2011 Island Plan: interim review
Revised draft revision 2011 Island Plan
March 2014
Introduction
The Minister for Planning and Environment wishes to revise parts of the 2011 Island Plan.
Scope
The scope of this interim review of the 2011 Island Plan is limited to a small number of polices and proposals and does not involve a review of the entire plan. The policies and proposals included as part of this interim review are as follows:
Natural Environment
- Proposal 4a: Restrict permitted development rights in the Coastal National Park
- Policy NE6: Coastal National Park
- Policy NE7: Green Zone
Housing
- Proposal 20: Provision of homes
- Policy H1: Category A affordable housing sites
- Policy H2: : Other Category A affordable housing sites
- Proposal H3: Affordable housing proposal
- Policy H4: Housing mix
- Policy H5: Affordable housing in rural centres
- Policy H6: Housing development within the Built-up Area
Natural Resources
- Policy NR8: Safety zones for hazardous installations
- Policy NR9: Utilities infrastructure facilities
Site Assessments
- H1 (4) De la Mare Nurseries, Grouville
- H1 (5) Samares Nurseries, St Clement
- H1 (6) Le Quesne Nurseries, St Clement
- H1 (7) Longueville Nurseries, St Saviour
- H5 (1) F. 785, St Ouen
- H5 (2) F.402, St Martin
- Policy GD2: Demolition and replacement of buildings (proposed to be deleted without modification or replacement)
Natural Environment
Coastal National Park
A National Park for Jersey
- Parts of the Jersey coast and countryside are of national and international importance.StOuen'sBayhaslongbeensorecognisedandsubjecttosafeguarding policies since1968. These were superseded by the more extensive designation of aCoastalNationalParkin2011.ItsboundaryembracesallthosepartsoftheIsland ofhighlysensitiveandvaluablelandscapequality,vulnerabletochangeanddamage, which warrant the highest level of protection against development. Its extent was informed by the Countryside Character Appraisal (1999) and includes:
The Coastal Plain of St Ouen's Bay: The coastal plain of Les Quennevais dune system and St Ouen's Bay Coastal Plain with its fresh and saltwater wetland and sand dune habitats supporting exceptional birdlife and wildlife, distinguished landscapes and high recreational value, comprising:
B4: Quennevais Dunes
B5: St Ouen's Bay Coastal Plain
La Commune de Gouray: The dunes at La Commune de Gouray, which form part of the Grouville Coastal Plain character area (B1), are a remnant of the historic landscape of this area and provide an important open break in the coastline. They are also valuable in terms of biodiversity, particularly for birds.
La Commune de Gouray (part of B1: Grouville Coastal Plain)
Escarpment: The steep topography of the escarpment, forming a backdrop to the flat coastal plain, is a distinctive feature of the Island's landscape. On the exposed scarp slopes of St Ouen's Bay, stone walls are the characteristic field boundary.
C3: St Ouen's Bay Escarpment and Valleys
Cliffs and Headlands: The cliffs and heathland of the north coast and the south-western headlands with their spectacular coastal scenery and sense of wilderness, geological and geomorphologicalfeatures, birdlife and exceptional habitats, archaeological sites, common land, modern fortifications and high recreational value. Also, the north-east wooded edge with its lower, gentler coastline,cut by wooded valleysand with numerousshelteredcreeksand coves along the north.
A1: North Coast Headland
A2: South-west Headlands
A3: North-east Low Wooded Edge
Enclosed Valleys: The majority of the Island's broad-leaved woodland occurs on the steep valleyssides. The narrowwinding lanesare a distinctivefeature. Lichen-cladpinkgranitewallsarecharacteristicfeaturesoftheinteriorvalleys. The freshwater streams and associated wet grassland provide important habitats.
D4: North Coast Valleys (including Mourier Valley) D5: St Martin's Valleys
Wolf's Caves car park and former cafe/bar
Cliff Edge with Deep Sea:
F1: North and South-west Cliffs
Offshore Reefs and Islands: The whole area of offshore reefs and islets forms one main character type:
H1: Les Écréhous (including the Paternosters and Dirouilles) H2: Le Plateau des Minquiers
Map 2.4 Coastal National Park Areas
- The Coastal National Park's primary purposes are:
- theconservationandenhancementofthenaturalbeauty,wildlifeandcultural heritage of the National Park;
- to promote opportunities for the understanding and enjoyment of the special qualities of the National Park by the public.
- The purpose of planning policy in the Coastal National Park is to provide the highest level of protection against development to support these primary purposes.
- It is acknowledged that the National Park is a living landscape, containing buildingsandlanduses.Whilstthereisthestrongestpresumptionagainstnewuses or buildings that would detract from its landscape character, there may be opportunity to secure the repair and restoration of natural beauty, wildlife and cultural heritage through exceptions where the development of existing buildings or land uses provide opportunities to repair or reduce their existing harm to landscape character. Development may also provide opportunities for public understanding and enjoyment of the Park.
- There is also a need to provide for the reasonable expectation of residents toimprovetheirhomesandbusinessestoundertakeeconomicactivityandprovide employment, having regard to the capacity of the landscape to accommodate development without harm.
- Accordingly, Policy NE6 sets a strong presumption but not an absolute moratorium against development within the Park: the key test is the capacity of the site and its context to accommodate development without harm to landscape character. This is the starting point for the consideration of development proposals. The following categories may, exceptionally, be considered though not all cases will be acceptable.
Residential
- It would be unreasonable to resist all forms of development to improve people's homes. The following forms of development related to residential land use and buildings may be permitted as exceptions to the strong presumption against development here, but only where it does not cause harm to landscape character.
Extension of a dwelling
- The acceptability of an extension to a dwelling will be determined by its scale, design and impact on landscape character.
- Each case should be assessed on its merits and, in particular, regard had to the sensitivity of the site, relative to the capacity of the landscape character area to accept change.
- The design and scale of any extension must remain subservient to the existingdwellingandnotdisproportionatelyincreaseitssizeintermsofgross floorspace, building footprint or visual impact.
- Thepurposewillbeamaterialconsiderationandshouldnotfacilitate a significant increase in occupancy. Intensification of domestic use would place more pressure upon a fragile environment, limited infrastructure and servicesand be likelyto increasetrip generation.The cumulativeenlargement of existing dwellings, and associated increases in resident population and activity, can undermine an area's character as much as new homes: a site's planning history will, therefore, be a material consideration.
Redevelopment of existing dwellings and ancillary residential buildings or structures
- The principle of demolition and replacement of existing dwellings is supported only where demonstrable environmental gains can be delivered.
- Comprehensive proposals of this type can offer the possibility of repairing and restoring landscape character which might be achieved by environmental gains including some or all of: reduced visual scale, mass and volume of a building; more sensitive and sympathetic siting and design; materials, colours and finishes more sensitive to the character area.
- In all cases, replacement buildings should not be larger than that being replaced in terms of any of gross floorspace(18), building footprint or visual
impact, and should not facilitate a significant increase in occupancy. Intensification of domestic use would place more pressure upon a fragile environment, limited infrastructure and services and be likely to increase trip generation.
Creation of new households
- The creationof new householdsby the developmentof new dwellings or the extension of existing residential properties to provide independent accommodation will be strongly resisted.
- Similarly, extensions which, due to their layout are tantamount to the creation of a separate dwelling by, for example, including sleeping, bathroom and living space will be regarded as having the potential to accommodate a separate household and will be similarly resisted, as counter to the strategic objectives of the Plan (in relation to sustainable patterns of development; reducing the need to travel; and reducing dependence on the private car), as well as challenging the strong presumption against development in the Coastal National Park with potentially serious implications for harm to its landscape character.
Extension of domestic curtilage
- There is the strongest presumption against extensions of domestic curtilages, which can have an impact on the sense of wilderness, isolation andremotenessthatareimportantinpartsoftheNationalPark.Incremental loss and erosion of landscape character to domestication would seriously undermine the quality and cohesion of landscape character.
Employment land and buildings
- TheCoastalNationalParkarisesfromtheinteractionofhumanandnatural influences: the economic history of the Island, together with political and social influences, has been instrumental in shaping the landscape that we find today. The Park remains a working environment in many places with uses and buildings performing employment and economic functions. Economic growth and diversification are Plan objectives and Policies SP5, E1 and ERE1 seek to safeguard existingemploymentlandandpremises.Thefollowingformsofdevelopmentrelated to employment land use and buildings may be permitted as exceptions to the strong presumption against development, but only where it does not cause harm to landscape character:
- Where gross floorspace and building footprint is measured to the external walls of the building to be replaced including any porches and conservatories, but excludes any detached outbuildings
Extension and intensification of use
- Thesensitivityoflandscapecharacterwillbetheprimaryconsideration in the assessment of development proposals to extend or intensify existing employment land uses or buildings in the Coastal National Park, including tourismandagriculturaluses.Acasewillneedtobemadeastowhyacoastal or countryside location is required for the proposal, which may require the applicant to set out what alternative locations have been considered.
- The acceptability of an extension to an employment building will be determined by its scale, design and its impact on landscape character.
- Each case will be assessed on its merits and, in particular, regard had to the sensitivity of the site, relative to the capacity of the landscape character area to accept change.
- In all cases, the design and scale of any extension must remain subservient to the existing building. There is a strong presumption against new ancillary buildings in the Coastal National Park.
- Any proposal that would intensify an existing employment use will need to be assessed having regard to additional travel and traffic, at a strategic level, and noise and disturbance locally, particularly where the outcome could adversely affect the Park's sense of wilderness, isolation and remoteness.
- The cumulative enlargement of existing buildings, and associated increases in activity, can undermine an area's character as much as new buildings: a site's planning history will, therefore,be a material consideration.
Redevelopmentofexistingemploymentbuildingsforthesameemploymentuse
- Theprincipleofredevelopment,involvingdemolitionandreplacement, of existing employment buildings for the same employment use is supported where demonstrable environmental gains can be delivered.
- Comprehensive proposals of this type can offer the possibility of repairing and restoring landscape character, which might be achieved by environmental gains including some or all of: reduced visual scale, mass and volume of a building; more sensitive and sympathetic siting and design; materials, colours and finishes more sensitive to landscape character.
- Replacementbuildingsshouldbenolarger,intermsofgrossfloorspace, building footprint or visual impact than that being replaced. Consideration will also be given to the intensity of use and impact of travel, traffic and noise upon the Park's special character.
Change of use: conversion to other employment use
- The change of use of employment land and buildings (involving conversion of a building), to other employment uses, will need to satisfy the requirementsofPolicyE1:Protectionofemploymentlandinthefirstinstance. A case will also need to be made as to why a coastal or countryside location is required for the proposal, which may require the applicant to set out what alternative locations have been considered.
- Any proposal that would intensify employment use will need to be assessed having regard to additional travel and traffic, at a strategic level, and noise and disturbance locally, particularly where the outcome could adversely affect the Park's sense of wilderness, isolation and remoteness. Any visual implications will also be carefully considered having regard to landscape character.
Change of use: conversion to residential or other non-employment use
- There is a strong presumption against the loss of employment land and buildings to residential and other non-employment use. The conversion of modern agricultural buildings and glasshouses to residential or other non-employment uses will not be permitted.
- NewhomesandotherdevelopmentintheCoastalNationalPark,where the availability of services, amenities and public infrastructure is generally limited does little to contribute towards the attainment of a more sustainable patternofdevelopment.Conversionofanemploymentbuildingtoresidential use is, therefore, most unlikely to be permitted.
- Proposals may, exceptionally, be viewed more favourably where the redundancy of employment use is proven (under the requirements of Policy E1) or where the proposal involves the conversion of offices and tourism accommodation; and where it delivers demonstrable environmental benefits through reduced intensity of use and visual improvement to the building and its setting.
- Former hotels proposed for residential conversion will be expected to secure significantly reduced intensity of use, since permission is likely to have been granted for hotel use, and/or an expansion of either an original residential or hotel use, on a site where permission for a large extent of residential development would not normally have been countenanced. Sustainabilityatastrategiclevelwillbeamaterialconsiderationandrequire evidence of how this has been assessed, such as a comparison of reliance on public infrastructure and trip generation.
- Such development would also need to deliver other environmental gains such as: enhanced appearance of the building; materials, colours and finishes more sensitive to the character area; and landscaping to enhance and repair the setting of existing buildings.
- Careful regard will be given to the visual impacts of any required external space, in particular car parking and amenity areas, on landscape character.
Redevelopment of existing employment buildings for other employment or non-employment use
- The principle of allowing the redevelopment, involving demolition and replacement for alternative uses, including other employment uses, of existing employment buildings is supported where significant environmental gains can be delivered.
- Such proposals will need to satisfy the requirements of Policy E1: Protection of employment land in the first instance, and a case made as to why a coastal or countryside location is required, which may require the applicant to set out what alternative locations have been considered.
- The Minister acknowledges that managing an exception to the strong presumption against any development in the Coastal National Park is challenging, and that it is important to be clear about the benefits that any such development proposal might bring.
- Comprehensive development of this type offers the possibility of repairing and restoring landscape character of the area, which might be achieved by environmental gains including some or all of;
- a significantreductionin visualmass,scaleand volume-thismightbe achieved by a reduction in the mass and scale of buildings in the landscape.
- opportunities may arise to remove uncharacteristically large buildings
- such as hotels or other tourism related buildings - from the landscape, through their redevelopment and replacement by smaller buildings, more sympathetic to their locality and its landscape.
- asignificantreductioninintensityofuse-redevelopmentforresidential use will be permitted only where the residentialyield is extremelylimited and secures significant reductions in floorspace and/or occupancy;
- sustainability at a strategic level will be a material consideration and require evidence of how this has been assessed, such as a comparison of reliance on public infrastructure and trip generation.
- more sensitive and sympathetic siting and design: there is ample evidenceofpoorlysitedanddesignedbuildings,andadditionstobuildings, around the Island's coastline; redevelopment offers scope to remedy the
existingharm;proposalswillbe requiredtoreflectprinciplesin theJersey Design Guide, and must, in particular, demonstrate a mindful understanding of context, and be respectful of it, especially within sensitive landscape;
- a more sensitive use of materials: this may be achieved by reflecting the distinctiveness of the character area in the proposal's form, materials and finishes, including colour.
- Replacementbuildingsshouldbenolarger,intermsofgrossfloorspace, building footprint or visual impact than that being replaced. Consideration will also be given to the intensity of use and impact of travel, traffic and noise upon the Park's special character. Regard will also be had to opportunities to support the purposes of the Park including enhanced public access and addressing management threats and priorities identified in the Countryside Character Appraisal.
- The redevelopment of modern agricultural buildings by demolition and replacement for another use will not be supported, since these would have been permitted to meet agricultural need. If no longer so required they should be removed or re- used for agriculture or employment-related uses. Similarly, the redevelopment of glasshouses will not be permitted.
Cultural and tourism uses
- One of the Park's purposes, to promote opportunities for understanding and enjoyment of its special qualities, is likely to create tensions with its other purpose: the conservation and enhancement of natural beauty, wildlife and cultural heritage. Managing this requires that new or extended cultural and tourism development is sensitive and proportionate to the fragility and vulnerability of its landscape setting.
- The Countryside Character Appraisal is a valuable tool, identifying development and management threats to the each of the Park's character areas and their capacity for change. It can be used to inform decisions on development proposals and implications for subsequent use of different parts of the Park.
- Given the strong presumption against development in the Coastal National Park any exceptions related to new or extended cultural and tourism attractions must have very limited impact on its relevant landscape character area.
- Examples might include proposals based on the use and enjoyment of environmental and heritage assets, and likely to relate to informal recreation, leisure and tourism.
- Interpretative facilities and access infrastructure proposals will be considered favourably where designed to minimise visual impact and having no undue effects on sensitive environmental or heritage assets.
- Similarly, proposals involving a change of use of land to enable activity-based tourism and leisure pursuits will be considered relative to their impacts upon the sensitivity of environmental and heritage assets, as well as the implications of greater levels of more active use of land within the National Park, where the qualities of remoteness and peacefulness may be particularly significant.
- Leisure and tourism activities can generate a requirement for ancillary services and buildings and a number of facilities – such as cafés, bars, kiosks and toilets – exist in parts of the Park.
- Proposals to extend, intensify or redevelop existing leisure and tourism facilities will be considered as with any other employment use.
- New leisure and tourism buildings are unlikely to be favourably considered other than possibly small scale buildings or structures such as beach kiosks. The visualimplications,infrastructurerequirementsandeffectonthelocality'sintensity of the use will require careful consideration relative to the sensitivity of the landscape character. It is unlikely that they will be favourably considered where highly visible and/or unscreened by landscaping or where there are no nearby existing formal car parking and/or toilet facilities.
Minor development
- DevelopmentofanyscalecanadverselyaffectthequalitiesoftheCoastal National Park because of its sensitive, fragile landscape. Buildings in the Park presently have the same permitted development rights as those elsewhere; the Minister intends to limit these rights here to enable the impact of minor changes to be regulated. This will require amendment to the Planning and Building (General Development)OrderandtheMinisterwillconsultfurtheruponthenatureofchanges proposed.
- These will not be intended to prohibit all forms of minor development, whichwouldbeunreasonableandunrealistic,buttomakeagreaterrangeofthem subject to individual assessment. Small scale proposals, incidental to the primary use of land and buildings - such as minor alterations to existing buildings, swimming pools,drivewaysandotherformsofhardlandscaping,accesses,meansofenclosure, signs, flags and other advertisements, satellite dishes and other antennae - will be permissible but only if well designed and sited and their impact does not harm the character of the area.
- For the avoidance of doubt, there will remain a strongpresumptionagainst the development of new ancillary buildings in the Coastal National Park with the exception of small incidental domestic outbuildings of a temporary nature – such as garden sheds and greenhouses – which may be permissible if well sited, and designed and where their impact does not harm landscape character.
Restrict permitted development rights in the Coastal National Park
The Minister for Planning and Environment will further explore the restriction of permitted development rights in the Coastal National Park in order to better protect its fragile and sensitive landscape character. This will include consultation with stakeholders on any proposed changes to the Planning and Building (General Development) Order.
Strategic development
- There may emerge, during the remainder of the Plan period, strategic development proposals of Island-wide significance related to the generation of utility-scale renewable energy; the provision of public water supplies and the extractionof minerals in the Coastal National Park. Specifically, this might include utility-scaleoff-shorewind and/or tidal energy development;the expansion of Val de la Mare reservoir; the extension, replacement or renewal of La Rosière desalination plant and the expansion of sand quarrying in St Ouen's Bay.
- Any such development will likely need to be considered within the context of a full and thorough Environmental Impact Assessment to ensure that: the need is proven; alternatives have been properly identified and considered; and that environmental implications for the Park are properly identified, avoided and/or mitigated as far as possible.
- In accord with the Plan's sequential approach to development, consideration of alternative less environmentally sensitive locations will need to have been properly considered as part of any justification for strategic forms of development in the Coastal National Park.
- Any such proposals will need to be considered against Policies NR4-6: Renewable energy; MR3: New or extended mineral workings, and NR9: Utilities infrastructure facilities respectively
Policy NE 6
Coastal National Park
The primary purposes of the Coastal National Park are:
the conservation and enhancement of the natural beauty, wildlife and cultural heritage of the National Park;
to promote opportunities for the understanding and enjoyment of the special qualities of the National Park by the public.
In support of these purposes, the Coastal National Park, as designated on the Proposals Map, will be given the highest level of protection from development and this will normally be given priority over all other planning considerations.
In this area there will be the strongest presumption against all forms of development, including but not limited to:
the development of a new dwelling (other than as a replacement under 2 and 7; or conversion under 6, below);
facilitating a separate household by means of an extension, conversion or new build;
the change of use of land to extend a domestic curtilage; development of staff and key agricultural workers' accommodation;
redevelopment of modern agricultural building(s) involving demolition and replacement with a building(s) for another use, or their conversion to a non-employment use;
redevelopmentof glasshouse(s)involvingdemolitionand replacementwith a building(s) or conversion for another use , or their conversion to a non-employment use;
development of ancillary buildings (other than temporary domestic buildings under 9b below)
Only the followingexceptions may be permissible,and only where they do not cause harm to landscape character
Residential
- the extension of a dwelling, but only where:
a. it remains subservient to the existing building in terms of design and scale;
b.itisdesignedappropriatelyrelativetoexistingbuildingsanditscontext;
- having regard to its planning history, it does not disproportionately increase the size of the dwelling in terms of any of its gross floorspace, building footprint or visual impact;
- it does not facilitate significant increased occupancy; and
- it does not harm landscape character.
