Jersey Island Plan 2002 – Assessment of Proposed Energy from Waste Facility against all Planning Policies General Policies

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

G1

Sustainable Development

Yes

The purpose of this facility is to provide an upgraded energy from waste facility in accordance with the Waste Strategy and to replace the existing incinerator at Bellozanne. The location at La Collette would minimise environmental impact and the design would aim to minimise nuisance.

G2

General Development Considerations

Yes

The Environmental Impact Assessment demonstrates compliance with General Development principles through site specific investigations. Site pollution control would be implemented via the site licencing procedure and the on site Working Plan.

G3

Quality of Design

Yes

Incorporated within the Environmental Impact Statement. See also G4.

G4

Design Statements

Yes

A Design Statement may be requested to accompany planning applications at the discretion of the Planning & Environment Department. Certain types of proposals will however always require a statement including those developments involving a building more than 5 storeys high. The Energy from Waste would be higher than a 5 storey building. Notwithstanding the above, the Minister is keen to see Design Statements for most applications. To that end, Design Statements will be required for any development comprising more than 100m2 of new building (gross internal area (GIA).  

G5

Environmental Impact Assessment

Yes

An Environmental Impact Assessment has been carried out and an Environmental Impact Statement is submitted with the planning application.

G6

Transport Assessments

Yes

Included within the Environmental Impact Statement due to potential impacts of traffic movements to and from the proposed site.

G7

Control of Unauthorised Development

No

The application is in accordance with the formal planning application process. The Client (TTSD) is intending to obtain outline planning permission prior to awarding the contract to the preferred bidder thereby removing any possibility of construction proceeding without planning approval

G8

Access for All

Yes

No public access to Energy from Waste plant and Bulky Waste Facility. Planning application does include infrastructure improvements to adoptable highway and also to the coastal path. The design would also include an amenity walkway on the seaward side of the screening mound as an additional public amenity feature.

G9

Designing Out Crime

Yes

The site would be surrounded by secure fencing.

G10

Planning Obligations

Yes

Road infrastructure is being incorporated into the design. This would be to an adoptable standard.

G11

Sites of Special Interest

Yes

Site investigations and consultations indicate that the site would not directly affect any Sites of Special Interest. The South East Coast of Jersey Ramsar Site would not be directly affected by the proposed facility. Discharge of cooling water to the sea would be within the existing discharge consent conditions.

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

G12

Archaeological Resources

Yes

Consultations indicate that no sites of archaeological interest would be directly affected

G13

Buildings and Places of Architectural and Historic Interest

Yes

Indirect visual impact from Elizabeth Castle would be mitigated by design of the facility building and landscape bunding

G14

Protection of Trees

No

No trees would be felled at the site

G15

Replacement Buildings

No

No buildings are to be replaced at the site

G16

Demolition of Buildings

No

No buildings are to be demolished at the site

G17

Contaminated Land

Yes

A watching brief during excavations would be implemented.

G18

Signs and Advertisements

Yes

The facility would have an external site noticeboard as specified within the Working Plan. Signage would be controlled via a planning condition

G19

Satellite Antennae

Yes

Applications for the installation of satellite dishes will be judged on their merits, having particular regard to:

  1. the nature of the building and its surroundings;
  2. the type, size and colour of the equipment in relation toits background; and
  3. whether the building is a Site of Special Interest, a Building of Local Importance or within a Conservation Area.

G20

Light Pollution

Yes

The site would be lit however this is in context of the industrial area at La Collette. The facility would be partially screened from Havre Des Pas by landscape bunding / mounding

Countryside

 

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

C1

Sustainability and Stewardship of the Countryside

No

La Collette falls within the Built Up Area boundary as shown on Jersey Island Plan 2002 Town Proposals Map and not the countryside.

C2

Countryside Character

Yes

La Collette falls within the Character Area G3 St Aubins Bay however the proposed development is in context of the industrial use of La Collette reclamation area

C3

Biodiversity

Yes

The facility would have minimal impact on biodiversity or the coastal Ramsar site. Site investigations revealed no biodiversity interest on the site and the drainage at the facility is designed to prevent pollution to the Ramsar site. Pollution control measures are specified within the Environmental Impact Statement and would be incorporated within the Working Plan. Discharge of cooling water to the sea would be within the existing discharge consent conditions.

