 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | ||||||
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | ||||||
States Assembly General | - | 3,377 | 3,377 | - | 3,377 | 3.0 | |||||
Committees and Panels | - | 2,131 | 2,131 | - | 2,131 | 23.0 | |||||
Members' Services and Renumeration | - | 1,841 | 1,841 | - | 1,841 | 19.0 | |||||
Law Drafting | - | 1,634 824 | 1,634 | - - | 1,634 | 12.0 10.0 | |||||
Digital and Public Engagement |
| 824 |
| 824 |
| ||||||
Total | - | 9,807 | 9,807 | - | 9,807 | 67.0 | |||||
Service Level Analysis
2026 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | ||||||
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | ||||||
States Assembly General | - | 3,377 | 3,377 | - | 3,377 | 3.0 | |||||
Committees and Panels | - | 2,131 | 2,131 | - | 2,131 | 23.0 | |||||
Members' Services and Renumeration | - | 1,841 | 1,841 | - | 1,841 | 19.0 | |||||
Law Drafting | - | 1,634 824 | 1,634 | - - | 1,634 | 12.0 10.0 | |||||
Digital and Public Engagement |
| 824 |
| 824 |
| ||||||
Total | - | 9,807 | 9,807 | - | 9,807 | 67.0 | |||||
Service Level Analysis
2027 Estimate | Near Cash | Net Revenue | Non-Cash | Net Revenue | FTE | ||||||
£'000 | Income Expenditure | Expenditure | Depreciation | Expenditure | Employees | ||||||
States Assembly General | - | 3,377 | 3,377 | - | 3,377 | 3.0 | |||||
Committees and Panels | - | 2,131 | 2,131 | - | 2,131 | 23.0 | |||||
Members' Services and Renumeration | - | 1,841 | 1,841 | - | 1,841 | 19.0 | |||||
Law Drafting | - | 1,634 824 | 1,634 | - - | 1,634 | 12.0 10.0 | |||||
Digital and Public Engagement |
| 824 |
| 824 |
| ||||||
Total | - | 9,807 | 9,807 | - | 9,807 | 67.0 | |||||
Revenue Expenditure Growth
Revenue Expenditure Growth
£'000 2024 2025 2026 2027 Reference Description Estimate Estimate Estimate Estimate
I-STA-GP24-001 Secretariat support capacity 292 292 292 292 I-STA-GP24-002 Legislative Drafting Office 180 172 172 172 I-STA-GP24-003 States Members' Constituency Work 344 344 344 344 I-STA-GP24-004 Creative Content Producer 26 26 26 26 Total 842 834 834 834
Summary of Revenue Growth Allocations
I-STA-GP24-001 Secretariat support capacity
This investment would enable the Secretariat team at the States Greffe to provide its increasingly demanded specialist impartial minutes service to a more appropriate number of high-profile and reputationally critical Government and States-appointed bodies. Demand for the team's services from the Government of Jersey continues to outstrip the capacity of the team, compromising essential good governance.
Prioritisation of service provision is based on several qualifying criteria', chief amongst which is the influence of any statutory obligation, such as in the case of the Council of Ministers (States of Jersey Law 2005). Also considered is the scale of Ministerial involvement and/or political sensitivity of the body in question and the technical nature of the material under consideration. Despite this relatively narrow focus, legitimate demand for service provision continues to grow and is expected to be sustained in the long term well above the team's current capacity.
The investment would be used to provide additional staff resources, improve service resilience, and enable a more flexible approach to the output of the team to help ensure a value for money approach.
I-STA-GP24-002 Legislative Drafting Office
The Legislative Drafting Office functions to serve Jersey's law drafting needs and therefore needs always to be staffed at a level that enables the strategic aims of Government, insofar as they require legislation, to be met.
The Infrastructure and Environment Department (I&E) have requested on-going use of a drafter from the beginning of 2024 to work on Roads and Traffic legislation. This investment will allow the Legislative Drafting Office to supplement £50,000 consultancy budget and appoint a full time legislative drafter. The drafter will be responsible for a range of business-as-usual drafting, enabling the Government Legislative Programme to be delivered as required by the Council of Ministers to achieve its objectives and support the additional need from I&E, to be delivered more efficiently and at less cost than procuring consultant time.
In addition, the Legislative Drafting Office would like to remove the need to rely on a recharge element of up to £65,000 per annum, historically provided from the Economy Department for financial services related drafting and ensure funds for Legislative Drafters are properly secured in the States Greffe's Head of Expenditure from 2024.
I-STA-GP24-003 States Members' Constituency Work
The investment would improve the support provided to elected States Members (Members) in undertaking their constituency work, assisting Islanders with specific issues and challenges, and enabling Members to work more efficiently and effectively, resulting in better outcomes for their constituents and the wider community.
Specifically, the investment would enable the:
• Setting-up of a dedicated constituency team within the States Greffe, whose purpose would be to assist Members with constituency case work and research, constituency surgeries, diary and inbox management, liaison between Members, constituents and Government, and communication/social media activities.
• Creation of a constituency fund, managed by the States Greffe, available for Members to support their constituency work (e.g., preparation, product and delivery of a constituency newsletter, venue hire, communication/social media expenses).
This investment is aligned to the States Greffe's overarching objective To enable democracy to flourish by supporting and promoting the States Assembly and engaging people in politics'.
I-STA-GP24-004 Creative Content Producer
The States Greffe established the Digital and Public Engagement Team in July 2020 with the mission To deliver timely, insight led, campaigns, programmes and information that help local residents to understand and engage with Jersey's political system.'
There are various objectives and KPIs to measure progress towards achieving this mission, all detailed in the four-year Digital and Public Engagement Strategy. Several of these have been achieved or are in progress since its launch in January 2021. However, voter turnout is a key measure of engagement and with 42% of Islanders voting in the 2022 election, Jersey currently ranks the lowest of all OECD (The Organisation for Economic Co-operation and Development) countries.
This investment will allow for the Creative Content Producer to move from part time to full time role further contributing towards achieving the various objectives of the Digital and Public Engagement section of the States Greffe and reducing reliance on creative agencies and freelancers to create professional standard graphic design, photography, videography and animations.
APPENDICIES
Appendix 1: Government Plan Amendments
On 14December 2023 the States Assembly approved the Government Plan 2024-2027 as amended.
The following amendments were approved by the States Assembly and are reflected, where necessary, in the information in this document.
• Amendment 1 (Social security grant)
• Amendment 5 (Right-sizing scheme)
• Amendment 6 (as amended) (Medical hosiery & dressing fund)
• Amendment 12 (as amended) (Value for money savings)
• Amendment 13 (Violence against women and girls taskforce)
• Amendment 15 (as amended) (Income support for children with life threatening conditions)
• Amendment 16 (Pension Changes)
• Amendment 18 (Free GP visits to full time students)
• Amendment 21 (Le Rocquier School and community sports facilities)
• Amendment 22 (as amended) (Abolitions of interest tax relief for landlords)
• Amendment 24 (Expanding early years nursery provisions for childcare support)
• Amendment 25 (as amended) (Freezing alcohol duty)
• Amendment 26 (Freezing fuel duty)
• Amendment 30 (as amended) (Freeze on Public Health staff appointments)
• Amendment 32 (Tax on private aircraft)
• Amendment 33 (as amended) (Agriculture & fisheries)
CBP001149
Designed and produced by the Government of Jersey Communications Team