- the redevelopment of an existing dwelling and/or an existing ancillaryresidential building and/or structure, involving demolition and replacement,but only where the proposal would:
- not be larger in terms of any of gross floorspace, building footprint orvisual impact than the building being replaced;
- not facilitate a significant increase in occupancy; and
- give rise to demonstrable environmental gains, contributing to therepair and restoration of landscape character.
Employment
- the extension and/or intensification of use of existing employment buildingsand land, but only where;
a. the requirement for a coastal or countryside location is adequately justified;
b.anextensionremainssubservient,wellrelatedtotheexistingbuilding in design and scale;
- an intensification does not create undue noise, disturbance or asignificant increase in travel and trip generation; and
- it does not cause harm to landscape character.
- the redevelopment of an employment building(s), involving demolition andreplacement for the same use, but only where:
- it would be no larger in terms of any of gross floorspace, buildingfootprint or visual impact than that being replaced;
- an intensification does not create undue noise, disturbance or asignificant increase in travel and trip generation; and
- it gives rise to demonstrable environmental gains, contributing to therepair and restoration of landscape character.
- the change of use of employment land and buildings (involving conversionof a building), to other employment uses, but only where:
- it would accord with Policy E1: Protection of employment land;
- therequirementfora coastalorcountrysidelocationcanbe adequatelyjustified;
c.inthecaseofanintensificationofuse,itdoesnotcreateunduenoise, disturbance or a significant increase in travel and trip generation; and
d. it does not harm landscape character.
- the change of use of employment land and buildings (involving conversion of a building) to non-employment uses but only where:
a. the redundancy of employment use is proven in accord with Policy E1: Protectionofemploymentlandorwherethedevelopmentinvolvesoffice or tourism accommodation; and
b.itgivesriseto:demonstrableenvironmentalgains,contributingtothe repair and restoration of landscape character; reduced intensity of occupationanduse;andimproveddesignandappearanceofthelandand building(s); or;
c. it secures a viable alternative use for a traditional farm building in accord with Policy ERE4 Change of use and/or conversion of traditional farm buildings.
- the redevelopment of an employment building(s), involving demolition and replacement for another use, but only where:
- the redundancy of employment use is proven in accord with Policy E1: Protectionofemploymentlandorwherethedevelopmentinvolvesoffice or tourism accommodation; and
- the proposal is no larger in terms of any of gross floorspace, building footprint or visual impact than the building being replaced; and
- it givesrise to: demonstrableenvironmentalgains,contributingto the repair and restoration of landscape character; reduced intensity of occupationanduse;andimproveddesignandappearanceofthelandand building(s).
- New cultural and tourism development, but only where it:
- supports the purposes of the Coastal National Park;
- is appropriate relative to existing buildings and its landscape context; and
- does not harm landscape character.
Minor development
- Development small in scale and incidental to the primary use of land andbuildings, but only where:
- it is well sited and designed, having regard to the relationship withexisting buildings, landscape context, size, material, colour and form;and
- for an ancillary residential building, it is also of a temporary nature;and
- it does not cause harm to landscape character.
Strategic development
- Where it is demonstrated to satisfy a proven Island need, relative to theproper assessment of alternative options, strategic development related torenewable energy production; new or extended utilities infrastructure; orextraction of minerals, but only where:
a.itsenvironmentalimplicationsareproperlyidentified,avoidedand/or mitigated as far as possible; and it accords with,
- Policy NR 4: Exploratory, appraisal or prototype off-shore utility scalerenewable energy proposals; or
- Policy NR 5: Off-shore utility scale renewable energy development; or
- Policy NR6: On-shore renewal energy production; or
- Policy NR9: Utilities infrastructure facilities; or
- Policy MR3: New or extended mineral workings.
- In defining the extent of the National Park, it is inevitable that the boundary embraces both living and working landscapes, where many of the characteristic qualities that provide its special appeal are as much the result of human activities, particularly farming, as of natural forces. It will be essential to cultivate the economic and social well-being of local communities found within the park by working closely with individuals, community, amenity, business and special interest groups. The Minister for Planning and Environment will develop and adopt a Management Plan for the Coastal National Park, in discussion and engagement with stake-holders, during the Plan period.
Proposal 5
Coastal National Park Management Plan
The Minister for Planning and Environment will develop and adopt a Coastal NationalParkManagementPlantodelivertheobjectivesoftheCoastalNational Park, which include:
- theconservationandenhancementthenaturalbeauty,wildlifeandcultural heritage of the National Park;
- to promote opportunities for the understanding and enjoyment of the special qualities of the National Park by the public.
This will be undertaken in co-operation with other public and private agencies, interest groups, landowners and farmers during the Plan period.
Green Zone
Green Zone
- The concept of the Green Zone is already well established and familiar to Island residents. The vigorous public response, in the Green Paper and Imagine Jersey2035,tofurtherprotectthecountrysidefromdevelopmenthasdemonstrated a clear need to review and strengthen the existing countryside policies in order to further protect this important asset. Accordingly, in addition to the introduction of the Coastal National Park, the boundaries of the Green Zone have been extended to include those areas in what was formerly the Countryside Zone, as defined in the 2002 Island Plan.
- The areas of the countryside which are outside the Coastal National Park are now defined as Green Zone and includes those areas of the countryside which haveanintactcharacterandcompriseanimportantrangeofenvironmentalfeatures needing a high level of protection. Those areas of the Island's countryside which are largely distinctive, historic, farmed landscapes and coastal plains are also now included within the Green Zone. This interior agricultural landscape covers the greater part of the plateau and part of the coastal plains. It presents a rich backgroundincludinganattractiveandintricatepatternofsmallfields,enclosures and lanes, an ecologically rich network of hedgerows, verges and banques, many cultural sites and a wealth of typical Jersey granite vernacular buildings. The ridges and skylines of the plateau are particularly sensitive to the visual impact of development.
- The Green Zone includes a number of distinct character areas and the Minister for Planning and Environment will have regard to the supplementary guidance contained in the Countryside Character Appraisal in determining any development proposals in this area.
- These areas include:
The main escarpments of St Clement, Grouville , Ouaisné, and St Brelade's Bay
C1: Grouville – St Saviour C2: South Coast
The wooded valleys of St Peter's, Waterworks, Bellozanne, Grands Vaux, Vallée des Vaux, Fern and Queen's Valleys, amongst others;
D1: Main Interior Valleys D2: Eastern Plateau Valleys D3: St Brelade's Valley
The interior agricultural land: to the north, including
E1: North-west Headland (St Ouen) E3: North-east (St Martin)
E4: North Coast
- These areas are designated as Green Zone on the Proposals Map.
Map 2.5 Green Zone Areas
- Whilst not as remote and wild in character as the Coastal National Park there will still be a general presumption against any development in the Green Zone in order to retain the quality and distinctiveness of the Island's countryside here and to ensure that the distinct character of the zone remains intact. The qualityanddistinctivenessofthelandscapecharacterareasoftheGreenZonestill makesthemsensitivetotheeffectsofintrusivedevelopmentwhilsthavingagreater capacity to accept some change.
- As in the Coastal National Park, however, the Green Zone is even more of a living landscape, containing a greater number and variety of buildings and land uses. Whilst there is a presumption against new uses or buildings that would detract from its landscape character, there may be opportunity to secure the repair andrestorationofitthroughexceptionswherethedevelopmentofexistingbuildings or land uses provide opportunities to repair or reduce their existing harm to landscape character. Development may also provide opportunities for public access and enjoyment of the countryside.
- There is also a need to provide for the reasonable expectation of residents toimprovetheirhomesandbusinessestoundertakeeconomicactivityandprovide employment, having regard to the capacity of the landscape to accommodate development without serious harm.
- Accordingly, Policy NE7 sets a presumption but not an absolute moratorium against development within the Green Zone: the key test is the capacity of the siteanditscontexttoaccommodatedevelopmentwithoutseriousharmtolandscape character. This is the starting point for the consideration of development proposals. The following categories may, exceptionally, be considered though not all cases will be acceptable.
Residential
- It would be unreasonable to resist all forms of development to improve people's homes. The following forms of development related to residential land use and buildings may be permitted as exceptions to the presumption against development here, but only where it does not cause serious harm to landscape character:
Extension of a dwelling
- The acceptability of an extension to a dwelling will be determined by its scale, design and impact on landscape character.
- Each case should be assessed on its merits and, in particular, regard had to the sensitivity of the site, relative to the capacity of the landscape character area to accept change.
- The design and scale of any extension must remain subservient to the existing dwelling and not disproportionately increase its size in terms of gross floorspace, building footprint or visual impact.
- The purpose will be a material considerationand should not facilitate a significant increase in occupancy. Intensification of domestic use would place more pressure upon a fragile environment, limited infrastructure and servicesand be likelyto increasetrip generation.The cumulativeenlargement of existing dwellings, and associated increases in resident population and activity, can undermine an area's character as much as new homes: a site's planning history will, therefore, be a material consideration.
Ancillary buildings
- Proposalsto developbuildingsand structuresancillaryto a residential useofland,suchasgaragesandotheroutbuildings(whicharenotintheform of extensions to the principal dwelling house) should be considered in the same manner as extensions, where the key test will be the impact upon landscape character. Proposals for the creation of habitable accommodation in detached ancillary buildings will not be supported.
Redevelopment of existing dwellings and ancillary buildings or structures
- The principle of demolition and replacement of existing dwellings is supported only where demonstrable environmental gains can be delivered.
- Comprehensive proposals of this type can offer the possibility of repairing and restoring landscape character which might be achieved by environmental gains including some or all of: reduced visual scale, mass and volume of a building; more sensitive and sympathetic siting and design; materials, colours and finishes more sensitive to the character area.
- In all cases, replacement buildings should not be larger than that being replaced in terms of any of gross floorspace(19), building footprint or
visual impact, and should not facilitate a significant increase in occupancy. Intensification of domestic use would place more pressure upon a fragile environment, limited infrastructure and services and be likely to increase trip generation.
Creation of new households
- The creationof new householdsby the developmentof new dwellings or the extension of existing residential properties to provide independent accommodation will generally be resisted in the Green Zone: it is counter to the strategic objectives of the Plan (in relation to sustainable patterns of development; reducing the need to travel; and reducing dependence on the private car), as well as challenging the general presumption against development.
- In some instances it may, however, be possible to make exception to permit the extension or conversion of part of a dwelling (such as an integral garage) to provide independent accommodation in the Green Zone for an elderly relative or a relative who requires some degree of care and/or support for their personal well-being and health. This will, however, only be permissible where the accommodation is capable of re-integration into the main dwelling and where any extension or conversion would not seriously harm landscape character. Any exception made in response to such family circumstances will need to be carefully regulated and may be subject to a planning obligation agreement to ensure the ultimate re-integration of the accommodation into the main dwelling.
- The Green Zone contains most of the Island's working countryside and the only other possible exception to the presumption against the creation of new households here may relate to the provision of staff and key agricultural workers' accommodation, in accordance with Policy H9.
- Where gross floorspace and building footprint is measured to the external walls of the building to be replaced including any porches and conservatories, but excludes any detached outbuildings.
Extension of domestic curtilage
- There is the strongest presumption against extensions of domestic curtilages, which can result in incremental loss and erosion of landscape character to domestication in the countryside.
Employment land use and buildings
- The Green Zone arises from the interaction of human and natural influences: the economic history of the Island, together with political and social influences, has been instrumental in shaping the landscape that we find today. The countryside remains a working environment in many places with uses and buildings performing employment and economic functions.
- Economic growth and diversification are Plan objectives and Policies SP5, E1 and ERE1 seek to safeguard existing employment land and premises. The followingformsofdevelopmentrelatedtoemploymentlanduseandbuildingsmay be permitted as exceptions to the presumption against development, but only where it does not cause serious harm to landscape character.
Extension and intensification of use
- The sensitivity of landscape character will be the primary consideration in the assessment of development proposals to extend or intensify existing employment land uses or buildings in the Green Zone, including tourism and agricultural uses. A case will need to be made as to why a coastal or countryside location is required for the proposal, which may require the applicant to set out what alternative locations have been considered.
- The acceptability of an extension to an employment building will be determined by its scale, design and its impact on landscape character.
- Each case will be assessed on its merits and, in particular, regard had to the sensitivity of the site, relative to the capacity of the landscape character area to accept change.
- In all cases, the design and scale of any extension must remain subservient to the existing building.
- Any proposal that would intensify an existing employment use will need to be assessed having regard to additional travel and traffic, at a strategic level, and noise and disturbance locally.
- The cumulative enlargement of existing buildings, and associated increases in activity, can undermine an area's character as much as new buildings: a site's planning history will, therefore,be a material consideration.
Ancillary employment buildings
- Proposals to develop buildings and structures ancillary to an employment use of land, (which are not in the form of extensions to the principal building) should be considered in the same manner as extensions, where the key test will be the impact upon landscape character.
Redevelopmentofexistingemploymentbuildingsforthesameemploymentuse
- The principle of redevelopment, involving demolition and replacement,ofexistingemploymentbuildingsforthesameemploymentuse is supported where demonstrable environmental gains can be delivered.
- Comprehensive proposals of this type can offer the possibility of repairing and restoring landscape character, which might be achieved by environmental gains including some or all of: reduced visual scale, mass and volume of a building; more sensitive and sympathetic siting and design; materials, colours and finishes more sensitive to landscape character.
- Replacement buildings should be no larger, in terms of gross floorspace(20), building footprint or visual impact than that being replaced.
Consideration will also be given to the intensity of use and impact of travel, traffic and noise upon the character of the area.
Change of use: conversion to other employment use
- The change of use of employment land and buildings (involving conversion of a building), to other employment uses, will need to satisfy the requirementsof Policy E1: Protectionof employmentland in the first instance. A case will also need to be made as to why a coastal or countryside location is required for the proposal, which may require the applicant to set out what alternative locations have been considered.
- Any proposal that would intensify employment use will need to be assessed having regard to additional travel and traffic, at a strategic level, and noise and disturbance locally. Any visual implications will also be carefully considered having regard to landscape character.
Change of use: conversion to residential or other non-employment use
- There is a general presumption against the loss of employment land and buildings to residential and other non-employment use. The conversion of modern agricultural buildings and glasshouses to residential or other non-employment uses will not be permitted.
- Where gross floorspace and building footprint is measured to the external walls of the building to be replaced, but excludes any detached outbuildings
- New homes and other development in the Green Zone, where the availabilityof services, amenities and public infrastructureis generallylimited does little to contribute towards the attainment of a more sustainable pattern of development. Conversion of an employment building to residential use is, therefore, most unlikely to be permitted.
- Proposals may, exceptionally, be viewed more favourably where the redundancy of employment use is proven (under the requirements of Policy E1) or where the proposal involves the conversion of offices and tourism accommodation; and where it delivers demonstrable environmental benefits through reduced intensity of use and visual improvement to the building and its setting.
- Former hotels proposed for residential conversion will be expected to secure significantly reduced intensity of use, since permission is likely to have been granted for hotel use, and/or an expansion of either an original residential or hotel use, on a site where permission for a large extent of residential development would not normally have been countenanced. Sustainabilityatastrategiclevelwillbeamaterialconsiderationandrequire evidence of how this has been assessed, such as a comparison of reliance on public infrastructure and trip generation.
- Such development would also need to deliver other environmental gains such as: enhanced appearance of the building; materials, colours and finishes more sensitive to the character area; and landscaping to enhance and repair the setting of existing buildings.
- Careful regard will be given to the visual impacts of any required external space, in particular car parking and amenity areas, on landscape character.
Redevelopment of existing employment buildings for other employment or non-employment use
- The principle of allowing the redevelopment, involving demolition and replacement for alternative uses, including other employment uses, of existing employment buildings is supported where significant environmental gains can be delivered.
- Such proposals will need to satisfy the requirements of Policy E1: Protection of employment land in the first instance, and a case made as to why a coastal or countryside location is required, which may require the applicant to set out what alternative locations have been considered.
- The Minister acknowledges that managing an exception to a general presumption against any development in the Green Zone is challenging, and that it is importantto be clear about the benefitsthat any such development proposal might bring.
- Comprehensive development of this type offers the possibility of repairing and restoring landscape character of the area, which might be achieved by environmental gains including some or all of;
- a significantreductionin visualmass,scaleand volume-thismightbe achieved by a reduction in the mass and scale of buildings in the landscape.
- opportunities may arise to remove uncharacteristically large buildings
- such as hotels or other tourism related buildings - from the landscape, through their redevelopment and replacement by smaller buildings, more sympathetic to their locality and its landscape.
- asignificantreductioninintensityofuse-redevelopmentforresidential use will be permitted only where the residentialyield is extremelylimited and secures significant reductions in floorspace and/or occupancy;
- sustainability at a strategic level will be a material consideration and require evidence of how this has been assessed, such as a comparison of reliance on public infrastructure and trip generation.
- more sensitive and sympathetic siting and design: there is ample evidenceofpoorlysitedanddesignedbuildings,andadditionstobuildings, around the Island's coastline; redevelopment offers scope to remedy the existingharm;proposalswillberequiredtoreflectprinciplesintheJersey
Design Guide(21), and must, in particular, demonstrate a mindful understanding of context, and be respectful of it, especially within
sensitive landscape;
- a more sensitive use of materials: this may be achieved by reflecting the distinctiveness of the character area in the proposal's form, materials and finishes, including colour.
- Replacement buildings should be no larger, in terms of gross floorspace, building footprint or visual impact than that being replaced. Consideration will also be given to the intensity of use and impact of travel, traffic and noise upon the character of the area. Regard will also be had to enhance public access and to address management threats and priorities for that character area.
- The redevelopment of modern agricultural buildings by demolition and replacement for another use will not be supported, since these would have been permitted to meet agricultural need. If no longer so required they should be removed or re- used for agriculture or employment-related uses. Similarly, the redevelopment of glasshouses will not be permitted.
- Jersey Design Guide (2008)
Cultural and tourism uses
- New or extended cultural and tourism development in the Green Zone needs to be sensitive and proportionate to the fragility and vulnerability of its landscapesetting.TheCountrysideCharacterAppraisalisavaluabletool,identifying development and management threats to character areas and their capacity for change: it can be used to inform decisions on development proposals. Given the presumption against development in the Green Zone any exceptions related to new or extended cultural and tourism attractions must have limited impact on its relevant landscape character area.
- Examples might include proposals based on the use and enjoyment of environmental and heritage assets, and likely to relate to informal recreation, leisure and tourism. Interpretative facilities and access infrastructure proposals willbeconsideredfavourablywheredesignedtominimisevisualimpactandhaving no undue effects on sensitive environmental or heritage assets. Similarly, proposals involving a change of use of land to enable activity-based tourism and leisure pursuits will be considered relative to their impacts upon the sensitivity of environmental and heritage assets, as well as the implications of greater levels of more active use of land for the character of an area.
- Proposals to extend, intensify or redevelop existing leisure and tourism facilities will be considered as with any other employment use.
- Leisureand tourismactivitiescan alsogeneratea requirementfor ancillary services and buildings. New leisure and tourism buildings are unlikely to be favourably considered other than possibly small scale buildings or structures such as kiosks. The visual implications, infrastructure requirements and effect on the locality's intensity of the use will require careful consideration relative to the sensitivity of the landscape character. It is unlikely that they will be favourably considered where highly visible and/or unscreened by landscaping or where there are no nearby existing formal car parking and/or toilet facilities.
Minor development
- Development of a minor scale that is ancillary to a primary use of land couldadverselyaffectthequalitiesoftheGreenZonedependingonthesensitivity of the landscape. Small scale proposals, that are incidental to the primary use of land and buildings and outside the scope of existing permitted development rights will only be permissible in the Green Zone where they are well designed and sited and their impact does not seriously harm landscape character.
Managed open spaces
- Managed open spaces, such as playing fields, other amenity spaces, cemeteries and allotments, can have a limited impact upon the character of the countryside. Their provision will be considered in terms of impact upon landscape character and other polices of the Plan, such as SCO5 and SCO6.