C4

Zone of Outstanding Character

No

Site is not within this zone

C5

Green Zone

No

Site is not within this zone

C6

Countryside Zone

No

Site is not within this zone

C7

St. Ouen 's Bay Planning Framework

No

Site is not within the St. Ouen Bay area

C8

Landscape Management Strategy

No

See policies C4, C5 and C6

C9

Trees and Woodlands

No

None of these present at the site

C10

Walls, Fosses, Banques and Hedgerows

No

None of these present at the site

C11

Countryside Access and Awareness

No

Not in the countryside

C12

Tourism and Recreation Support Facilities in the Countryside

No

Not applicable as facility is in Built Up Area Zone and not the Countryside Zone

C13

Safeguarding Farmland

No

Site is not farmland

C14

Stewardship in Agriculture

No

Ditto

C15

Diversification of Agriculture

No

Ditto

C16

New Agricultural Buildings and Extensions

No

Ditto

C17

New Dwellings for Agricultural Workers

No

Ditto

C18

Change of Use and/or Conversion of Traditional Farm Buildings

No

Ditto

C19

Change of Use and/or Conversion of Modern Farm Buildings

No

Ditto

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

C20

Redundant Glasshouses

No

Not applicable

Built Environment

 

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

BE1

St. Helier Urban Character Appraisal

Yes

La Collette is not within the urban townscape of St. Helier town but it is within the built up area boundary as defined by the Town Proposals Map. The proposed facility is within context of the La Collette reclamation area which has industrial / commercial sites.

BE2

Proposals in the Town of St. Helier

Yes

As above

BE3

Town Centre Vitality

No

Not within the Town Centre Area of St. Helier

BE4

Waterfront Development Area

No

Not within the Waterfront Development Area

BE5

Tall Buildings

Yes

The proposed Energy from Waste facility would be a tall building however it would be in context of the La Collette reclamation area. The height is estimated at 35m. The building would be partially screened by landscape bunding.

BE6

Action Areas

No

Just outside of Havre des Pas Action Area

BE7

Settlement Plans

No

Not within a settlement plan area

BE8

Important Open Space

No

Not open space in the context of the policy which refers to green spaces. Not within defined Open Space Area. The nearest Defined Open Space is La Collette Gardens

BE9

Conservation Areas

No

La Collette reclamation area is not within a Conservation Area

BE10

Green Backdrop Zone

No

Not within Green Backdrop Zone

BE11

Shoreline Zone

No

Not within the shoreline zone

BE12

Percent for Art

No

Site not suitable as a general access area for public recreation.

BE13

Frontage Parking

No

Not applicable

BE14

Street Furniture and Materials

No

No street furniture associated with facility other than signing - See G18

Marine Environment

 

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

M1

Marine Protection Zone

Yes

The proposed Energy from Waste facility is not within the inter-tidal or Marine Protection Zone. See comments in C3. It will however discharge to the Marine Protection Zone under an existing Trade Effluent consent

M2

Coastal Zone Management Strategy

No

This policy refers to the development of a strategy.

M3

Marine Biodiversity

Yes

A coastal Ramsar site lies to the south and east of La Collette reclamation area. The designed drainage systems and pollution control measures are specified within the Environmental Impact Statement. See comments in C3

M4

Shoreline Management

No

Policy refers to the development of a Shoreline Management Plan.

M5

Fishing and Fish Farming

No

Facility not relevant to fishing or its support industry.

M6

Marine Sites of Special Interest

Yes

Policy refers to South East Coast Ramsar site. This policy is dealt with under the provisions of Policy G11. Also see comments on Policy M3 and C3

Housing  

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

H1-H14

Housing Policies

No

None  

Social and Community  

 

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

SC1- SC11

Social and Healthcare policies

No

None

Industry and Commerce

 

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

IC1

Provision of Office Accommodation

No

Not applicable.

IC2

Offices in St. Helier Town Centre

No

Ditto

IC3

Offices Outside of St. Helier Town Centre

No

Ditto. This facility is not designed to provide office provision.

IC4

Conversion of Upper Floors of Commercial Buildings for Office Accommodation

No

Not applicable.

IC5

Other Small Scale Office Developments

No

Not applicable

IC6

Businesses Run from Home

No

Not applicable

IC7

Provision of Industrial Land

Yes

Land comprising 21 acres/47 vergéesis designated at La Collette 2 for industry, storage and warehousing. Site footprint falls partially within Site Proposed for Industry

IC8

Protection of Existing Industrial Sites

No

Proposed facility does not fall within designated existing industrial sites or within the area of La Collette 1.  