Strategic development
- There may emerge, during the remainder of the Plan period, strategic development proposals of Island-wide significance related to the generation of utility-scale renewable energy; the extraction of minerals; or the provision of elements of significant public infrastructure, such as a new secondary school in the Green Zone.
- Any such development will likely need to be considered within the context of a full and thorough Environmental Impact Assessment to ensure that: the need is proven; alternatives have been properly identified and considered; and that environmental implications for the Green Zone are properly identified, avoided and/or mitigated as far as possible.
- In accord with the Plan's sequential approach to development, consideration of alternative less environmentally sensitive locations will need to have been properly considered..
Policy NE 7
Green Zone
TheGreenZone,asdesignatedontheProposalsMap,willbegivenahighlevel ofprotectionfromdevelopmentandtherewillbeageneralpresumptionagainst all forms of development, including but not limited to:
the development of a new dwelling (other than as a replacement under 3 and 10; the provision of new, under 4; or conversion under 9, below);
facilitating a separate household by means of an extension, conversion or new build (other than to meet changing family circumstances under 1e below);
the change of use of land to extend a domestic curtilage;
redevelopment of modern agricultural building(s) involving demolition and replacement with a building(s) for another use, or their conversion to a non-employment use;
redevelopmentof glasshouse(s)involvingdemolitionand replacementwith a building(s) or conversion for another use , or their conversion to a non-employment use.
Only the followingexceptions may be permissible,and only where they do not cause serious harm to landscape character:
Residential
- the extension of a dwelling, but only where;
- it remains subservient to the existing building in terms of design andscale;
- its design is appropriate relative to existing buildings and its context;
- having regard to its planning history, it does not disproportionatelyincrease the size of the dwelling in terms of any of its gross floorspace,building footprint or visual impact;
- it does not facilitate significant increased occupancy; and
- in the case of an extension or the conversion of part of an existingdwelling that would lead to the creation of a separate household:
- the accommodation is for an elderly relative or a relative whorequires a degree of care and/or support for their health andwell-being;
- the new accommodation is capable of re-integration into theprincipal dwelling; and
- it is designed to lifetime home standards, and
- it does not seriously harm landscape character.
- the development of an ancillary building and/or structure, but only where;
- it is modest and is proportionate to other buildings on the site;
- itiswellsitedanddesigned,relativetootherbuildings,thecontext,size, material, colour and form; and
- it does not seriously harm landscape character.
- the redevelopment of an existing dwelling and/or an existing ancillary residential building and/or structure, involving demolition and replacement, but only where the proposal would;
- not be larger in terms of any of gross floorspace, building footprint or visual impact than the building being replaced;
- not facilitate a significant increase in occupancy; and
- give rise to demonstrable environmental gains, contributing to the repair and restoration of landscape character.
- the development of staff and key agricultural worker accommodation, but only where the proposal would;
- accord with Policy H9: staff and key agricultural worker accommodation; and
- not cause serious harm to the landscape character of the area.
Employment
- the extension and/or intensification of use of existing employment buildings and land, but only where, having regard to the planning history of the site;
- the requirement for a coastal or countryside location can be adequately justified;
- an extensionremainssubservient,well relatedto the existingbuilding in design and scale;
- an intensification does not create undue noise, disturbance or a significant increase in travel and trip generation; and
- it does not cause serious harm to landscape character.
- the development of an ancillary building and/or structure, but only where;
- it is modest and is proportionate to other buildings on the site;
- itiswellsitedanddesigned,relativetootherbuildings,thecontext, size, material, colour and form; and
- it does not cause serious harm to landscape character.
- the redevelopment of an employment building(s), involving demolition and replacement for the same use, but only where;
- it would be no larger in terms of any of gross floorspace, buildingfootprint or visual impact than that being replaced;
- an intensification does not create undue noise, disturbance or asignificant increase in travel and trip generation; and
- it gives rise to demonstrable environmental gains, contributing tothe repair and restoration of landscape character.
- the change of use of employment land and buildings (involving conversionof a building), to other employment uses, but only where:
- it would accord with Policy E1: Protection of employment land;
- the requirement for a coastal or countryside location can beadequately justified;
- in the case of an intensification of use, it does not create unduenoise, disturbance or a significant increase in travel and trip generation;and
- it does not cause serious harm to landscape character.
- the change of use of employment land and buildings (involving conversionof a building) to non-employment uses but only where:
- the redundancy of employment use is proven in accord with PolicyE1: Protection of employment land or where the development involvesoffice or tourism accommodation; and
- it gives rise to: demonstrable environmental gains, contributing tothe repair and restoration of landscape character; reduced intensity ofoccupationanduse;andimproveddesignandappearanceofthelandandbuilding(s); or
- it secures a viable alternative use for a traditional farm building inaccord with Policy ERE4.
10.theredevelopmentofanemploymentbuilding(s),involvingdemolitionand replacement for another use, but only where:
- the redundancy of employment use is proven in accord with PolicyE1: Protection of employment land or where the development involvesoffice or tourism accommodation; and
- the proposal is no larger in terms of any of gross floorspace, buildingfootprint or visual impact than the building being replaced; and
- it gives rise to: demonstrable environmental gains, contributing to the repair and restoration of landscape character; reduced intensity of occupationanduse;andimproveddesignandappearanceofthelandand building(s).
- new cultural and tourism development, but only where it:
- is appropriate relative to existing buildings and its landscape context; and
- does not seriously harm landscape character.
Minor development
- Development small in scale and incidental to the primary use of land and buildings, but only where it:
- is well sited and designed, having regard to the relationship with existing buildings, landscape context, size, material, colour and form; and
- does not cause serious harm to landscape character.
Managed open space
- Development of managed open space, such as allotments, playing fields, other amenity green spaces and cemeteries where it does not cause serious harm to the landscape character of the area.
Strategic development
- Where it is demonstrated to satisfy a proven Island need, relative to the proper assessment of alternative options, strategic development related to renewable energy production; extraction of minerals or other elements of significant public infrastructure, such as a new secondary school, but only where:
- itsenvironmentalimplicationsareproperlyidentified,avoidedand/or mitigated as far as possible; and it accords with
- Policy NR 6: On-shore renewable energy proposals; or
- Policy MR3: New or extended mineral workings.
Housing
6 Housing
H: Introduction
- The home is centralto life,providingthe fundamentalhuman need of shelter, in addition to meeting human desires for comfort, security, privacy, independence and personal identity. It is a fundamental role of the planning system and the Island Plan to provide an adequate supply of land to meet the housing requirements of the community over the Plan period.
- Housing, and in particular the location of new housing development, is perhaps the most highly contentious subject area to be tackled in any Island Plan. Residentialdevelopmentalsorepresentsavaluabletoolandasignificantopportunity to regenerate the physical and social fabric of Island communities and can play a positive role in improving the urban environment.
Policy context
- The States Strategic Plan 2012 establishes a clear objective that all Island residents be adequately housed and identifies a number of actions to meet this objective;
put in place schemes to generate affordable housing for social rental and purchase.
bring forward schemes to support first time buyers.
continue work on existing homes to meet the Decent Homes Standard'. establish a Strategic Housing Unit to co-ordinate a long term housing strategy. addressthefundingofthemaintenanceandreinvestmentoftheStatesowned social housing stock.
complete the Housing Transformation Programme to allow more flexibility in tackling housing issues.
- In accord with strategic land-use planning policies Policy SP 1 'Spatial strategy'; Policy SP 2 'Efficient use of resources'; Policy SP 3 'Sequential approach to development'; Policy SP 4 'Protecting the natural and historic environment' and Policy SP 6 'Reducing dependence on the car', the Plan also needs to ensure that homes are provided in the right location to help achieve a more sustainable form and pattern of development in Jersey. It is also envisaged that the provision of new homes during the Plan period will provide the mechanism to lead urban regeneration, particularly in St Helier. For this to be achieved, new housing must be of high quality and must be complemented by investment in the public realm and local infrastructure - either through planning gain or public intervention - to revive and create an attractive and desirable urban living environment.
- The provision of housing in Jersey is linked to residential qualifications. Those without residential qualifications have restricted options, being primarily, to live in unqualified property, such as a lodging house or staff accommodation, or to live in qualified property with a qualified person as their lodger or partner. Residential qualifications can be gained currently following ten years continuous
residence or on grounds of hardship, wealth, or essential employment (1). In accord with the Strategic Plan objective of providing adequate housing for all Island
residents,the Planseeksto addressqualifiedand unqualifiedhousingrequirements.
H: Objectives and indicators
Objective H 1
Housing objectives
- To ensure the provision of land and development opportunities to meet the Island's housing needs over the Plan period;
- ToleadtheregenerationoftheIsland'surbanareas,particularlyStHelier, through new residential development;
- To sustain the viability of rural parish communities, where there is a justifiable need to do so, through the provision of land and development opportunities for new residential development.
Indicators H 1
Housing indicators
- Numberofhomesbuiltrelativetoestimateddemandbycategory,tenure, type, size and affordability;
- NumberofhomesbuiltinStHelierandtheremainderoftheBuilt-upArea relative to estimated yields;
- Amount of new residential development in rural parish communities considered necessary to support viability and vitality;
- Population/migration levels and household structure changes.
- see Housing Law
H: Policies and proposals Planning for homes
- Planning for homes in Jersey requires an understanding of the requirements for homes and how homes will be supplied up to 2020. The Island Plan needs to address the anticipated overall demand for new homes during the Plan period, as wellasensuringthatneedsanddemandsfordifferentcategoriesofhousing,housing tenures, and housing types are met. This is not straightforward and is based on a series of estimations and assumptions. Providing adequate homes to meet all aspirations is a significant challenge but is one we must strive to continually meet if our population is to be adequately housed in the medium to long-term.
- Over the remaining period of the Plan, it is anticipated that the majority of newhomeswillcontinuetobeprovidedbytheprivatesector. Thiswillbethrough conversions, redevelopment and infill development within the Built-up Area and the provision of new homes on brownfield land, in accord with Policy SP 1 'Spatial strategy'. Housing trusts and the parishes may also provide some housing over the PlanperiodandStates-ownedlandwillhaveanenhancedroleinmeetingtheneed for affordable homes.
- The following sections set out the categories of housing on which the supply estimates and policies are based; summarises the housing requirements over the remainder of the Plan period and the manner in which they have been derived; and then addresses the anticipated supply of homes from existing sources. The Plan considers housing requirements, both in terms of need and demand, and sets out how these requirements will be met, having regard to the existing supply of homes.
Categories of housing
- Housing in Jersey is an expensive commodity. The Strategic Plan seeks to ensure that homes in the Island are made more affordable and that affordable housingshouldbetargetedatonlythosewhoneedthesupport,whilstalsoseeking to ensure that the demand for other types of housing is met. The Island Plan distinguishes between the different types of 'affordable'' and market' housing which are termed Category A' and Category B' housing respectively.
- The categories of homes used in the estimates of supply and matched to requirements in the Island Plan are:
Category A – Affordable housing
- Jersey has a number of particular challenges around the delivery of affordablehousing:inasmallisland,landwillgenerallyhaveahighervalueplaced upon it; construction costs can be comparatively high; and on-average higher
income levelshave led to an expensivehousingmarket. As a resultmany households cannotaffordthecostofhousinginJerseyandneedsomeassistancetomeettheir housing needs.
- The Minister for Planning and Environment has sought to specifically zone land for the provision of affordable homes to help meet this need. To ensure that the homes provided are truly affordable, the Minister for Planning and Environment also wishes to encourage innovation in construction methods and to explore alternative methods of ownership and housing delivery.
- Category A affordable housing is defined as follows;
Affordable (Category A) housing includes homes for social rent and purchase, provided to specified eligible households whose needs are not met by the commercial housing market.
Affordable housing should meet the needs of persons on median incomes or below, who would otherwise have financial difficulties renting or purchasing residential accommodation in the general residential market, determined with regard to income levels and house prices prevailing in Jersey; and
Affordable housing may be owned and managed by a registered affordable housing provider that provides homes to eligible families or individuals by means of sale or lease or by any other means on conditions that will ensure thatthehomewillremainavailableforeligiblefamiliesinthefuture.Inorder to ensure that the benefit of and access to affordable housing provided under this policy is not lost to future eligible households, conditions or restrictions may be imposed to ensure that the benefit may be recycled or retained in order to ensure the provision of affordable housing meets the needs of this and future generations.
The eligibility of households to access affordable housing shall be determined by their assessment through the Affordable Housing Gateway.
The Minister is committed to good quality design in housing and, in particular, will require that affordable homes be built to meet or exceed the standards for homes set out in supplementary planning guidance. To ensure that homes are truly affordable the Minister will encourage innovation in construction methods and alternative methods of home ownership and housing delivery.
TheclearrelationshipbetweenaffordablehousingandtheAffordableHousing Gateway means that housing that is developed for sale on the open market (Category B) is excluded from the definition of affordable housing whatever price it is sold at.
Category B – Market housing
- Markethousingincludesallotherformsofprivatesectorhousingwhereits priceissetintheopenmarket(thisincludesowner-occupation,privaterentaland private lodgings); together with staff accommodation and registered lodging houses and accommodation for people with special requirements (sheltered housing)
Demand for homes
Housing requirements
- Requirements over the remainder of the Plan period will arise from:
existing households moving home within Jersey; newhouseholdsformingwhoarecurrentlysharinghomeswithotherhouseholds, new households forming through demographic changes; and
the net effect of people moving into or leaving Jersey.
- Within each of these categories there will be those who cannot gain access to homes in the open market and thus need affordable' homes. There will also be special requirements for housing, such as for those with disabilities and sheltered housing for elderly people.
- Planning to meet the number and type of homes required by anticipated changes in the Island's population and by the latent demand for homes within the population has, of necessity, to involve assumptions and estimations about change in a range of factors over the Plan period. The two key factors which have most influence over the requirements for homes over the Plan period are:
the size and make-up of the Island's population,
people's housing aspirations (and their ability to realise them).
Population
- The size of the Island's population will crudely influence the number of homesthatwillneedtobeprovidedduringthePlanperiod.Againstademographic background of falling birth rates and falling death rates - an ageing population - the challenge for Jersey is to maintain a working age population that allows the economy to function and for services to be sustained, without threatening the Island's environment, infrastructure and quality of life.
- TheStatesStrategicPlan2009-2014establishedamaximuminwardmigration at a rolling five year average of no more than 150 heads of household per annum (which equates to an overall increase of approximately 325 people each year), to
be reviewed every three years. (2)
- States Strategic Plan 2009-2014, Priority 5: limit population growth (pp16)
- The 2011 Census showed population levels up from 87,186, in 2001, to 97,857 in 2011. The 2012 Strategic Plan acknowledged that 'many Islanders are concerned that immigration places undue pressure on our environment' and outlined, in response, that permissions for non locally qualified migrants would be limitedtosupportlocalemployment,butthatpermissionsforessentialemployees wouldcontinuewherehigheconomicandsocialvaluecouldbedemonstrated.The Council of Ministers recognises that further analysis of this issue is required and proposestoreviewimmigrationandpopulationobjectivesforJerseyaspartofthe development of a Long Term Plan. Until such time as this process is complete, the Island Plan will continue to be based on the framework (total of +150 household per annum/325 people per annum) set by the 2009-14 Strategic Plan. By way of comparison, in 2012, net immigration of persons with access to qualified housing (permanent J category Households) was +400, which equates to +155 such households.
- On the basis of this maximum target for the Island's population, and using Jersey-relevant data for fertility and mortality, the States of Jersey Statistics Unit has developed a Jersey Population Model which has been used to generate annual estimates of the Island's resident population at every year end for the period 2005-2065, which has informed the assumptions in the Island Plan.
- For the purposes of estimating demand for homes, the key statistic is not the number of individuals that make up the Island's population, but the number of households - defined as the number of people living together to form a household unit. The average size of a household has been falling in Jersey, as elsewhere, which means that even a stable or declining population can experience household growth generating a demand for more housing units. The factors which, it is believed, have contributed to this phenomenon include a decline in the rate of marriage and an increase in levels of divorce, separation and co-habitation; improved living standards and higher housing aspirations, (which have manifested in an increase in people who can afford to set up their own home rather than remain with family or share with friends), and an increase in life expectancy. It is expected that people will continue to live longer and that more people will live on their own.
- On the basis of these factors of population change, and allowing for a modest decline in the rate of falling household size, estimates of the increasing number of households can be made and related to population projections. Assumptions have been based on the premise that each additional household represents an increase in demand for one home.
- A combination of population modelling, using the 2011 Census figures and average household size modelling, has been used to estimate housing requirements
forJerseyfortheremainderoftheJerseyPlanperiod (3) Thisbasedatagenerates
- Jersey household projections 2013 release Jersey population projections 2013 release and Interim Review Residential Land Availability (January 2013
estimations of housing requirements of 1,000 homes between 2013 - 2015 and 1,300 homes for the period 2016 - 2020. This gives a total requirement, generated by population change of 2,300 homes during reminder of the Plan period to 2020.
- Table 6.1 shows the sources of this increase in the number of households, broken down into two remaining periods of the Plan.
| Period 1 2013-2015 | Period 2 2016-2020 | Totalchangeover 8 years |
Reduced household size(4) | 600 | 600 | 1,200 |
Net inward migration | 450 | 750 | 1,200 |
Households to communals | -50 | -50 | -100 |
Total | 1,000 | 1,300 | 2,300 |
Table6.1 Housingrequirementsestimatedfrompopulationmodelling(Source:StatesStatistics Unit)
Housing aspirations
- In additionto the 'bare'statisticalanalysisand assumptionsaboutpopulation change and changes in household size, there is a need to consider other factors, such as people's housing aspirations and their ability to realise them, when considering housing requirements.
- The 2012 Housing Needs Survey(5) is the latest in a series of surveys aimed at establishing potential housing requirements based upon people's expressed
aspirations. (6).
Affordability
- Since the approval of the 2011 Island Plan a further round of housing needs assessment has been undertaken: the results of the 2012 Housing Needs Survey showed that there was a potential net shortfall of more than 400 dwelling units of social rented housing for the upcoming three-year period 2013-2015. This net shortfall was driven by a need for 2-bedroom dwelling units.
- The component of the increase shown as "reduced household size" in Table 6.1 primarily arisesfrom the disaggregationofexistinghouseholds,i.e. it constitutesaconcealedor "latent" component of future demand.
- Jersey's Housing Assessment 2013-2015 (Nov 2012) Statistics Unit
- This data will be updated through an update of the Housing Needs Survey to be undertaken in 2014 and information derived from the Housing Gateway, managed by the Housing Department.
- The magnitude of this potential shortfall was in close agreement with that implied by the latest (early 2013) Housing Department waiting list for social housing derived from the department's Affordable Housing Gateway.
- Previous rounds of the Housing Needs Survey (2000-2008) had recorded potential net surpluses of social housing, suggesting that the demand for social rented housing has increased in recent years. This latest demand includes that fromkey workers,definedas 'licensed'employeesworkingin the publicsectorand in private sector education and health services.
- The 2012 Housing Needs Survey also indicated a potential net shortfall of approximately 100 owner-occupier 1-bedroom dwelling units after application of affordability criteria based on household income and property prices.
- Combining the shortfalls in social housing and owner-occupier accommodationgeneratesanestimatednetshortfallofsome500unitsofaffordable 1- and 2-bedroom accommodation across these tenure categories for the period 2013-2015.
- Whilst there is no definitive estimation of demand beyond 2015, it is consideredreasonabletoassumeasimilarlevelofdemandofatleast500affordable homes for the second half of the Plan period at this time, as originally identified in the 2011 Island Plan. The States Statistics Office has further suggested that the change in housing qualification period will potentially increase demand for affordable homes between 2016-2020 yet further, placing more pressure on the demand for affordable housing. More definitive data will be provided by further rounds of the Housing Needs Survey from 2014 onwards.
Impact of economic climate
- Theoveralldemandfordwellingunits,drivenby reducedaveragehousehold sizeandnetinwardmigration,isexpectedtobelargelyunaffectedbytheprevailing economic climate. This premise is supported by the results of the four rounds of the Housing Needs Survey which have been undertaken (in 2000, 2005, 2007 and 2012) at substantially different points in the Island's economic cycle with little observable impact on overall demand. The tenure of demand is, however, more susceptible to the economic climate.
- The Jersey economy continuesto be affected by globaleconomic downturn. As a consequence, higher unemployment, a reduction in finance employment, reduced job security, weak earnings growth, reduced availability of credit and lowerinwardmigrationhaveaneffectonthedemandfordifferenttypesofhomes: as stated above, the demand for social rented homes has increased in recent years.
Total demand
- On the basisof populationmodellingand housingaspiration,moderatedby considerations of realistic affordability (7), it is estimated that 3,300 homes are
required over the remaining Plan period 2013 to 2020 (an average requirement of 412 dwellings per year), of which 1,000 should be affordable housing (an average requirement of 125 dwellings per year).
Demand Element | Dwellings Required 2013-2015 2016-2020 | Total (2013-2020) |
Estimated additional dwelling requirements | 1,000 1,300 | 2,300 |
Affordable Housing Requirement (based upon 2012 Housing Needs Survey) | 500 500 | 1,000 |
Total | 1,500 1,800 | 3,300 |
Table 6.2 Total demand for housing over the period 2013-2020
Future updates
- Theplanned2014HousingNeedsSurveywillenablefurtherrefinementand updating of the estimate of overall demand and its distribution by dwelling size and tenure. The development of the States of Jersey Affordable Housing Gateway will monitor and assess applicants for social and affordable housing requirements and will also be crucial to understanding the latest housing needs. All these information sources will be used in the monitoring and potential updating of the key housing policies so that this Plan remains flexible and responsive to demand and supply changes over the remainder of the Plan period.
- Housing Affordability in Jersey 2012
Supply of homes
- In terms of the supply of homes, the current housing stock comprises approximately45,000dwellings, (8)themajorityofwhichareowneroccupied. The States is a major provider and manager of housing, owning some 4,500 dwellings for social rental(9).
- Over the last decade, an averageof around 500 dwellingshave been added to the housing stock each year, varying from 865 in 2002 to only 200 in 2010 (10)
- The 2011 Island Plan set out a requirement of 4,000 homes during the 10 year Plan period, of which 1,000 were required to be for Category A homes.
- The 2011 Plan envisaged that during the first five years of the Plan (2011-2015)it would deliver400 Cat A homes and just over 2,000 CategoryB homes.
- The performance of the Plan in meeting these targets, over the short time since its approval, has been monitored in the Residential Land Availability Report at January 2012 together with preliminary work undertaken to prepare the same report at start of 2013. This reveals:
148 Cat A homes (net) were completed during 2011-12
In addition, 256 units had planning and/or building permission and 146 were recorded as being under construction at the start of 2013.
800 Category B homes (net) were completed in 2011-12
In addition, 1,915 units had planning and/or building permission and 484 were recorded as being under construction at the start of 2013.
Anticipated supply of homes 2013-20
- Over the remaining period of the Island Plan, it is anticipated that homes willbe providedfroma rangeofsourcesincludingtheStates,parishesand housing trusts as well as the private sector. The principal source of supply is envisaged as being through private sector 'windfall' residential development which will include
- estimate prepared by Statistics Unit on basis of 2011 Census @ 44,698 dwellings. Private dwellings, as measured by the census, are not necessarily separate physical dwellings; in the Census separate dwellings were identified where the occupants shared a living space and a cooking area and may not necessarily correspond to a dwelling with a separate entrance. For example, a lodger in a private household was counted as living in a separate dwelling if there was a separate living space and cooking facilities for their own use.
- States of Jersey Housing Department stock as at January 2013
- 2012 land Availability Report (https://www.gov.je/Government/Pages/StatesReports.aspx?ReportID=826)
conversions, redevelopment and infill development within the Built-up Area boundary throughout the Island in accord with Spatial Strategy and other developments outside of the Built-up Area where policy allows.
- In addition to this, the Plan sets out a policy framework that seeks to enable the supply of homes - in particular Category A affordable housing - over the Plan period.
- Policy H1: Category A affordable housing sites
- It is envisaged that over 1,100 Category A affordable homes will be delivered over the Plan period on both land owned by the States that it proposes to be redeveloped to provide homes, and also on private land that is specifically zoned for this purpose.
States owned sites
- This Plan recognises that States owned land that is deemed to be surplus to requirements can make an enhanced contribution to meeting identified requirements for affordable housing, particularly in the short-term. The control which the States of Jersey has over these sitesisanadvantageinthattheycanbebroughtforwardfordevelopment in response to an immediate need.
- Two States-owned sites are identified for redevelopment to provide affordable homes in whole or in part. Their redevelopmentcould also serve as a potential catalyst for the residential regeneration of St Helier (as set out at Objectives BE1 and BE2) and contribute to economic recovery;
Former Jersey College for Girls, Rouge Bouillon, St. Helier Summerland and Ambulance Station, Rouge Bouillon, St. Helier
- ThefollowingStates-ownedsitemayalsobecomeavailableduring the Plan period and its redevelopment for affordable homes (in whole or in part) could contribute additional supply. Potential yield from this site has not been included in estimates of supply at this stage as its status is not definitive.
La Motte Street Youth Centre, St. Helier
Private rezoned land
- The rezoning of private land to deliver affordable homes was explicitlyexcludedfromtheoriginal2011IslandPlanwithrelianceplaced instead on a delivery mechanism which sought the delivery of affordable homes as a proportion of private residential development (Policy H3). For a variety of reasons (as set out in the Affordable Housing section) this policy mechanism is now set aside and there is a need for those affordable homes, which would have been delivered by Policy H3, to be sourced differently. It is on this basis that it is proposed to zone a number of sites in private ownership to deliver affordable homes.
- Thesitesdefinedforthispurposehavebeenpreviouslyconsidered as part of the 2011 Island Plan Review and featured in either the draft Island Plan (Sept 2009) and/or at the draft Island Plan Examination in Public,wheretheywereallreviewedbyindependentplanninginspectors.
- There are four sites proposed for the delivery of Category A affordable housing, and it is envisaged that these will deliver over 290 homes on a total of approximately 18 acres (40 vergées) of land;
DeLaMareNurseries,LaRueaDon, Grouville (2.5acres/6 vergées)
Samares Nursery, La Grande Route de St Clement, St Clement, (10 acres/22 vergées);
Le Quesne Nurseries, La Rue de Jambart , St. Clement (4 acres/9 vergées)
Longueville Nurseries, New York Lane, St Saviour (1.5 acre/3 vergées);
- Draft site assessments are set out at appendix B.
- Re-develop existing States-owned housing land
- In the 2011 Island Plan it was envisaged that the regeneration of outworn States of Jersey Housing Department estates might result in a net loss of homes (c.-300). It is now estimated that during the Plan period there is likely to be an increase in the total number of housing units delivered by the planned re-development and upgrading of these housing estates. This could result in the development of a net increase of 400 homes over the Plan period. No planning policy intervention is required to rezone these sites as they are already in use for the provision of affordable homes.
- In accord with the principles of making best use of scarce resources, however, the potential to increase the stock of affordable homes by redeveloping them at optimum densities will be required in accord with Policy GD 3 'Density of development'.
- The sites identified as likely to come forward by 2015 include:
Le Squez, St Clement - Phase 2c, 3 & 4 - (56 units) 2-4 Journeaux Street, St. Helier - (9 units)
Le Coin, St Helier - (23 units)
Belle Vue, St Brelade - Phase 1 (35 Units)
- The sites identified as likely to come forward by 2020 are:
Belle Vue, St Brelade - Phase 2 (47 units)
Ann Court, St Helier - (circa. 190 units)
La Collette Low Rise, St Helier - Phase 1 & 2 - (circa. 100 units)
- Policy H2: Other Category A sites
- Only one site from the 11 Category A housing sites designated under Policy H2 of the 2002 Island Plan, does not presently have planning permission. This site is expected to be developed for Category A homes before 2015 (see other category a housing sites).
Field 873, Bel Royal St Lawrence (12 units)
- In July 2008 the States approved an amendment to the 2002 Island Plan (11)to enablethe provisionof land forhousingon eightnew sites,involving
an area of land of approximately 58.5 vergées. Three of these sites rezoned forhousingin2008areeitherunderconstructionornearcompletionandthey will deliver 155 category A homes before 2015 and contribute to the supply of Category A affordable homes during the remainder of the Plan period;
- P75/2008 Island Plan (2002) Amendment: provision of land for lifelong dwellings (for people over 55) and first-time buyers, 16 July 2008
- Policy H5 - Rural centre housing
- The spatialstrategyin thisPlanidentifiesthe potentialneed to protect and support the viability and vitality of Jersey's parishes. To this end, the Plan acknowledges that there may be a justifiable need for some limited, small-scale residential development on greenfield land in or well-related to existing rural centres.
- Two sites have been identified for rezoning under Policy H5: Housing in Rural Centres to support this objective and it is estimated that the development of these sites, over the remainder of the Plan period, could provide a total of (circa) 50 units;
Field 785, La Rue des Cosnets, St. Ouen
Field 402, La Grande Route de St Martin, St. Martin
- Further sites may also come forward over the life time of the Plan, which are not estimated in this source of supply, and Policy H5 provides the mechanism to achieve such development. Any proposal for the rezoning of land outside the existing defined Built-up Area boundary, contained within a Village Plan, would require the approval of the States as a draft revision of the Island Plan(12)
- Any proposals to provide affordable housing outside the defined settlement boundary of a rural settlement that are submitted as a planning application would represent a departure from the Plan and be treated accordingly.
- Windfall developments in town of St Helier
- St.Helierhastraditionallybeentheprincipalsourceofsupplyfornew homes accounting for around half of all developments between 2002-2010.
- Article 4 of the law states that the designation of land for particular development or use should be set out in the Island Plan and Article 3 of the law sets out exacting procedures for public engagement for an Island Plan or a revision of it.
- A study of the capacity of the town(13) demonstrates that it has the maximumpotentialcapacitytodeliverbetween2,000-3,600additionalhousing
units. The potential maximum yield of 3,600 homes has been discounted to whatarebelievedtoberealisticlevelsofyieldprovidingatotalcapacityand
potential supply of 1,500 homes(14)
- Since the approval of the 2011 Island Plan, approximately 400 units have been delivered (2011-12) from windfall developmentsin the town of St. Helier , however the remaining supply is still based upon the average of 150 units per year, leaving an expected supply of 1200 units up to the end of the Plan period.
- Windfall developments outside of town
- It is estimated that approximately 1,500 'category B' dwellings will come forward on other windfall sites' outside of the town, which cannot be individually predicted at this stage. This windfall source includes dwellings on sites within the Built-up Areas, in addition to conversions and small developments in the countryside. The projections are based on past trends, discounted to account for a decline in the availability of infill plots within settlementboundaries.Between 2002 and 2012 such developmentsaccounted for an average of 250 homes/annum. A reduced figure of 150 per annum is used to estimate future windfalls because it is considered the opportunities for re-development within the Built up Area will diminish over time.
- Since the approval of the 2011 Island Plan, approximately 400 units have been delivered (2011-12) from windfall developments outside of town, however the remaining supply is still based upon the average of 150 units per year, leaving an expected supply of 1200 units up to the end of the Plan period.
- It is considered that provision for non-qualified dwellings (lodgings, staff accommodation or registered lodging homes) will be provided by development or redevelopment, predominantly within the Built-up Area (in accord with housing development within the built up area; registered lodging accommodation; and staff and key agricultural worker accommodation).
- On the basis of the above, the provision made in the Island Plan for the supply of new homes is set out in the following table.
- Town Capacity Study (October 2007) Planning and Building Services, Planning and Environment Department
- A development yield of 40% of sites has been assumed at an appropriate density relative to each site, providing a total capacity and potential supply of 1,500 'category B' homes.
Delivery Period
2013-2015 2016-2020
Supply Total
Category Category Category Category A B A B
Policy H1 - States
40 150 200 0 390 Category A owned
Housing sites
Re-zoned 0 0 290 0 290
Re-develop existing
States owned housing 125 0 275 0 400 sites
Policy H2 - Other
170 0 0 0 170 Category A housing sites
Policy H5 Rural Centres
20 0 30 0 50 (HousinginRuralCentres)
Windfall developments
0 450 0 750 1200 from town of St Helier
Windfall developments
outside of town of St 0 450 0 750 1200 Helier
Total 355 1,050 790 1,500 3,700
Table 6.3 Supply of homes 2013-20
Provision of homes
- The aim of the Island Plan is to make provision for sufficient land and opportunities to meet, as far as possible, the anticipated requirements for homes over the Plan period.
- On the basis of an assessment of estimated demand against anticipated and planned supply, it is considered possible to balance identified requirements for new homes over the Plan period with sufficient supply from existing sources (e.g. existing planning permissions and windfall developments) and from planned sources of supply, including new Category A affordable housing sites, within the Island Plan's overarching strategic policy framework and specifically its Spatial Strategy, which seeks to focus development largely on already-developed land.
- The net housing supply over the Plan period is summarised in table Net Housing Supply 2013-20.
Housing Category | 2013-15 Total Total Demand Supply | Period 2016-2020 Total Total Demand Supply Net | Net | Total 2013-2020 Total Total Demand Supply Net |
Category A | 500 355 | -145 500 790 | +290 | 1,000 1,150 +150 |
Category B | 1,000 1,050 | +50 1300 1500 | +200 | 2,300 2,550 +250 |
Totals | 1,500 1,405 | -95 +1,800 +2,290 | +490 | 3,300 3,700 +400 |
Table 6.4 Net Housing Supply 2013-20
- Provision has been made for as many as 3,700 homes over the remainder of the Plan period. In overall terms, this would suggest that the strategy of the Plan, relative to housing land availability, is reasonably healthy, with a small predicted surplus of 400 units over the Plan period.
- The average build rates required to meet the demand for housing over the remainder of the Plan period is about 412 dwellings per annum which is less than the average rate of residential development delivered since 2002 (2002-2012) of over 500 dwellings per annum.
- It is considered that the level of anticipated provision over and above the levelofestimateddemandisprudent,reasonableandjustifiablegiventheestimates and assumptions upon which the forecasts are made in addition to the challenges that remain to ensure delivery of the homes required, some of which are set out below. Moreover, the potential surplus (of +290 units) of Category A affordable homes in the latter half of the plan, is considered to be justifiable and prudent having regard to the potential for increasing demand for affordable housing as currentlynon-qualifiedhouseholdsmovingintothequalifiedsectorinthenext3-5 years, indicated in the 2012 Housing Needs Survey and to offset an anticipated shortfall in the period 2013-15.
Release of land for development
- It needs to be acknowledged that the Island Plan's Spatial Strategy, which seekstoconcentratenewdevelopmentoverthePlanperiodintheIsland'sBuilt-up Area, and particularly St Helier, is dependent upon the release of land and the realisation of development opportunities in the Island's urban areas. A number of assumptions, based on evidence and trends, have been made about the potential for land to be developed for housing, but the Plan can only encourage the release
of these sites through a policy framework which supports their use for the provision of new homes: the Plan cannot require sites to be released and the current economiccircumstancesmaymilitateagainstthereleaseoflandfordevelopment.
- To ensure that Category A affordable homes are delivered, the Plan makes provision, at policies H1, H2 and H5, for those sites specifically zoned for this purpose to be compulsorily acquired by the States of Jersey to enable the delivery of homes, should they fail to be brought forward for development during the Plan period.
- To give effect to a policy of compulsory purchase, separate decisions of the States of Jersey would be required in accord with the procedure established
by law (15).
Density of development
- There is also a need to ensure that land is developed at more efficient and higher densities of development than have previously been achieved, in accord with Efficient Use of Resources and Density of Development.
- Whilst the principle of providing a higher density of development is easily accepted,therealityofdeliveringhigher-densitiesofdevelopment'ontheground' can be more challenging, where there is a need to ensure that new development respects the existing character of the area. Perhaps more significantly, local residents and neighbours are often resistant to higher density development on the basis that this will lead to a greater quantum of development, with associated perceptions of a more significant impact of new development on local and private amenity; more and bigger buildings; and increased traffic generation, to the fore of issues raised against the approval of more efficient development schemes.
- Whilst these are all issues that can be addressed through planning and design, the reality of realising higher densities of development needs to be acknowledgedrelativetoestimationsofhousingyield.Itisimportanttorecognise, however, that unless higher more land-efficient densities are generally realised on all development sites, in accord with Efficient Use of Resources, it will not be possible to meet all the identified needs for housing without zoning additional housing sites: this would inevitably result in the further loss of greenfield land.
Delivery of affordable homes
- The delivery of affordable homes is always the most challenging aspect of meetinghousingdemand.Onthebasisofthecurrentandanticipatedfutureneeds for affordable housing, as evidenced by the HNS 2012 and the Affordable Housing Gateway, the Island Plan will seek to deliver Category A affordable homes specifically for the purposes of social rent or affordable homes for purchase on
- Compulsory Purchase of Land (Procedure)(Jersey) Law 1961
land within its ownership and on privately-owned land specifically zoned for this purpose. The tenure of the homes to be provided on these sites will be regulated through the award of planning permission and planning obligation agreements.
- Access to the homes, whether they are managed by the States of Jersey HousingDepartmentorotherprovidersofsocialhousingsuchashousingassociations and the parishes, will be managed by the States of Jersey Affordable Housing Gateway. This will ensure that they are occupied by householdswhose needs cannot be met by the open housing market.
- Clearly, ultimate control over access to homes can be best achieved through ownership of the land and will not be an issue on States-owned land. There remains the option for Jersey Property Holdings on behalf of the Housing Department, or for other social home providers, to seek to enter into discussions with landowners to secure options on any other land zoned for the provision of affordable homes.
- On the basis of these considerations, the Minister for Planning and Environment considers it prudent to ensure that the level of anticipated housing supply is sufficient, even to the extent where a small surplus of supply might be secured in the latter half of the Plan period.
Proposal 20
Provision of homes
The Minister for Planning and Environment will make provision for sufficient land and opportunities to meet the requirements for homes over the Plan period.
The Plan makes provision for 3,700 homes to be built over the Plan period, comprising:
1,150 Category A homes; 2,550 Category B homes.
Longer term perspective
- The requirements beyond the current Plan period, as identified in the ImagineJersey2035reports,andfurtherresearchandremodellingofthepopulation model carried out by the Statistics Office, indicates that additional dwellings will be required up to 2035. This will need to be carefully monitored in order to properly plan for the longer-term should the current sources of supply be insufficient, which might involve the further release of greenfield land or relocating St Helier's commercial port which would create further urban development opportunities.
- It is also critically important to recognise that the underlying basis for medium and long term housing forecasts, and hence the role of the planning system in housing delivery over these time-scales, will not have been radically changed by the current economic circumstances as a result of the 'credit crunch'. It is considered that a fall in short-term housing demand does not justify a consequent reductionin the forwardland supplyfor housing– deliveredthroughzoningof land and windfall opportunities. The supply of land to meet underlying need suggests that the medium to long-term targets should not change.
Monitoring
- It is vital that annual monitoring of the housing situation is undertaken to assess the performance of the Plan relative to estimates, assumptions and stated objectives in order that the Plan might be able to respond flexibly in response to changing circumstances and new evidence, particularly with regard to the provision of housing.
- The Minister for Planning and Environment will prepare and publish a Residential Land Availability Report which will assess whether the targets for housing completions from all sources are being met. Each Residential Land Availability Report will include an update of housing performance, setting out the number of homes actually completed and providing an estimate of the rate at which anticipated housing completions will come forward in the future.
- The Residential Land Availability Report will inform future reviews of planning policy or strategy related to the demand for and supply of housing, based on the need to maintain a five-year supply of housing land.
- Given the reliance of the housing strategy in the Plan upon the delivery of affordable homes on States-owned land, it is important that this source of supply 'performs' in accord with targets for completion. In the event that the supply of affordable homes from this source is not satisfactory, and, in particular, if substantial progress has not been made on the Summerland/Ambulance station site by the start of 2016, the Minister may seek to bring forward other, readily implementable alternatives requiring a further review of the plan.
Category A affordable housing
- Jersey has a number of particular challenges around the delivery of affordablehousing:inasmallisland,landwillgenerallyhaveahighervalueplaced upon it; construction costs can be comparatively high; and on-average higher income levelshave led to an expensivehousingmarket. As a resultmany households cannotaffordthecostofhousinginJerseyandneedsomeassistancetomeettheir housing needs.