IC9

Proposals for New Industrial Buildings

Yes

The proposed facility is designed to be in accordance with this policy. Pollution and nuisance control measures are specified in the Environmental Impact Statement. Traffic impact is assessed in the Environmental Impact Statement.

IC10

Relocation of Bad Neighbour Uses

Yes

The existing facility at Bellozanne is currently not meeting environmental air quality standards and traffic congestion is causing a nuisance to local residents.

A Health Impact Assessment will be carried out as part of the planning process in order to consider community effects.

IC11

Extensions or Alterations to Existing Industrial Buildings

No

Works within the Jersey Electricity Company power station are not included within this planning application as they classed as exempt works under the Island Planning (Exempt Operations) (Jersey) Regulations 2002.

IC12

New Industrial Development in the Countryside

No

Ditto

IC13

Protection and Promotion of St. Helier for Shopping

No

Ditto

IC14

Protection and Promotion of Local Shopping Centres

No

Ditto

IC15

Development of Local Shops

No

Ditto

IC16

Development of Evening Economy Uses

No

Ditto

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

IC17

Food Retailing Proposals

No

Ditto

IC18

Retail Warehouses

No

Not a retailing facility

IC19

Retailing within Industrial Sites

No

Ditto

IC20

Retail Development Outside the Built-up Area

No

Ditto

IC21

Take-away Food Outlets

No

Not applicable

IC22

Beach Kiosks

No

Ditto

Tourism and Recreation

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

TR1

Development of New Tourist Accommodation

No

Not applicable

TR2

Tourist Destination Areas

No

Havre Des Pas is listed as A Tourist Destination Area. Potential nuisance from the site to Havre Des Pas is covered under General Development Policies.

TR3

New or Extended Tourism and Cultural Attractions

No

Not applicable

TR4

Protection of Recreational and Cultural Resources

No

There would be no loss of recreational or cultural facilities due to the proposed facility.

TR5

Development of Recreation Resources

No

This policy is aimed more at sporting facilities and is therefore not applicable to the proposed facility.

TR6

Land for Recreation

Yes

The site of the proposed Energy fromWaste is in the main on land identified within the Island Plan as Land for Recreation. This proposal is addressed at Policy TR6 of the Plan which identifies the site as being part of a larger area that had the potential to provide new recreation facilities. In particular through the approved planning framework for La Collette 2 this larger area was seen as providing the opportunity for a major landscaped feature and public open space along with access to water at all states of the tide and facilities for small leisure craft.

Travel and Transport  

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

TT1

Strategic Travel Policy

Yes

A transport assessment is included as part of the Environmental Impact Statement. Junction improvements would be required and form part of the transport assessment. Infrastructure improvements would be to adoptable standard.

TT2

Travel Awareness Campaign

No

Refers to a campaign to alter public modes of travel to reduce congestion. The facility would not affect the campaign.

TT3

Island Route Network

No

Facility does not affect designation of island route network.

TT4

Protection of the Footpath and Cycle Network

Yes

Existing footpath or cycle routes would not be adversely be affected by the proposed facility. See TT10.

TT5

Primary Route Traffic Studies

Yes

Refers to traffic studies for the junction of Commercial Buildings and the A17 and new road construction to facilitate the flow of traffic and improve access at Mount Bingham both close to La Collette. See comments in TT1.

TT6

Improvement Lines

No

None of the access points to La Collette are designated as improvement lines.

TT7

Town Centre Movement Strategy

No

Not applicable

TT8

Pedestrian Improvement Areas

No

Ditto

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

TT9

Walking Strategy

No

Ditto

TT10

Cycle Network

Yes

An existing cycle path runs along side the Jersey Electricity Company power station. A cycle lane is being incorporated within the adoptable highway infrastructure improvements within La Collette. The footpath around the perimeter of La Collette as part of the landscaping / recreation proposals would include a cycle lane.

TT11

Cycle Facilities

No

This policy refers to cycle lock up facilities etc. where members of the public have access. There would be no public access to the Energy from Waste facility by cycle due to safety issues of vehicles delivering waste to the facility

TT12

Safe Routes to Schools

No

See comments in TT1

TT13

Public Transport Services

No

Not applicable – unlikely that the Energy from Waste development would generate the need for a bus route, however in the longer term it is probable that future development of the reclamation area would generate sufficient need.