- The Minister for Planning and Environment has sought to specifically zone land for the provision of category A affordable homes to help meet this need. To ensure that the homes provided are truly affordable, the Minister for Planning and Environment also wishes to encourage innovation in construction methods and to explore alternative methods of ownership and housing delivery.
Category A affordable housing sites
- The requirement to specifically zone land for Category A affordable homes is addressed, within the context of overall housing land supply, in the preceding section Provision of homes: it is essential for helping to ensure the provision of Category A affordable homes to meet identified requirements in the Plan period.
- The identification and assessment of sites which could help meet this requirement has been carried out in accordance within the strategic policies of the Plan, particularly Spatial Strategy and Efficient Use of Resources, which support the delivery of a more sustainable pattern of development in Jersey. It has also involved an assessment of other factors, such as site constraints, site context and character, and existing land uses, to inform a planning assessment of each site.
- The actual number and size of homes on each site will be determined through the planning process, involving the preparation of a housing development brief for each site, to be approved by the Minister for Planning and Environment andissuedassupplementaryplanningguidance.Thedevelopmentbriefswillguide the delivery of homes on these sites and may address the following issues:
appropriate mix of types and sizes of homes
the provision, as appropriate, of specially designed homes to suit specific requirements of the elderly
design matters including density, form, landscape works, and materials relationship between the proposed development and neighbouring uses and the local character of the surrounding area
access by car, cycle and pedestrians and links to bus routes within and in the vicinity of the site
provision of car parking
provision of service infrastructure
requirements for amenity space and public open space; and
the need for social, community, education and health facilitieswithin the site and implications for off-site facilities.
States-owned sites
- The use of States-owned land to help meet the need for affordable homes isidentifiedasaclearpolicyobjectiveoftheStatesofJerseyDevelopmentCompany
(16). A number of States-owned sites, within the Built-up Area, have been identified as having the potential to contribute, in whole or in part, towards the clear and immediate need for affordable homes over the Plan period and are already the subject of development briefs and planning applications: others may emerge as States departments and Jersey Property Holdings review property portfolios.
- The extent to which all or some of these States-owned sites contribute to thisneedwillbedetermined,throughagreement,betweentherespectiveMinisters, havingregardtothepublicbenefittobederivedfromotherformsofdevelopment on these sites.
- Some of these States-owned sites presently remain in active use and the timing of their release, and their potential to contribute towards the need for affordable homes, cannot be definitively known at this time.
Private rezoned land
- There are four sites proposed for the delivery of Category A affordable homes. The sites have been previously considered as part of the 2011 Island Plan Review and featured in the draft Island Plan (Sept 2009) and/or at the draft Island PlanExaminationinPublic,wheretheywereallreviewedbyindependentplanning inspectors.
- They are zoned for the purpose of delivering 80% Category A social rent affordable housing and 20% Category A affordable housing for purchase on each site. This tenure split reflects housing need based on evidence provided by the 2011 Housing Needs Survey. The proposed tenure split will only change following further evidence from a future housing needs survey and any change may be required to have the approval of the States of Jersey.
- To optimise the use and development of land, in accord with Efficient Use of Resources and Density of Development, these sites should be developed at their optimum densities, having regard to matters of design, context, character and potential social and environmental impact of the scale of development envisaged.
- Site assessments have been undertaken, which are found in appendix B of this document, and these provide details of the potential range of densities potentially achievable on each of these sites and other planning issues.
- See statements of the Minister for Treasury and Resources during debate on P.32/2011 (07 June 2011).
Policy H 1
Category A affordable housing sites States-owned land
To assist with and contribute to the provision of affordable homes the following States-ownedsites,whicharealreadyidentifiedfordisposal,willbedeveloped, in whole or in part, to provide affordable homes:
- former Jersey College for Girls, Rouge Bouillon, St. Helier ;
- Summerland and Ambulance HQ, Rouge Bouillon, St. Helier
Other States-ownedsites, shouldthey be deemed to be surplusto requirements during the Plan period, may also be developed, in whole or in part, for the purposes of providing affordable homes, including:
- La Motte Street Youth Centre, St. Helier
Private land
Other sites, currently in private ownership, listed below and shown on the Island Proposals Map, comprising a total of approximately 18 acres (40 vergées) of land, are zoned for the purpose of delivering 80% Category A social rent affordable housing and 20% Category A affordable housing for purchase on each site. Planning permission for other forms of development will not be approved.
Where necessary, the sites will be acquired by the States on behalf of the public, if needs be by compulsory purchase, in order to ensure that they are brought forward for the development of affordable homes.
- De La Mare Nurseries, La Rue a Don, Grouville (2.5 acres/6 vergées)
- Samares Nursery, La Grande Route de St. Clement, St. Clement, (10acres/22 vergées);
- Le Quesne Nurseries, La Rue de Jambart ,St. Clement (4 acres/9vergées)
- Longueville Nurseries, New York Lane, St. Saviour (1.5 acre/3 vergées);
The development of Category A social rent affordable housing and Category A affordable housing for purchase on each site will be regulated through the award of planning permission and planning obligation agreements.
The potentialnumber and type of homesthat could be providedon thesesites will be considered in development briefs to be issued, as supplementary planning guidance, by the Minister for Planning and Environment.
Access to all Category A affordable homes shall be controlled and managed though the States of Jersey Affordable Housing Gateway and all social rent affordablehomesaretobemanagedbyaStatesofJerseyapprovedregistered social landlord.
Previously zoned Category A housing sites
- The adopted 2002 Island Plan designated 11 sites for the purposes of meeting the need for Category A housing (under policy H2, Sites to be Zoned for
CategoryAHousing)andallbutoneofthesesites(17) hasbeendeveloped.Planning permission is being sought for the development of the remaining site (Field 873,
St. Lawrence) on the basis of the original zoning proposition, requiring a proportionate tenure split of 45% social rent and 55% first-time buyer homes or lifelong homes for purchase.
- Intheeventthatanticipatedorextantplanningpermissionfordevelopment on this site fails to be implemented before the expiry of extant or anticipated consents, it is however, considered reasonable that it's zoning delivers homes based onthecurrentassessmentofneed,whichwouldrequire80%CategoryAsocialrent affordable housing and 20% Category A affordable housing for purchase to be provided.
Policy H 2
Other Category A affordable housing sites
The following previously rezoned site, listed below and shown on the Island Proposals Map, is zoned for the purpose of delivering 80% Category A social rent affordable housing and 20% Category A affordable housing for purchase on site. Planning permission for other forms of development will not be approved.
Where necessary, the site will be acquired by the States on behalf of the public, if needs be by compulsory purchase, in order to ensure that it's brought forward for the development of affordable homes.
1. Field 873, Bel Royal, St Lawrence (0.9 acres/ 2.0 vergées);
- Field 873, Bel Royal, St Lawrence (0.9 acres/ 2.0 vergées)
The development of Category A social rent affordable housing and Category A affordable housing for purchase on this site will be regulated through the award of planning permission and planning obligation agreements.
The potential number and type of homes that could be provided on this site will be considered in a development brief to be issued, as supplementary planning guidance, by the Minister for Planning and Environment.
Access to all Category A affordable homes shall be controlled and managed though the States of Jersey Affordable Housing Gateway and all social rent affordablehomesaretobemanagedbyaStatesofJerseyapprovedregistered social landlord.
Affordable housing
- In 2008, the Minister for Planning and Environment commissioned Kelvin MacDonald Associates to research the potential for the procurement of affordable homes by requiring their provision as a proportion of private housing developments, orthroughcommutedpaymentsinlieu,andtoproposeapolicyframeworktobring
thisabout. OneoftheconclusionsoftheMacdonaldreport (18) wasthatthenature of the problem of affordability in Jersey was such that every method of providing
affordable housing must be employed and that the provisions of planning legislation and guidance must be implemented. Following the Macdonald report recommendation a new policy mechanism requiring affordable housing to be provided as a proportion of private housing development was approved by the States in the 2011 Island Plan: Policy H3 (Affordable Housing).
- Whilst the States approved the policy its implementation was held pending further consultation, specifically with the development industry, around the mechanism to be used to operate the policy and particularly to assess viability. The Department of the Environment developed draft supplementary planning guidance, with advice from affordable housing specialists, and has undertaken extensive consultation with the development industry.
- Itisclear,fromtheengagementundertakenduringtheIslandPlanReview and following the approval of the Island Plan, that the development industry and landowning interests remain fundamentally opposed to the principle of Policy H3 and that serious concerns exist that land may not be brought forward for development, especially given prevailing economic circumstances.
- Achieving Affordable Housing as a Proportion of Private Housing Development (June 2009) Kelvin Macdonald MCIH, FRTPI, FRSA
Viability
- The Council of Ministers is extremely concerned to support the delivery of housing across all tenures in Jersey at all times, but particularly in the current economic downturn. Ministers agree that a policy requiring the provision of affordable homes as a proportion of private housing developments could prevent land from being brought forward for residential development, which would then undermine the delivery of affordable homes and adversely affect the construction industry. Because of these concerns over viability and the risk that land owners may not bring sites forward for development the Council of Ministers, therefore, no longer supports the implementation of Policy H3 of the 2011 Island Plan and it is to be set aside.
- Work will continue to be undertaken to research and develop alternative policy mechanisms to capture value from the development of land to support the provision of affordable homes which does not have the same risks associated with it. A Working Group comprising the Ministers of Treasury and Resources, Planning and Environment, Housing and Economic Development has been set up to progress this and it will be undertaken as part of the review of property tax in the States Treasury. This is expected to be completed in the second half of the Plan period and so no supply considerations have been made from this policy proposal.
Proposal H3
Affordable housing proposal
Thepolicyrequiringtheprovisionofaffordablehomesasaproportionofprivate housing developments is set aside.
Workwillbeundertakentoresearchanddevelopalternativepolicymechanisms to capture value from the development of land to support the provision of affordable homes. A Working Group comprising the Ministers of Treasury and Resources,PlanningandEnvironment,HousingandEconomicDevelopmenthas been set up to progress this.
Housing mix
- If the Island's housing needs are to be met, it is vital that new housing development provides the type and size of homes that are needed.
- It is therefore considered legitimate for intervention in the type and size of property to be developed through the introduction of a planning policy related to the mix of housing to be secured in all residential developments. Accordingly,
thehousingmixpolicyseekstopromoteabalancedmixofdwellingtypesandsizes to meet the identified requirements, based on the latest available evidence, on all residential development sites.
- The currentHousing Needs Survey provides estimates of anticipated surpluses and shortfalls in houses and flats, by size and tenure over a fixed period and the Minister for Planning and Environment, will assess the prevailing housing needs of the Island based upon on this evidence of housing needs or an equivalent States approved publication.
Policy H4
Housing mix
Proposals for all new residential development are required to contribute towards the need for specific types and sizes of home, relative to the latest publishedevidenceofneed.Theextenttowhichaplanningapplicationmeets thepublishedevidenceofneedwithrespecttohousingmixwillbeanimportant material consideration in the grant or otherwise of planning permission.
In assessing the contribution of residential development proposals to meeting the Island's need for homes of a specific size and type, the Minister will have regard to the nature and location of the site, its context and the character of the area.
Theprovisionofhousingtomeetspecialrequirementsandstaffaccommodation shall be exempt from the requirements of this policy.
Affordable housing in rural centres
- There is recognitionthat there is a need to protect the viability and vitality of Jersey's rural settlements, as defined in the spatial strategy (Picture 2.1 'Settlement Types'). Here, it is acknowledged that limited, small-scale affordable housing development may be important not just to provide homes but in supporting and enhancing the critical mass of, and diversity in, the local parish population, tosustainschools,shops,pubs,publictransportandotherfacetsofparishlifethat are unique and important to Jersey.
- It is not envisaged that the scale of development or provision of affordable homes in or around rural settlements would be large and any development should be appropriate in scale and character to the settlement context and setting of the site, whilst seeking to ensure the optimum density of development. It is currently
envisaged that the total number of affordable homes to be delivered through this policy would amount to no more than 50 units over the remainder of the Plan
period(19), although it is accepted that other proposals may emerge.
- Proposedsitesfornewaffordablehousingdevelopmentinruralsettlements should be well-related to the settlement boundaries, within close proximity to public transport routes, and have easy access to other facilities. Any proposed development for affordable housing in rural locations located where there is no access to facilities or a choice of modes of transport, is unlikely to be favourably considered.
- Homesprovidedbythispolicywillberequiredtocontributetotheprovision of affordable homes to meet the Island's housing needs with access controlled and managed through the States of Jersey Affordable Housing Gateway: links to the parish may also be a relevant consideration as part of this assessment.
- The following site has already been identified to support this policy objectiveandisspecificallyzonedforthepurposesofprovidingaffordablehomes:
1. Glasshouse site, Field 785, St Ouen (1.5 Acres/3.5 vergées).
- The following site has also been identified to support this policy and is specifically zoned for the purposes of providing affordable homes subject to the preparation of a village plan, which must consider alternative sites and opportunities, and be adopted by the Minister for Planning and Environment. In the event of other alternative(s) sites coming forward in St. Martin , this site (field 402) would be no longer zoned for the provision of homes:
1. Field 402 St Martin (1.5 Acres/3.5 vergées);
- Otherproposalsfornewaffordablehousinginoraroundruralcentresmay form part of a Village Plan. Any such Village Plans would be required to be developed by the parochial authority but be subject to a full and comprehensive assessment, including consideration of alternative sites and opportunities, and engagement with the local community and relevant stakeholders, including the relevant regulatory departments of the States of Jersey. Field 622, St Ouen, is one such site that has been put forward by the Parish of St Ouen, and it, or an alternative site may come forward in the future.
- Where Village Plans are to attain formal status as part of the planning framework for the protection and development of one of the Island's rural centres they will require the formal review, approval and adoption by the Minister for Planning and Environment as supplementary planning guidance. In such
- this is in addition to the development of sites already designated for Category A housing (first-time Buyer and homes for the over-55s) in 2008
circumstances, any development proposals in the Village Plan must be consistent with the Island Plan and must relate to and be within the defined Built-up Area boundary for the settlement, as defined on the Island Plan Proposals Map.
- The Minister for Planning and Environment will seek to provide help to Parishes in Village Plans to ensure that they are robust and that, where housing sites are proposed, that alternatives are assessed. The Minister will seek to work withtheParishofSt.Martininrelationtoit'sproposalforField402,andtheParish of St. Ouen , in the assessment of sites, including Field 622, Rue de la Croute.
- Where Village Plans contain a specific proposal for the rezoning of land outside the existing defined Built-up Area boundary, any such proposal would require the approval of the States as a draft revision of the Island Plan(20).
- Anyproposalstoprovideaffordablehousingoutsidethedefinedsettlement boundary of a rural settlement that are submitted as a planning application would represent a departure from the Plan and be treated accordingly.
Policy H5
Affordable housing in rural centres
The Minister will support the provision of affordable housing to support the viability and vitality of Jersey's rural settlements.
The site listed below and shown on the Island Proposals Map, is zoned for the purpose of providing 80% Category A social rent affordable housing and 20% Category A affordable housing for purchase. Planning permission for other forms of development will not be approved.
- Glasshouse site, Field 785, St Ouen (1.5 Acres/3.5 vergées);
The following site has been identified and is specifically zoned for the purposes of providing 80% Category A social rent affordable housing and 20% Category A affordable housing for purchase, subject to the preparation and adoption of a village plan (including a full consideration of alternative sites) by the Minister for Planning and Environment:
- Field 402, St Martin (1.5 Acres/3.5 vergées);
Where necessary, the sites will be acquired by the States on behalf of the public, if needs be by compulsory purchase, in order to ensure that they are brought forward for the development of affordable homes.
- Article 4 of the law states that the designation of land for particular development or use should be set out in the Island Plan and Article 3 of the law sets out exacting procedures for public engagement for an Island Plan or a revision of it.
The development of Category A social rent affordable housing and Category A affordablehousingforpurchasewillbe regulatedthroughthe awardof planning permission and planning obligation agreements.
The potential number and type of homes that could be provided on the site will be considered in development briefs to be issued, as supplementary planning guidance, by the Minister for Planning and Environment.
Access to all Category A affordable homes shall be controlled and managed though the States of Jersey Affordable Housing Gateway and all social rent affordablehomesaretobemanagedbyaStatesofJerseyapprovedregistered social landlord.
Other housing development proposals to support the viability and vitality of Jersey's rural settlements will be permitted, provided that the development:
- is appropriate relative to the existing character of the village; and
- is well-related to the existing Built-up Area and local facilities, services andinfrastructureandwhereprovisionforeducation,leisure,recreation, local shopping, and other community facilities is adequate or can be provided, where required, to meet the needs arising from the proposals.
Meeting other housing demand
- PoliciesH1toH5addressneedhousingandtherequirementsforCategory AaffordablehomesduringthePlanperiod.Themajorityofthehousingsupplyover the Plan period will, however, come forward as 'windfall' development, on sites which are not specifically identified in the Plan for the purpose of providing residential accommodation. The following suite of policies seek to set out the policy framework within which applications for demand housing will be considered.
Housing development within the Built-up Area
- The Island Plan Spatial Strategy designates a hierarchy of settlements which together form the Built-up Area, as defined on the Island Proposals Map. This includes the town of St Helier; eight urban settlements; eleven key rural settlements; and twenty-one small Built-up Areas and small rural settlements.
- The intention of designating a Built-up Area boundary is to contain future development within existing limits and thus prevent encroachment into the countryside. It is often said, however, that there are many small corners of land in the countryside,which couldtakeinfill'developments. On itsown, an individual developmentmightnotappearintrusivebut thecumulativeimpactwouldbe severe for the Island's countryside and also have implications for travel patterns and the cost of providing community and utility services.
- It is, therefore, proposed that the majority of the Island's housing supply over the Plan period will come from development within the Built-up Area on sites which are not specifically identified for housing in the Island Plan. It is important that this new residential development is supported, where it accords with the Spatial Strategy, as it will contribute towards meeting a demand for homes; it will provide greater housing choice; and will also help to sustain and regenerate our urban centres, particularly St Helier.
- Whilst the principle of new residential development in the Built-up Area, in accord with the Spatial Strategy, is supported, proposals for new residential development will need to be assessed relative to their impact on the local environment and neighbouring uses (against Policy GD 1 'General development considerations') and in terms of their quality of design and architecture (against Policy GD 7 'Design quality')
- For clarity, all residential development - including new buildings; conversions; refurbishment; extensions and alterations; and redevelopment - regardless of its location, whether that be within the Built-up Area or in the countryside, will also be required to provide an adequate standard of accommodationinparticular,inrelationtodwellingsize,internallayoutandroom sizesinaccordwithsupplementaryplanningguidancetobepublishedbytheMinister for Planningand Environment.This willbe assessed,alongwith otherconsiderations relating to site density; privacy, daylight and noise; energy efficiency; car parking space; private and public open space; children's play areas; designing out crime; and landscaping, as appropriate, relative to the Minister's guidance.
- Such supplementary planning guidance will also include consideration as to whether there should be any further increase in internal space standards and any further improvements in standards for internal noise and sound insulation of and between units of accommodation.
Policy H6
Housing development within the Built-up Area
Proposals for new dwellings, extensions or alterations to existing dwellings, or changes of use to residential, will be permitted within the boundary of the Built-up Area, as defined on the Island Proposals Map, provided that the proposal is in accordance with the required standards for housing as established and adopted by the Minister for Planning and Environment through supplementary planning guidance.
Suchguidanceis applicableto alldwellings,extensionsor alterationsto existing dwellings, or changes of use to residential.
Such supplementary planning guidance will also include consideration as to whether there should be any further increase in internal space standards and any further improvements in standards for internal noise and sound insulation of and between units of accommodation.
Housing to meet special requirements
- The Minister for Planning and Environment wishes to ensure that new housing will, as far as possible, contribute to the needs of people with disabilities and of those who require care - including the elderly, people with disabilities and other vulnerable people.
- The forecast change in population by broad age groups for the period 2009-2018 (under the +150 heads of households per annum migration scenario) predicts that almost all of the estimated growth will be in the over 60 age group. The proportion of people aged 75+ years will rise by 32% and those aged 85+ years will grow by 36%: this is a dramatic increase in potentially vulnerable elderly couple and elderly single person households. The Housing Requirements Study in 2000 identified that some 16% of households in Jersey contained somebody with a disability and of these, 6% contained someone who was a wheelchair user (approximately 1% of all households)(21).
- These statistics have the potential to pose a considerable challenge in termsof an increaseddemandand requirementforhousingto meetspecialneeds: specialneedshousingisdefinedtoincludenursingandresidentialcarehomes,and shelteredhousing,wheretheresidentialaccommodationmeetstheneedsofvarious groups of people through the provision of varying degrees of support, for rehabilitation and out-of-hospital care.
- Where new facilities are proposed, these should be located within the Built-up Areas of the Town or Key Urban or Rural Settlements as defined in the
Spatial Strategy(22). This should enable non-car access to basic facilities, and help raise the quality of life for residents. It will also be important to consider the
adequacy of and access to local health care facilities such as doctors' surgeries.
- Although 4% of dwellings have been adapted for a disabled person, there is a large mismatch between adapted dwellings and those with disabilities, with only 4% of people with disabilities living in an adapted home. States and parish rental housing and owner-occupied dwellings have the greatest percentage of adapted dwellings, at 8-9%, reflecting the higher proportion of elderly persons within these sectors.
- see 'Sustainable development'
Policy H7
Housing to meet special requirements
Proposals for housing to meet special requirements, including the specific needs of the elderly and those with disabilities, including sheltered accommodation,residentialcareandnursinghomes,willbepermittedprovided that the development;
- meets an identified need;
- is within the Built-up Area boundary;
- is not on land zoned for Category A housing purposes, unless specificallyprovided for in a development brief.
Registered lodging accommodation
- Lodging houses are privately owned properties offering accommodation for occupation by persons who do not possess residential qualifications and who
occupy the accommodation as lodgers, not as tenants. (23). The Lodging Houses (Registration) (Jersey) Law, 1962, as amended, administered by the Minister for
Housing,regulatestheamenitiesofthistypeofaccommodationand licencesit for maximum occupation.
- In order to be registered, a lodging house must meet certain minimum standards laid down by the Minister for Housing(24). Generally, the lodging house
standards adopted by the Minister for Housing are below those that would be required for other residential accommodation established by the Minister for Planningand Environment,under the auspices of supplementaryplanningguidance. This is clearly inequitable, a fact recognised by the States Strategic Plan 2009-2014,
which sets out(25) to 'improve the equity, tenure rights and living standards for accommodation accessible to migrants'. This has also begun to pose a particular
challenge for the planning system as the nature of lodgings has changed from 'serviced' bedrooms to self-contained units of accommodation.
- Accordingly,theMinisterforPlanningandEnvironmentwillseektosecure anenhancementinthequalityoflodgingaccommodationwhereverpossibleinthe conversion of buildings into lodging house accommodation. For new lodging accommodation,applyingthesamestandardsasgeneralhousingwillhelptoimprove
- Lodgers do not have the same legal status as tenants in a number of respects, particularly in relation to security of tenure. Properties offering accommodation for more than a number of lodgers specified by the Minister for Housing (currently five), inclusive of children of any age, are required to be registered with the Minister and are subject to annual re-registration.
- see Lodging Houses (Registration) (Jersey) Law, 1962 for details of current standards
- see States Strategic Plan 2009-2014 pp.29-30, section 14. Adequately house the population
thequalityofthehousingstockinthelodginghousesector.Italsoprovidesgreater flexibility to respond to changes in the aspirations of the immigrant workforce, allowing accommodation to be readily adapted to general-demand housing. The policy regime for new housing development will be applicable to development for the provision of registered lodging accommodation.
Policy H8
Registered lodging accommodation
Proposals for new and conversion of buildings for registered lodging accommodation will be permitted within the boundary of the Built-up Area, as defined on the Island Proposals Map, provided that the proposal:
- meets a proven need for lodging accommodation;
- meets,orinthecaseofconversionsofexistingbuildings,meetsasclosely aspossible,therequiredstandardsforhousingasestablishedandadopted by the Minister for Planning and Environment through supplementary planning guidance.
Staff and key agricultural worker accommodation
- The provision of accommodation to house staff and key workers is particularly important to the Island's agriculture and tourism industries, where they are more reliant on migrant seasonal workers, but is also an issue for other parts of the Island's economy.
- As a general principle, which accords with the strategic polices of the Plan and which reflects the objectives of the States Strategic Plan 2009-2014 to improvetheequity, tenurerightsandlivingstandardsforaccommodationaccessible to migrants, staff and key agricultural worker accommodation should be of an appropriate standard and be within the Built-up Area.
- The labour intensive, often seasonal nature of agriculture and tourism, the locations for which are often in sensitive coastal and/or countryside environments, however, pose particular challenges. Average earnings for workers intheseindustriesareconsistentlyinthelowestofalleconomicsectorsandaccess to the local housing market is, therefore, difficult, in addition to which, both industries tend to operate on the basis of long and unsociable hours. In such circumstances, employers in these industries have traditionally sought to provide some of their own staff accommodationin associationwith existinghotel sites and on farms.
- The general principle must, however, remain that staff and key worker accommodationshouldbeofanappropriatestandardandlocatedwithintheBuilt-up Area: it is, however, recognised that because of the reasons set out above and because of the desire to support and sustain the Island's agriculture and tourism industries in particular, exceptions may be made to permit staff accommodation outside the Built-up Area on the basis of a proven economic need and evidenced business case.
- Where exceptions are made, every effort should be made to ensure that the impact of the provision of staff accommodation on the character of the coast or the countryside is minimised. Accordingly, use should be made, where possible, of any existing buildings on or off the site to provide staff accommodation. Where this cannot be secured, provision should be made through the change of use, rearrangement,subdivisionorextensionofanexistingbuildingonthesiteorlastly through the provision of temporary accommodation. To reduce and minimise their environmental impact, proposals for new temporary buildings should be within or adjacent to the existing farmstead or hotel, or other related buildings on the site, and should be of a size and scale proportionate to the functional need.
- The provision of temporary buildings will also be time-limited to ensure their removal when they are no longer required.
- Staff accommodation should be of an appropriate standard and, where permanent, should meet, as far as possible, that required for new residential development, as set out in the supplementary planning guidance issued by the Minister for Planning and Environment. It is, however, acknowledged that this is unlikely to be viable for temporary buildings which should, as a minimum, meet the standards set for lodging houses(26).
- In accordance with the strategicpolices of the Plan, there is a presumption against the provision of new dwellings outside of the Built-up Area as this would contribute towards an unsustainable pattern of development in the Island and erode the character of the countryside. There may, however, be exceptional circumstances where it can be demonstrated that a new dwelling in the countryside is justified, in particular, for the essential functioning of a farm holding. Such circumstances may arise in respect of accommodation that is required for a key
agriculturalworker, such as a bona fide agriculturalist(27) who may be a new entrant to the industry, or for a member of farm staff who, for the proper functioning of
the farm, needs to be on site.
- Owingto the exceptionalbasisupon which permissionmay be grantedfor staff accommodation or key agricultural worker housing outwith the Built-up Area in support of specific sectors of the economy, the Minister for Planning and
- see Lodging Houses (Registration) (Jersey) Law, 1962 for details of current standards
- A bona fide agriculturalist is someone employed in land dependent primary production, obtaining income from agriculture or horticulture which meets a target level of economic activity as defined by the Rural Economic Strategy (see section 3.2)
Environment will seek to ensure that the occupancy of any such accommodation is strictlylimitedto thoseemployedin therelevantindustryand willnotbe released whilst there remains a need for such accommodation within that industry.
Policy H9
Staff and key agricultural worker accommodation
Staff and key agricultural worker accommodation should be provided in the Built-up Area and be of a standard that is in accordance with the Minister for Planning and Environment's published guidance for housing.
Planning permission for staff accommodation outside the Built-up Area will not be permitted unless it is demonstrated, to the satisfaction of the Minister for Planning and Environment, that the proposal:
- is essential to the proper function of the business,
- cannot be provided on a site within the boundary of the Built-up Area and still meet the functional need,
- cannot be provided by an existing building, either on or off the site, and still meet the functional need,
- cannot be provided by rearranging, subdividing or extending an existing building on the site,
- where possible is located within or adjacent to the existing business premises, or other buildings on the site; and
- is of a size appropriate to its functional need.
Proposals for staff accommodation through the conversion, rearrangement, subdivision or extension of an existing building, or through the provision of temporary buildings should meet, as closely as possible, the required standards for housing as set out in the supplementary planning guidance issued by the Minister for Planning and Environment. The provision of such accommodation which does not meet those standards established for lodging houses will not be permitted.
Permission for new housing in the countryside to house key agricultural workers will not be permitted unless, in exceptional cases, it is demonstrated, to the satisfaction of the Minister for Planning and Environment, that the proposal meetsallofthecriteriaidentifiedaboveandissolelyforoccupationbyabona fide agriculturalist.
New permanent housing for key agricultural workers will not be permitted unless it meets the required standards for housing as set out in the supplementary planning guidance issued by the Minister for Planning and Environment.
Where permission is granted for staff accommodation and/or new dwellings to house key agricultural workers in the countryside, their occupation will be restricted, by condition, to those employed in the relevant industry. In the case of new dwellings for key agricultural workers, this will be related to personsemployedorlastemployedinagricultureasbonefideagriculturalists. For as long as there is a need within the relevant industry, the Minister will not relinquish such occupancy conditions.
Other residential development
- The previous sections have dealt with needs and demand housing requirements and supply. The following section contains policies relating to other aspects of housing development.
Conversion to flats
- The conversion of larger residential properties into smaller units of accommodation can make a valuable contribution to meeting the Island's housing need and can provide a source of affordable accommodation that is often conveniently located. This will require consideration and assessment within the context of the Island's housing needs and Policy H4 'Housing mix'.
- For such development to be acceptable, however, the implications of intensifying the use of such a property and it being used by several households requires particular consideration. Importantly, the quality and size of accommodation to be provided is a material consideration, including an assessment of the provision of internal living space and external amenity space. The extent of parking provision required will be dependent upon the site's location.
- Assessment of all of these matters will need to be undertaken relative to supplementary planning guidance adopted and issued by the Minister for Planning and Environment. Other considerations, related to the impact on neighbouring uses, are set out in Policy GD 1 'General development considerations'.
Policy H10
Conversion to flats
The conversion of larger dwellings into smaller self-contained housing units will be permitted if the development is in accordance with the required standards for housing as set by the Minister for Planning and Environment and meets the Island's housing needs, in accord with Policy H4 'Housing mix'.
Loss of housing units
- Housing in Jersey is an expensive commodity and there is evidence of a pent-updemandforhousing.Againstthisbackdrop,it isimportantthattheextent of, and access to, the housing stock is maintained and that development proposals which result in the loss of residential accommodation are resisted. There will, however, be exceptions to a general presumption against the loss of housing units.
- TheStatesStrategicPlan2009-2014makescleartheobjectiveofensuring that all Island residents are adequately housed. Where new development is to replace and/or improve existing sub-standard accommodation there may be an overall reduction in the number of residential units which would be acceptable on
thebasisofensuringaccommodationofanimprovedandappropriatestandard(28). This may also serve to better meet Jersey's housing needs and any such proposal
will require consideration under Policy H4 'Housing mix'.
- The St Helier Urban Character Appraisal(29) proposed the promotion of increased owner-occupation in the Town as a means of better ensuring the
maintenance and upkeep of the historic fabric and townscape of St. Helier: this proposal was based on the premise that owner-occupiers tend to take better care of premises than do absentee landlords. There are significant parts of the town, in particular, where there is a high concentration of houses in multiple occupation for rent and where proposals to convert town houses back into single household dwellings may have positive environmental benefits, of value to the town's architectural heritage, where these properties are Listed or in a Conservation Area.
Policy H11
Loss of housing units
Proposals that would lead to the loss of housing units will not be permitted except where it can be demonstrated, to the satisfaction of the Minister for Planning and Environment, that such loss is justified on the basis of:
- the replacement of sub-standard accommodation; or
- better meeting the Island'shousingneeds, in accord with Policy H4 'Housing mix'; or
- the maintenance and enhancement of the historic environment; or where
- thevalueofthedevelopmenttotheIslandoutweighsthelossorreduction in the Island's housing stock.
- see Policy H8 'Registered lodging accommodation' andPolicy H9 'Staff and key agricultural worker accommodation'
- see p. 202 St Helier Urban Character Appraisal
Natural Resources
9 Natural Resources and Utilities
Safety zones for hazardous installations
- Given the level of our reliance on hydrocarbons as a source of energy for heating and transport, amongst other uses, there is a need for fuel storage facilities withintheIsland.TheseessentialinstallationsincludethefuelfarmatLaCollette, wherekerosene,liquidpetroleumgas,petrol,dieselandjetfuelarestoredbefore being distributed to end-use consumers or intermediaries; Jersey Airport fuel farm; and Les Ruettes LPG store in St John. Since the gas holder fire at Tunnel Street (which held reserve stock), the gas holder is no longer operational and the risk has significantly diminished; however, work will continue to fully decommission the installation by the end of 2014 . The nature of these facilities poses a particular risk and, as a consequence, it is important that development in the vicinity of them does not exacerbate that risk or expose the users of any adjacent development to unnecessarily high levels of risk. Whilst not a fuel storage facility, the storage of explosives at Crabbé also falls to be similarly considered.
- Becauseofhealthandsafetyconsiderations,theseinstallationseffectively represent a constraint on development in the vicinity. The extent of that constraint isdependentuponthenatureofthestorageandthesensitivityofthedevelopment
proposal. As a result of the Buncefield event in the UK, further work(10) has been undertaken to consider all the major hazard risks associated with all the major
hazard installations at La Collette which has lead to a revision of the safety zones at La Collette as shown on the Proposals Map. Proposals for new development at La Collette will be considered within the context of this work. They will be assessed, in consultation with the Health and Safety at Work Inspectorate, the States of Jersey Fire and Rescue Service, the La ColletteHazard Review Group and other La Collette users, as appropriate, against the current Health and Safety Executive's Planning Advice for Developments near Hazardous Installations (PADHI). Similar processes will be employed for developments within the vicinity of other hazardous installations in the Island, which will include consultations with appropriate regulators.
10 Land Use Planning Risk: Assessment for La Collette Fuel Depot and Jersey Gas Facility (2007) Atkins and Jersey Airport Review of Fuel Farm Safety Zones 2011) Atkins
Picture 9.1 Airport Safety Zones for Hazardous Installations
- Work will continue to be undertaken to review existing safety zones and to define new zones, where this work has yet to be undertaken, as appropriate.
- Healthand safetyconsiderationswillbe theprimarymaterialconsideration in the assessment of development proposals in the vicinity of these installations and developments which would expose people to unnecessarily high levels of risk will not be permitted.
Proposal 26
Review of Safety Zones for Hazardous Installations
- The Minister for Planning and Environment will seek to ensure that work is undertaken to review existing safety zones and to define new zones, where this work has yet to be undertaken, as appropriate, during the Plan period.
9 Natural Resources and Utilities
Policy NR 8
Safety Zones for Hazardous Installations
In considering development proposals within the following safety zones associated with hazardous installations, as designated on the Proposals Map, the Minister for Planning and Environment will consult with those regulators identified in brackets below and other relevant stakeholders, to determine the appropriateness of the development:
- La Collette Fuel Farm (The States of Jersey Fire and Rescue Service);
- La Collette LPG Storage Site (Health and Safety at Work Inspectorate);
- Les Ruettes LPG Storage Site, St John (Health and Safety at Work Inspectorate);
- Airport Fuel Farm (The States of Jersey Fire and Rescue Service);
- Crabbé Explosive Storage Site, St Mary (The Home Affairs Department); and
- GasHolder,TunnelStreet:untilitsfinaldecommission (HealthandSafety at Work Inspectorate).
Developments within the vicinity of the hazardous installations at La Collette will also be the subject of consultations with the La Collette Hazard Review Group.
In all cases, the health and safety of the public and the extent to which any risks can be managed or mitigated will be the overriding considerations. Developments that would conflict with the reasonable requirements of health and safety will not be permitted.
Utilities infrastructure
- UtilitycompaniesintheIslandprovideservicestosupplywater,electricity, gas and telecommunicationsto homes and businesses. Each of the utility companies will have different land-use requirements during the Plan period. These requirementsmaybepartofanongoingprogrammeofdevelopmentbythecompany or a result of changes in technology that may occur.
- The developmentof utility infrastructurethat cannot be met within existing service infrastructure over the Plan period should, where possible, be limited to the Built-up Area and/or be within the grounds of existing facilities.
- Where new or extended facilities are required, particularly where they have a coastal or countryside location, the Minister will need to be satisfied that there is sufficient operational justification for development in such a location having regard to; the proven need for the new or extended facility, and; a full and detailed exploration of alternative methods of meeting that need.
- It is possible that during the remainder of the Plan period, there will be a requirement to increase the storage and supply of water resources to meet the Island's needs. Jersey Water has previously stated that the most likely means by which this could achieved would be to increase the storage capacity of Val de la Mare Reservoir. The company continues to investigate all engineering options available. The reservoir is located within the Coastal National Park where there is a presumption against development. Should the option of extending the reservoir be pursued there will be a requirement to demonstrate that it meets a proven needthatservestheIsland'sinterests,relativetoaproperassessmentofalternative options of meeting that need, whilst seeking to mitigate the environmental implicationsasfaraspossible.Similarconsiderationswouldapplytoanyproposals to extend, replace or renew La Rosiere desalination plant.
- Major infrastructure development will need to be considered within the context of an environmental impact assessment.
Policy NR 9
Utilities infrastructure facilities
Proposals for the development of new or additional utility infrastructure facilities or for the extension and/or alteration of existing utility infrastructure facilities will be permitted provided that the proposal is required to meet a proven need and is:
- within the Built-up Area; or
- within the grounds of an existing utility infrastructure facility.
Development that seeks to extend, alter of intensify the use of existing utility infrastructure facilities in the Green Zone or the Coastal National Park will need to demonstrate that; the need for development is proven; alternatives to meeting the need have been properly identified and considered; and that the environmental implications are properly identified, avoided and/or mitigated as far as possible.
The alternative development of utility infrastructure facilities will only be permitted where it can be demonstrated that they are no longer required for utility infrastructure purposes.
Site Assessments
B
Appendix B Affordable Housing Site Assessments
Policies H1, H2 and H5 zone land for the provision of affordable homes.
ThedefinitionofaffordablehomesisdetailedinPlanningforHomessectionofthe Housing chapter and in particular, it states that affordable housing should meet the needs of households on "median incomes"; that the homes are maintained as affordable for future generations; and the focus on "innovation in construction methods" to ensure that the homes can be built affordably.
Assessing affordability levels
As part of the development of the re-zoned sites, land owners and potential developers will need to have an understanding of the proposed levels of affordability, as determined through the definition of affordable housing in the Island Plan. Policies H1 requires that 80% of the units are for social rental homes and 20% for affordable homes for purchase.
Homes for social rent (80% of units)
The acquisition cost of the social rental homes will be based upon the rental values at 90% of the equivalent market rent for the homes being developed. Itisrecognisedthateachsitewillpotentiallyvaryintheseequivalentmarket levels and so in view of the impact that the provision of affordable housing can have upon the economics of developmentit is appropriatethat discussions relating to its delivery should commence at the earliest opportunity with the States of Jersey Strategic Housing Unit.
Affordable homes for purchase (20% of units)
Evidence from the current Housing Gateway demonstrates that the demand foraffordablehomesforpurchaseisfor2and3bedunits.Thisarisesbecause 1 bed room units are generally more affordable, whilst 4 bed units are generally beyond reasonable levels of affordability for those on median incomes. Only 2 and 3 bedroom affordable homes for purchase are, therefore, included for development on the Policy H1 rezoned sites.
The value of these homes on the re-zoned sites will be determined by the definition of affordability as set out above, and in particular the reference to median incomes. It is the role for the Housing Minister/Strategic Housing Unittodeterminehowthismightbestbereflectedintotheeligibilitycriteria of the Housing Gateway. The values of affordable homes for purchase will, therefore, be based upon the following;
B
The maximum median income for a 2 bedroom home should be £44,000, with a 10% deposit. This equates to a 2 bedroom home valued at no more than £230,000. Themaximummedianincomefora3bedroomhouseshouldbe£60,000 with a 10% deposit. This equates to a 3 bedroom home valued at no more than £310,000.
An indication of the size and number of these homes is provided in the following site assessments for each site proposed for rezoning. The final development yield will be informed by the preparation and approval of specific development briefs for each site and ultimately determined through the planning application process. Whilst it is recognised that the final package of affordable housing may depend upon the resolution of other issues which may themselves be the subject of negotiation, it remains good practise to front-load discussions where possible with the Department of the Environment and the Strategic Housing Unit.
Maintaining affordable homes in perpetuity
All social rental and homes for purchase developed on H1 sites will be retained as affordablehomesinperpetuitythroughaplanningobligationagreementwhichwill require all occupiers to be allocated through the Housing Gateway which will be managed by the Strategic Housing Unit.
A new legal framework is being developed to ensure that the affordable housing unit is occupied by those who eligibility is assessed through the Housing Gateway. This work is underway and running in parallel to this interim review of the 2011 Island Plan so that it is in place when the first home is sold.
Site assessments
Assessments of those sites zoned under policies H1 and H5 have been undertaken to consider the planning issues that apply to them and to provide a potential indication of housing yield. Development briefs, in the form of supplementary planningguidance,alreadyexistfortheStates-ownedsiteszonedunderPolicyH1, and the sites previously zoned under Policy H2.
The potential housing yield for each affordable housing site is only indicative at this stage.
These indicative yields have been estimated and are based on a range of site densities; the need for different sizes of dwellings identified in the Housing Gateway;andthepotentialcapacityofeachsitetoaccommodatedifferentnumbers and types of homes having regard to strategic considerations of local infrastructure and amenity provision, landscape capacity and the character of the surrounding area.
The actual number, size and type of homes on each site will be determined through the planning process.
B
The Department of the Environment will prepare a development brief for each site, to be approved by the Minister prior to the determination of a planning application.Thedevelopmentbriefswillguidethedeliveryofhomesonthesesites and will be adopted, as supplementary planning guidance, by the Minister for Planning and Environment.
The development brief, for each site, will address the following issues:
appropriate mix of types and sizes of homes;
design matters including density, form, landscape works, and materials; relationship between the proposed development and neighbouring uses and the local character of the surrounding area;
access by car, cycle and pedestrians and links to bus routes within and in the vicinity of the site;
provision of car parking;
provision of service infrastructure;
requirements for amenity space and public open space; and
the need for social, community, education and health facilitieswithin the site and implications for off-site facilities.
B
B.1 H1 (4) De La Mare Nurseries, la Rue a Don, Grouville
Site De La Mare Nurseries, La Rue a Don, Grouville Horticultural site formerly used for production and sale of
Exiting use/s
flowers
Category A affordable housing, public open space and Eastern Suitable use/s
cycle route.
The gross land area is approx 6 acres consisting of:
redundant glass houses
polytunnels approx
Accommodation and associated parking (.125 acre)
Ancillary buildings, tanks and hard standing areas Approximate agricultural land
site area
Area available for housing development:
grossdevelopmentarea=2.5acres(or2.35acresifexisting accommodationareaisnotincluded),toincludeopenspace (10% of site approx) = 0.3 acre
remaining land to be retained in, or restored to, agricultural use / natural landscaping.
Accordingly, the site is capable of being developed for houses or flats yielding between 40 no. to 50 no. dwellings, ranging in density from 70 to 80 habitable rooms per acre. The following table shows the preferred percentage split.
Social rental homes (80%)
3 bed 29 - 35 units Estimated
housing yield 4 bed 3 - 4 units
5 bed 1 - 1 units
Affordable homes for purchase (20%) 2 bed 3 - 5 units
3 bed 4 - 5 units
B
Site De La Mare Nurseries, La Rue a Don, Grouville
Social rental homes (80%) Totals 40 - 50 units
Table B.1 Site Details
Location plan
Picture B.1 De La Mare Nurseries
Planning history
The existing glasshouses use was established post war.
De La Mare Florist and nurseries was subsequently developed in the late 80's, but is now redundant.
The site was included in the revised draft Island Plan (March 2011) as suitable for the development of affordable housing but ultimately was not included in the approved Island Plan (June 2011).
B
A planning application for the development of 25 Category B homes was refused (April 2013) following the upholding of an appeal against an earlier refusal of planning permission by the Royal Court.
Planning remarks Spatial Strategy
The site is on the North West side of Ville-es-Renauds and is adjacent to the existing Built-up Area.
Accessibility – The site is reasonably accessible to facilities and amenities, with access to public transport. The site also offers the opportunity of contributing to the further development of the Eastern cycle route.
Constraints – The principal physical constraint on this site is its proximity to Grouville Marsh which is designated as an Ecological Site of Special Interest. The siteisalsoadjacenttotheWaterPollutionCatchmentAreas,whichseekstoensure that any development protects the ground water regime. Particular attention should be given to safeguarding any surface water run off from polluting the adjacent marsh area and this sensitive area should be carefully restored to agricultural use.
Surrounding development - The height of the surrounding development is predominantly two storey and the densities of adjacent existing development are approximately 65 – 70 habitable rooms per acre (13 to 14 dwellings per acre).
The development of the site offers the opportunity of removing a large area of redundant glass and improving the visual amenity of the area by restricting the extent of development, with careful design, and the use of appropriate material, colour and landscaping.
Landscape Sensitivity
Countryside Character Appraisal – The site is located in area B1 of the Countryside Character Appraisal which states that there is limited capacity to accept new development, which should be located in relation to the existing urban areas. Any development in the vicinity of Grouville Marsh is likely to have a major impact on this important nature conservation area, resulting in further drying out and ultimately loss of this isolated wetland habitat. It is recommended that a wide buffer zone is included to ensure the SSI is adequately protected.
Sites developed in this character area should also aim to provide environmental enhancement and management. The glasshouse block on the west of the site has been excluded from the developable area and could be removed and the land restored with appropriate landscaping. Likewise the existing reservoir and other external storage areas could be relinquished and the land restored. An area of open land which borders Paddock End' could be retained as open space.
B
The setting is low lying flat land and the site is prominent when viewed from La Rue a Don. The predominant form of development in the area is two storey and landscaping on the west side of the development would need to be considerably strengthened.
Response from consultees and other findings
CONSULTEES COMMENTS Agricultural Status No objection
From 1985 to 2008 the applicant ran a successful flower production and supply business.The applicantceased to trade at the end of 2008 as a resultof difficult tradingconditionsexacerbatedby the rise in energycostsand cheaper imported flowers.
Because part of the nursery consists of a comparatively modern block of glass, the applicant was requested to advertise the nursery in the JEP on 3 occasions to enable this Section to ascertain any likely demand for the nursery and its potential loss to commercial agriculture. It has been confirmed by the JEP Classified Section that there was no response to the adverts.
Due to the recent events in the protected crop industry with the main growers either ceasing to trade or downsizing to grow for the local market only, it was to be expected that there would be a lack of interest in this nursery. Therefore, it can be assumed that the nursery is now redundant because of the lack of response for the relatively modern glass.
Ecological Status Mitigate impact to Grouville marsh
The site is next to Grouville marsh which is designated as an Ecological Site of Special Interest.
Environmental Health Conditions Mitigation required
- Theexistingoiltankandhistoricusepresentstheriskofcontaminatedland. A contaminated land assessment for this site is necessary prior to development.
- The site is known to be a marsh and as such a site specific plan investigating potential flooding and drainage risks should be undertaken prior to development.
- Health Protection Policy Guidance 1 – Guidelines on Noise Control for Construction Sites
Traffic And Vehicular Access Site not supported by TTS
B
CONSULTEES COMMENTS
The Highway Engineer regards this site a poor for the purposes of Category A housing, primarily due to the distance of the site from main areas of employment, aswellasdistancefromsecondaryschools,bothofwhichrelyoncartrips.Some of the impacts of this site could be mitigated through new cycle routes and an improved bus service possible. Should this site be considered for rezoning then significantcontributionstoalternativetransportmethodsshouldbemadebythe developer to improve the likelihood of future residents being persuaded out of their cars.
Public Transport Good access to frequent service
There is a frequent public transport service and a bus stop is located approximately 300m from the site.
Educational Facilities – Primary Capacity in Grouville Primary School
Grouville Primary School is predicted to have sufficient capacity to cope with the potential number of children generated from this site and is approximately 450 m from the site.
Educational Facilities – Secondary Capacity in Le Rocquier School
The site is within the secondary school catchment of Le Rocquier which is predicted to have sufficient capacity to cope with the potential number of children generated from this site once the development is occupied. The school is located approximately 1 km from the site.
Other Community Facilities Nearest facilities Gorey Village
Foodshoppingiscurrentlyavailableatthenearbygaragewhichislocatedwithin a safe walking distance of 100 m.
A good range of amenities and facilities are available in Gorey Village which is located approximately 1000 m from the site. In addition, facilities are also available at Fauvic, which is approximately 400 m distance from the site.
The site is also located within walking distance of Grouville Bay.
Mains Water Supplies Yes
Jersey Water has confirmed that the site is relatively close to water mains infrastructure, which is capable of supplying the size of development identified for this site.
Foul Drainage Yes but at considerable cost
B
CONSULTEES COMMENTS
There are existing Public foul sewers in both La Rue a Don and Paddock End to which the site could be connected. However, the downstream pumping station does not have sufficient pumping or emergency storage capacity to cater for a development of this proposed size.
The existing pumping station could be upgraded, both for pumping and storage, but there are technical difficulties in doing this, not least of which would be the requirement to replace the whole length of rising main to accommodate the additional flow. Ground conditions in the area of the station are also known to be bad.
An alternative would be for the development to construct a new Public pumping station on the housing site which would pump to the head of the next pumping station downstream. The head of this system is located in La Rue a Don. This downstream station is better suited to catering for the additional flow although some additional emergency storage would still be required.
Moredetailedinvestigationwouldberequiredtodeterminethemostfavourable option but either option is likely to incur considerable cost.
Surface Water Drainage Yes
Soakaways would be the preferred option for disposal of surface water. If these will not work then there is a watercourse to the north of the site in field 229 that could be used for the disposal of surface water. However, discharge to this will require a short length of off-site sewer across private land and on-site attenuation to limit peak discharge flows.On site attenuation will be required to restrict the surface water discharge rate.
Electricity Yes
The Jersey Electricity Company has confirmed that two substations would be required to serve the development.
Other Services Yes
Other services – telecoms and gas may also be investigated by the developer.
Table B.2 Consultee Summary
B
B.2 H1 (5) Samares Nursery, La Grande Route de St Clement, St Clement
Site SamaresNursery,LaGrandeRoutedeStClement,StClement Exiting use/s Derelicthorticulturalsitepreviouslyusedfortomatoproduction
Category A affordable housing, proposed Eastern cycle route, Suitable use/s
public open space
The site is 9.8 acres (22 vergees) consisting of:
an area of commercial glass of 5 acres approx;
a reservoir of 0.86 acre approx;
ancillary buildings, tanks and hard standing areas Approximate
site area Area available for housing:
development: total site = 9.8 acres (22 vergees), developablearea=8.8acres(19.8vergees),withavillage green(10% of site approx)linkingontothe old railwaytrack and possible cycle / footpath = 1 acre (2.25 vergees)
Accordingly, the site is capable of being developed for houses or flats yielding between 180 - 200 no. dwellings, ranging in density from 70 to 80 habitable rooms per acre. The following table shows the preferred percentage split.
Social rental homes (80%)
1 bed 60 -67 units Estimated
housing 2 bed 60 -67 units
yield 3 bed 24 - 26 units Affordable homes for purchase (20%)
2 bed 18 - 20 units
3 bed 18 - 20 units
Totals 180 - 200 units
Table B.3 Site Details
B
Location plan
Map B.1 Samares Nursery, La Grande Route de St Clement, St Clement
Planning history
The original glasshouse use was established post war.
In 1997 approval was granted for large glasshouse complex for tomato production. However since 2002 the complex has been redundant and enforcement action was taken in 2006 to remove the glass and make the site safe.
The site was reviewed as part of the 2011 Island Plan Review and subsequently included in Policy H1 of the 2011 Island Plan as a site that should be reviewed for affordable housing in the event that delivery of affordable homes is not met in time on States owned sites.
Planning remarks
The site was identified in the 2002 Island Plan, under policy H4 as a site to be Safeguarded for Future Category A Housing need'.
This site was proposed for the development of affordable homes as part of the Draft Island Plan (Sept 2009): this was not included in the approved 2011 Island Plan but the site is identified, in Policy H1 of the 2011 Island Plan, as a site that should be reviewed for affordable housing in the event that delivery of affordable homes is not met in time on States owned sites.
B
Spatial Strategy
The site is located on the eastern side of the Le Squez Estate and could be easily integrated into the built-up area of St Clement, through careful design and landscaping.
Suitability
Accessibility – the site is in reasonable walking distance to facilities and amenities in the Le Squez area with good access to public transport. The site also offers the opportunity of contributing to the development of the Eastern cycle route.
Surrounding development - the height of the surrounding development is predominantly two storey and the densities of adjacent existing development are approximately 65 – 70 habitable rooms per acre (13 to 14 dwellings per acre).
Environmental improvement - the development of the site offers the opportunity of removing a large area of redundant glasshouse structures.
Landscape sensitivity
Countryside Character Appraisal - The site is located in area B2 of the Countryside Character Appraisal which states that there is some capacity to accept new development, provided this is carefully located and linked with appropriate environmental enhancement measures.
Thelandscapesettingislowlyingflatland,howeverthesiteislargelyhiddenfrom viewby ribbondevelopmenton thenorthand eastsidesand Le Squezon thewest. Any development would be visible from La Rue de Maupertuis across fields and would be partly seen against the backdrop of existing development.
The predominant form of development in the area is two storeys with some three storey on the adjacent Le Squez site and there is an opportunity to introduce heights ranging from 2 storey (adjacent to existing development) up to three and four storeys toward the centre and south/east parts of the site.
Response from consultees and other findings
CONSULTEES COMMENTS Agricultural Status No objection
This derelict nursery was identified as a possible Cat A, H4 site in 2004, in part due to the close proximity to the built up area. The Agriculture and Fisheries Committee at the time did not object to the development of the site because it
B
CONSULTEES COMMENTS
would be un-viable to return the land to agricultural use as there is a relatively largeareaofhardstandingwhichwouldmakereinstatingthelandtoagricultural use well nigh impossible.
In 2006 an enforcement notice was served requiring the owner to remove the glass panes due to the dangerous state of the nursery and only the frame work is left making the site even less likely to be used for agricultural purposes in the current economic climate as the site would need to be cleared of the warped frames.
Ecological Status None known
None identified, however further site investigation will be required as part of any Environmental Impact Assessment.
Environmental Health Conditions Mitigation required
- If access is off La Grande Route de St Clement, the noise environment for a significant number of existing residents will deteriorate. It is recommended that a noise impact assessment is completed prior to determining this site for reclassification.
- The existing oil tanks and historic use presents the risk of contaminated land. A contaminated land assessment for this site is necessary prior to development.
- This site was subject to previous consultation and previous comments remain extant.
- Health Protection Policy Guidance 1 – Guidelines on Noise Control for Construction Sites.
Traffic And Vehicular Access Site supported by TTS
This site has access access from St Clement's Inner Road and potential access from Le Squez Estate. In addition an opportunity exists to create a new cycle / footpath along the route of former eastern railway track.
Public Transport Good access to frequent service There is a frequent public transport service for both commuters and shoppers. Educational Facilities – Primary Capacity in Samares Primary School
Samares Primary School is predicted to have sufficient capacity to cope with the potential number of children generated from this site and is located within a safe walking distance of 300m from the site.
Educational Facilities – Secondary Capacity in Le Rocquier School
B
CONSULTEES COMMENTS
The site is within the secondary school catchment of Le Rocquier which is predicted to have sufficient capacity to cope with the potential number of children generated from this site once the development is occupied. The creation of the Eastern cycle track will provide a safe cycling and walking route to school of approximately 1 km.
Other Community Facilities Good access
The site is located within easy walking distance to existing community facilities and amenities.
Food shopping is currently available at Marks and Spencer supermarket is located within a safe walking distance of 500m.
Le Squez Youth Club is located within a safe walking distance of 300m. The Eastern Good Companion Club is located within a safe walking distance
of 350m.
The site is located within walking distance of a number of recreational facilities, such as golf club, squash courts, tennis courts, cricket, football and the beach. Thereisafrequentpublictransportserviceforbothcommutersandshoppers.
Mains Water Supplies Yes
Jersey Water has confirmed that the site is relatively close to water mains infrastructure, which is capable of supplying the size of development identified for this site.
Foul Drainage Yes
The under-capacity of the existing Public foul sewers in Rue du Maupertuis, and the known difficulty in upgrading them to accept flows from this development means that foul flows from this site will need to pump direct to the Public pumping station in Rue de Maupertuis. It is understood that drainage rights across the recently completed Field 40 development to the South have already been agreed for this purpose.
Given the number of units being considered, the on-site pumping station will need to be Public and therefore constructed to TTS specification and by an approved contractor.
Surface Water Drainage Yes
It is acknowledged that there are existing problems with the management of surfacewaterinthislocalitywhichwouldneedtobecomprehensivelyaddressed as part of any development of this site.
B
CONSULTEES COMMENTS
There are no Public surface water sewers readily available and there is some doubt whether soakaways will work on this site although investigations should be carried out to confirm this.
If surface water cannot be disposed of on site then an off-site sewer would be required to connect the site to the existing surface water sewers in Rue du Maupertuis. It is understood that drainage rights across the recently completed Field 40 development to the South have already been agreed for this purpose. However, a possible upgrade of the existing sewers in Rue de Maupertuis may be required as well as an upgrade to the surface water pumping station at Samares Marsh.Inaddition,on-siteattenuationisalsolikelytoberequiredtorestrictthe discharge rate from the site.
A topographical survey will be required to confirm is a gravity connection can be made to Rue du Maupertuis.If it cannotthen pumping will be required.If this provestobe thecase,therewillbe restrictionsonthepump rateandthepumping stationwillneedtobePublicandthereforeconstructedtoTTSspecificationand by an approved contractor.
Electricity Yes
The Jersey Electricity Company has confirmed that two substations would be required to serve the development.
Other Services
Other services – telecoms and gas may also be investigated by the developer.
Table B.4 Consultee Summary
B
B.3 H1 (6) Le Quesne Nurseries, St. Clement
Site Le Quesne Nurseries, St. Clement
Existing use/s Redundant glasshouse site
Suitable use/s Category A affordable housing, public open space
The total area of the land is 4.3 acres (9.5 vergees) Approximate site Area available for housing:
area Developmentarea = 4.3 acres ( 9.5 vergees)to include open space (10% of site approx) = 0.43 acre
Accordingly, the site is capable of being developed for houses or flats yielding between 55 no. to 65 no. dwellings, ranging in density from 70 to 80 habitable rooms per acre. The following table shows the preferred percentage split.
Social rental homes (80%)
2 bed 16 - 20 units Estimated housing
3 bed 16 - 20 units yield
4 bed 12 - 12 units Affordable homes for purchase (20%) 2 bed 5 - 6 units
3 bed 6 - 7 units Totals 55 - 65 units
Table B.5 Site Details
B
Location plan
Picture B.2 Le Quesne Nurseries
Planning history
The site consist of a derelict commercial glasshouse complex.
Following the development of adjacent land for Category A housing, zoned in the 2002 Island Plan, the landowner made several attempts to have this site rezoned and in 2007 the site was one of three sites considered by St Clement's Parish for the development of sheltered housing.
The site was reviewed as part of the 2011 Island Plan Review and independent planning inspectors considered it to be a potentially suitable housing site. Accordingly, this site is included in Policy H1 of the 2011 Island Plan as a site that should be reviewed for affordable housing in the event that delivery of affordable homes is not met in time on States owned sites.
Planning remarks Spatial Strategy
B
The site is on the edge of the built-up area and has good access to a main road and frequent bus routes and can be reasonably integrated with the built-up area with careful design and landscaping.
Suitability
Accessibility – The site would provide a pedestrian footpath and is also accessible to local amenities and facilities.
Constraints and implementation – The principal physical constraint for this site is potential contamination from the damaged glasshouses and oil storage. Surrounding development - The height of the surrounding development is predominantly two storey and the densities of adjacent existing development are approximately 65 habitable rooms per acre.
Environmental improvement - The removal of the derelict glass; the decontamination of the site; and the potential to create new footpath links to the coast road represent potential environmental improvements
Landscape sensitivity
Countryside Character Appraisal - The site is located in area E5 of the Countryside Character Appraisal which states that the area has limited capacity to accept new development and any proposed development should be located in relation to the existing urban areas and it is recommended that the rural character of the area should be enhanced.
Response from consultees and other findings
CONSULTEES COMMENTS
Agricultural Status No commercial benefit Thederelictglasshousesareofnocommercialbenefittothehorticulturalindustry
Ecological Status None Identified
None identified, however further site investigation will be required as part of any Environmental Impact Assessment.
Mitigation of contaminated land Environmental Health Conditions
required
- Theexistingoiltankandhistoricusepresentstheriskofcontaminatedland. A contaminated land assessment for this site is necessary prior to development.
B
CONSULTEES COMMENTS
- The site is known to be a marsh and as such a site specific plan investigating potential flooding and drainage risks should be undertaken prior to development.
- Health Protection Policy Guidance 1 – Guidelines on Noise Control for Construction Sites
Traffic And Vehicular Access Site supported by TTS
This site has good access from St Clement's Inner Road.
Public Transport Good access to frequent service
There is a frequent public transport service for both commuters and shoppers in reasonable walking distance from either St Clement Coast or Inner Road.
Educational Facilities – Primary St Clement's School
The site is within the catchment area for St Clement's Primary School which is predicted to have sufficient capacity for the potential number of children generated from this site.
Educational Facilities – Secondary Le Rocquier School
The site is within the secondary school catchment of Le Rocquier which is predicted to have sufficient capacity to cope with the potential number of children generated from this site once the development is occupied.
StClement'sChurch,Caldwell Hall and Other Community Facilities
Co-Op Pontac in close proximity Food shopping is currently available at the nearby Co-Op at Pontac.
The site is also close to existing community facilities of St Clement's Church and Caldwell Hall .
The site is also located within walking distance of the beach.
Mains Water Supplies Yes
The existing distribution system should be capable of supplying the size of development identified for this site and early discussion should take place with Jersey Water.
Foul Drainage Yes
There is an existing foul sewer in Jambart Lane and the developer will need to consult TTS drainage engineers to determine accessibility and capacity.
B
CONSULTEES COMMENTS Surface Water Drainage Yes
There is an existing surface water sewer in Jambart Lane and a watercourse to the west of the site. On site attenuation will be required to restrict the surface water discharge rate.
Electricity Yes
A new substations may be required to serve the development.
Other Services Yes
Other services – telecoms and gas may also be investigated by the developer.
Table B.6 Consultee Summary
B
B.4H1(7)LonguevilleNurseries,NewYorkLane,StSaviour
Site Longueville Nurseries, New York Lane, St Saviour Exiting use/s Retail Garden Centre
Suitable use/s Category A affordable housing
The gross site is 2.1 acres (4.75 vergees) consisting of:
covered retail area of 1100 m.sq. approx; customer and staff parking 1680 m.sq. approx; glass & polytunnels 900 m.sq.
Approximate Area available for housing:
site area
The net development area = 1.3 acres (2.5 vergees), with an area of communal open space (10% of site approx) = 0.1 acre (0.225 vergees). This represents the southern part of the site consisting of the existing retail structure and car park and excludes the poly tunnels and open land on the northern part of the site.
Accordingly, the site is capable of being developed for houses or flats yielding between 24 no. to 27 no. dwellings, ranging in density from 75 to 80 habitable rooms per acre. The following table shows the preferred percentage split.
Social rental homes (80%)
Estimated
housing yield 2 bed 19 -21 units Affordable homes for purchase (20%)
2 bed 3 - 4 units
3 bed 2 - 2 units
Totals 24 - 27 units
Table B.7 Site Details
B
Location plan
Picture B.3 Longueville Nurseries
Planning history
A retail garden centre and associated dwelling house was established in the early 80's. The agricultural corpus fundi condition on dwelling removed in 2004 and the retail garden centre is not currently in use.
The site was reviewed as part of the 2011 Island Plan Review and independent planning inspectors considered it to be a potentially suitable housing site. Accordingly, this site is included in Policy H1 of the 2011 Island Plan as a site that should be reviewed for affordable housing in the event that delivery of affordable homes is not met in time on States owned sites.
Planning remarks
This site was proposed for the development of affordable homes as part of the Draft Island Plan (Sept 2009): it was not, however, included in the approved 2011 Island Plan.
Spatial Strategy
B
The site is in the Longueville area, to the North of the Rue des Pres Trading Estate area, immediately adjacent to the Built-up Area and has reasonable access to a main road. It is short walking distance of a bus stop, shops and Plat Douet primary school. The southern part of the site which is occupied by the existing garden centre structure and car park can, with careful design and landscaping, be reasonably integrated into the existing built-up area.
Suitability
Accessibility – The site is reasonably accessible to facilities and amenities in the Longueville area, with good access to public transport.
Constraints and implementation – The principal constraint on this site is its proximity to Rue des Pres Marsh which is designated as an Ecological Site of Special Interest.
Surrounding development - The height of the surrounding development is predominantly two storey and the densities of adjacent existing development are approximately 65 – 70 habitable rooms per acre (13 to 14 dwellings per acre).
Environmental improvement - The development of the site offers the opportunityof removinggardencentre (retail)activity and improvingthe visual amenity of the area by restricting the extent of development, with careful design, and the use of appropriate material, colour and landscaping.
Landscape Sensitivity
Countryside Character - The site is located in area B2 of the Countryside Character Appraisal, which states that there is some capacity to accept new development, provide this is carefully located and linked with appropriate environmental enhancement measures.
Response from consultees
CONSULTEES COMMENTS Agricultural Status Objection to loss of nursery
Longueville Nursery was an active horticultural business operating from areas of hard standing and polythene tunnels sited on agricultural land (Field 729 St Saviour) Recently the owners and operators of the nursery retired from the business and the nursery was been let on a short term lease. The nursery is an intensive horticultural use of 6 vergées of land.
Ecological Status None known
The site is located to the north of Rue des Pres wetland area which is a designated ecological SSI.
Environmental Health Conditions Mitigation required
B
CONSULTEES COMMENTS
- The site is adjacent to the Rue des Pres Trading Estate. In order for residential development to take place, a detailed noise assessment of traffic and commercial noise sources must be undertaken to demonstrate development can be achieved without annoyance or nuisance being caused to residential dwellings.
- Theexistingoiltankandhistoricusepresentstheriskofcontaminatedland. A contamination land assessment for this site is necessary prior to development.
- Health Protection Policy Guidance 1 – Guidelines on Noise Control for Construction Sites
Traffic And Vehicular Access Site supported by TTS
Although the trip generation is likely to be fairly high, there are realistic alternatives to car use from this site, and potential to improve those alternatives.
If this site were to be developed for Category A housing, there are some choices forresidentstomakeasalternativestocaruse.TTSHighwayEngineertherefore supports the site for rezoning for Category A housing.
Public Transport Good access to frequent service
Good commuter bus routes provided by 1b, 2c and 22. Existing bus stop located at Longueville Stores which is a short distance from the site.
Educational Facilities – Primary Capacity in Plat Douet Primary School
Plat Douet Primary School is predicted to have sufficient capacity to cope with the potential number of children generated from this site and is located approximately 1 km from the site.
Educational Facilities – Secondary Capacity in Le Rocquier School
The site is within the secondary school catchment of Le Rocquier which is predicted to have sufficient capacity to cope with the potential number of children generated from this site once the development is occupied. And is located approximately 3 km from the site.
Other Community Facilities Good access
The site is located within easy walking distance to existing community facilities and amenities.
B
CONSULTEES COMMENTS
Food shopping is currently available at LonguevilleStores and a greater range ofservicesareavailableatLonguevilleParadewhichislocatedwithinasafe walking distance of 450m.
The site is located within walking distance of a number of recreational facilities, such as golf club, squash and tennis courts at Georgetown.
Mains Water Supplies Yes
Jersey Water has confirmed that the site is relatively close to water mains infrastructure, which is capable of supplying the size of development identified for this site.
Foul Drainage Yes
There is a Public foul sewer in La Route de Longueville that can be reached by a short length of off-site sewer along New York Lane. However, the downstream pumping station may require upgrading to accept the additional flows from this development as well as the construction of additional emergency storage to accept the increased volume.
Surface Water Drainage Yes
Soakwaysarethepreferredoptionfordisposalofsurfacewaterandtheseshould be investigated at an early stage. If these will not work then there is a watercourse to the west that crosses under La Route de Longueville to the east of the entrance to the Rue des Pres Trading Estate. This can be reached by a short length of off-site sewer although a topographical survey will be required to determine the best connection point. Irrespective of this, on-site attenuation will be required to restrict peak flows from any development.
Electricity Yes
The Jersey Electricity Company has confirmed that two substations would be required to serve the development.
Other Services Yes
Other services – telecoms and gas may also be investigated by the developer.
Table B.8 Consultee Summary
B
B.5 H5 (1) Glasshouse Site, Field 785, La Rue des Cosnets, St Ouen
Site Glasshouse site, Field 785, La Rue des Cosnets, St Ouen Exiting use/s Redundant horticultural site
Suitable use/s Category A housing, communal open space
The total land area is 1.5 acres (3.5 vergees) consisting of an area of redundant glasshouses.
Approximate site Area Available For Housing:
area Developablesite=1.5acres(3.5vergees),toincludean
area of communal open space (10% of site approx) = 0.15 acre (0.3 vergees)
Accordingly, the site is capable of being developed for houses or flats yielding between 15 no. to 22 no. dwellings, ranging in density from 60 to 80 habitable rooms per acre. The following table shows the preferred percentage split.
Social rental homes (80%)
2 bed 3 - 4 units Estimated 3 bed 8 - 10 units
housing
yield 4 bed 1 - 4 units Affordable homes for purchase (20%)
2 bed 1 - 2 units
3 bed 2 - 2 units
Totals 15 - 22 units
Table B.9 Site details
B
Location plan
Map B.2 Glasshouse site, Field 785, La Rue des Cosnets, St Ouen
Planning history
This horticultural site was established in the mid 60's which has expanded to approximately1acre(2.25vergees)ofcommercialglass,withanicilarysheds, boiler and tanks.
The 2002 Island Plan designated the site in Policy H4, safeguarding it for future category A housing.
Planning remarks
The site was identified in the Strategic Housing Land Availability Assessment as being suitable for Category A housing.
Spatial strategy
The site is on the southern edge of a small rural settlement at Le Landes and can be reasonably integrated into the built-up area.
Suitability
Accessibility – The site is remote from facilities and amenities; the nearest being St Ouen's Village. However the site is accessible by public transport.
B
Constraints and implementation – The principle physical constraint on this site is its remoteness from facilities and amenities. Utility services however are available, but connection to a surface water sewer could be expensive if soakaways do not work.
Surrounding development - The height of the surrounding development is predominantly two storey and the densities of adjacent existing development are approximately 65 habitable rooms per acre (13 dwellings per acre). Environmental improvement - The development of the site offers the opportunityofremovingalargeareaofglassandimprovingthevisualamenity of the area through careful design, and the use of appropriate material, colour and landscaping. In addition, the Minister will use a planning obligation agreement to ensure that Fields 790 and 791 are cleared of the remaining nursery and associated structures and restored to agriculture, prior to the development of Field 785.
Landscape sensitivity
Countryside Character Appraisal – The site is located in area E1 of the Countryside Character Appraisal which states there is very limited capacity to accept new development in without comprising the landscape. However this site is adjacent to an existing settlement and can reasonably be integrated into it with good design.
Existing land use
Existing land use - The proposal makes use of land that is currently used in horticulture;
Response from consultees and other findings
CONSULTEES COMMENTS Agricultural status No objection
This site was identified in 2004 as a possible H4 site and this Section commented as follows; Small glasshouse site consisting of 60's block and new block, well maintained. No room for expansion – of no significant loss to agriculture. Recommendation; No objection.
In the last 5 years there has been a significant downturn in the protected crop sector, with the industry ceasing to export; therefore the loss of these glasshouses will have no significant impact on the protected crop industry.
Ecological status None known None Known
Environmental health conditions Mitigation required
B
CONSULTEES COMMENTS
Health ProtectionPolicy Guidance 1 – Guidelineson Noise Controlfor Construction Sites
- The existing oil tanks and historic use presents the risk of contaminated land. A contaminated land assessment for this site is necessary prior to development. However the site plan also identifies storage tanks in the vicinity of the site which should be subject to an assessment to make sure ground water is protected.
- This site is currently a storage facility for a landscaping business; fields 791 and 790 have staff accommodation units, stone and paving supplies and it would appear to be an active landscaping business. In the first instance, I wouldappreciateitifyoucouldconfirmthatthisispermitteddevelopment. If it is, a noise protection scheme involving the screening of the proposed site from this commercial activity should form part of any permit to allow development of the site.
Traffic and vehicular access Site not supported by TTS
This site is located in a very isolated location with only one community facility, a primary school, which is within easy walking distance. There are no other community facilities within easy access of this site. Therefore residents of this site would need a car for virtually all activities. Accordingly the site is not supported by TTS.
If this site is approved for development, then a road improvement works would e required at the junction of La Rue a La Pendue and La Rue des Cosnets.
Public transport Good access to frequent service
The No 8 bus route provides a public transport service for both commuters and shoppers.
Educational facilities – primary Capacity in Les Landes Primary School
Les Landes Primary School is predicted to have sufficient capacity to cope with the potential number of children generated from this site and is located approximately 250 m from the site.
Educational facilities – secondary Capacity in Les Quennevais School
The site is within the secondary school catchment of Les Quennevais which is predicted to have sufficient capacity to cope with the potential number of children generated from this site once the development is occupied.
Other community facilities Nearest facilities St Ouen's Village
B
CONSULTEES COMMENTS
Thesiteisremotefromexistingcommunityfacilitiesandamenities.Thenearest being St Ouen's Village which is approximately 2.5 km from the site.
Mains water supplies Yes
Jersey Water has confirmed that the site is relatively close to water mains infrastructure, which is capable of supplying the size of development identified for this site.
Foul drainage Yes
There is a public foul sewer in La Rue des Cosnets that could accept flows from this site. However, the downstream station may require upgrading to accept the additional flows and will require additional emergency storage to cater for the additional volume.
Expensive to connect to s/w sewer if Surface water drainage
soakaways do not work
Soakaways would be the preferred option for the disposal of surface water. If these will not work then there is no other readily available means of disposal. There are no public surface water sewers and the nearest watercourse is some considerable distance to the south in Field 1102 which can only be reached by anoff-siteseweralongPublicandParishroadsandacrossprivateland.Inaddition, on-site attenuation would be required to restrict peak run-off flows from the site. Surface water costs could therefore be considerable.
Electricity Yes
The Jersey Electricity Company has confirmed that one substation would be required to serve the development.
Other Services Yes
Other services – telecoms and gas may also be investigated by the developer.
Table B.10 Consultee summary
B
B.6 H5(2) Field 402, St.Martin
Site Field 402, St. Martin Exiting Use/s Agricultural land and disused garage Suitable Use/s Category A housing, communal open space
Thegrosslandareais1.5acres(3.4vergees)consisting of area.
Approximate Site Area Available For Housing:
Area The developable site = 1.5 acres (3.4 vergees), to
include an area of communal open space (10% of site approx) = 0.15 acre (0.3 vergees)
Accordingly, the site is capable of being developed for houses or flats yielding between 19 no. to 22 no. dwellings, ranging in density from 68 to 80 habitable rooms per acre. The following table shows the preferred percentage split.
Social rental homes (80%) EstimatedHousing 3 bed 15 - 17 units
Yield
Affordable homes for purchase (20%) 2 bed 2 - 2 units
3 bed 2 - 3 units
Totals 19 - 22 units
Table B.11 Site Details
B
Location Plan
Picture B.4 Field 402, St. Martin
Availability For Housing
The Parish of St Martin have expressed interest in this site for a Parish development to assist first time buyers.
Planning History
The field is approximately 1.5 acre (3.4 vergees) along with the adjacent disused garage site.
The site was safeguarded for Category A housing in the 2002 Island Plan, however the 2011 Island Plan subsequently re-designated the site as green zone.
The Parish has previously identified the site as a possible affordable housing site in a parish-led study.
Planning Remarks Spatial Strategy
The site is adjacent to the village of St Martin and with careful design and landscaping, can be reasonably integrated into the built-up area. The site is also a short walk to the existing Parish community facilities and shops.
B
Suitability
Accessibility – The site near existing facilities and amenities; the nearest being St Martin's Village and is accessible by public transport.
Constraints and implementation – the field is in agricultural use and the disused garage land may be contaminated.
Surrounding Development - The height of the surrounding development is predominantly two storey and the densities of adjacent existing development no greater than 65 habitable rooms per acre (13 dwellings per acre). Environmental Improvement - The redevelopment of the disused garage site would involve some remediation of the site. However the loss of a 1.5 acre agricultural field is significant and has to be considered against the social benefits of providing homes in close proximity to the village centre.
Landscape Sensitivity
Island Plan Zone - The site is in the green zone where there is a presumption against all forms of new development, accordingly the land would need to be rezoned for Cat A housing.
Countryside Character Appraisal – The site is located in area E7 of the Countryside CharacterAppraisalwhichstatesthereissomecapacitytoacceptnewdevelopment, allied with measures of conservation and enhancement. Any development can have a high impact in the long views and any new development should generally be limited to the existing village areas.
Existing Land Use
Existing Land Use - The proposal makes use of land that is currently used in agriculture
Response from Consultees and Other Findings
CONSULTEES COMMENTS Agricultural Status No Objection
Field 402 is currently used for grazing, however the size of the field Ecological Status None known
The site has a number of mature trees which provide habitat for birds and possibly squirrels, accordingly further site investigation will be required as part of any application.
Environmental Health Conditions Mitigation required
B
CONSULTEES COMMENTS
- The historic garage use presents the risk of contaminated land. A contaminatedlandassessmentforthissiteisnecessarypriorto development.
- Health Protection Policy Guidance 1 – Guidelines on Noise Control for Construction Sites.
Traffic And Vehicular Access Yes
The site has direct access to La Grande Route de Faldouet. A new vehicular access/egresswillberequiredtocomplywithTTSHighwaysvisibilityrequirements and is likely to involve the loss of roadside trees and hedging, and a possible realignment of the road side.
Public Transport Good access to frequent service
Thesiteisneartoa frequentbusroutewhichprovidesa publictransportservice for both commuters and shoppers.
Educational Facilities – Primary CapacityinStMartin'sPrimarySchool
The new St Martin's primary school is predicted to have sufficient capacity to copewiththepotentialnumberofchildrengeneratedfromthissiteifdeveloped for family housing.
Educational Facilities – Secondary Capacity in Grainville School
The site is within the secondary school catchment of Grainville which is predicted to have sufficient capacity to cope with the potential number of children generated from this site if developed for family housing.
Other Community Facilities
The site is near existing community facilities and amenities of the village of St Martin.
Mains Water Yes
Jersey Water has confirmed that the site is relatively close to water mains infrastructure, which is capable of supplying the size of development identified for this site.
Foul Drainage Yes
There is a public foul sewer in La Grande Route de Faldouet which may accept flows from this site.
Surface Water Drainage Yes
Soakaways would be the preferred option for the disposal of surface water.
B
CONSULTEES COMMENTS
Electricity Yes
It is likely that a substation would be required to serve the development.
Other Services Yes
Other services – telecoms and gas may also be investigated by the developer.
Table B.12 Consultee Summary
Planning and Building Services Department of the Environment South Hill
St Helier
Jersey
JE2 4US
t. 01534 445508
w. www.gov.je/planningbuilding
Front cover image courtesy of Stuart Abraham © Jersey Photos 2011 (www.jerseyphotos.co.uk)