TT14

Bus Priority Corridor

No

Ditto

TT15

Facilities for Bus Passengers

No

Ditto

TT16

Community Transport

No

Ditto  

TT17

Transport Centre

No

Ditto  

TT18

Relocation of Bus Depots

No

Connex operate a bus depot at La Collette. Access to the depot would not be adversely affected by the proposed Energy from Waste plant. Junction improvements would improve access to the Connex depot.

TT19

Accessibility Audits

Yes

Junction improvements and new highway layout are included as part of the submission. Infrastructure improvements would be to adoptable standards and in line with current guidance for the mobility impaired.

TT20

Shopmobility Centre

No

Not applicable

TT21

Reducing Traffic Pollution

Yes

See comments for TT1. The potential impact of traffic generated by the facility and its impact is assessed in the Environmental Impact Statement

TT22

Travel Plans

No

Travel Plans are required for major developments where the floor area of an industrial building is greater than 5,000 metres squared. Assuming a wall thickness of 200mm the floor area of the BW and Energy from Waste combined is 4947 metres squared and the proposal does not need a Travel Plan.

TT23

Traffic Calming and Road Safety in Urban Areas

No

Not applicable

TT24

Road Safety in Rural Communities

No

Ditto

TT25

Parking Strategy

No

Not a parking facility therefore not applicable

TT26

Parking Guidelines

Yes

The parking standards are based on areas as defined by a map that does not show any of La Collette 2, however, the worst case scenario would be 1 space per managerial staff with 1 space

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

 

 

 

for every 2 other members of staff plus 10% visitor parking

TT27

Provision of Public Parking Space

No

Ditto

TT28

Private Car Parks

No

Ditto

TT29

Parking for the Disabled

Yes

A disabled parking space will be provided.

TT30

Commuted Payment in Lieu of Parking

No

Not applicable the development meets TT26

TT31

Proposals for New Car Parks outside St. Helier

No

Not a car park

TT32

Operational Development at Jersey Airport

No

Not applicable

TT33

Aircraft Noise Zones

No

Ditto

TT34

Airport Public Safety Zone

No

Ditto

TT35

Jersey Harbour Operational Area

No

Not within the Jersey Harbour Area but see policy TT36

TT36

St. Helier Waterfront, Harbour and La Collette Related Traffic

Yes

Not within the Jersey Harbour Operational Area. A traffic assessment has been carried out for the proposed waste facilities arising out of the Waste Strategy including the use of La Collette. This is presented within the Environmental Impact Statement.

Natural Resources and Utilities

 

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

NR1

Protection of Water Resources

Yes

This includes coastal waters surrounding La Collette. Engineered drainage systems and pollution control measures would be incorporated into the design of the facility. These are outlined in the Environmental Impact Statement.

NR2

Foul Sewerage Facilities

Yes

This proposed facility would use the foul sewerage network served by Bellozanne. Discharge to foul sewer would be controlled by Trade Effluent Consent.

NR3

Water Conservation

Yes

Development proposals will be encouraged to incorporate water conservation and management measures to conserve the Island's water resources.The feasibility of utilising clean roof water will be considered during the detailed design stage

NR4

Renewable Energy Proposals

No

This facility is a renewable energy scheme. It is re use of a disposed waste. There are wider implications but these are captured in the EIS.

NR5

Energy Efficiency

Yes

The building would not be heated. Only the control room would possibly have heating provided.

NR6

New or Extended Mineral Workings

No

Not applicable  

NR7

Use of Planning Conditions on Mineral Workings

No

Ditto  

NR8

Use of Legal Agreements

No

Ditto  

NR9

Secondary Aggregates

No

Not applicable. This scheme does not produce secondary aggregates. However the scheme does produce a cut volume of approximately 1,500 cubic metres and a need for approximately 30,000 cubic metres of landscaping fill that could be provided by the disposal of inert waste from the nearby aggregate recycling operations.

NR10

New Off-Loading Facilities for Imported Aggregates

No

Not applicable

NR11

Utilities

No

This scheme is not a new facility for a utility company.

NR12

Telecommunications Masts

No

Not applicable. This facility would not have a telecommunications mast.

NR13

Safety Zones for Hazardous Installations

Yes

Site falls within the safety zone for the La Collette fuel farm (consortium made up Jersey Gas, Shell, Total and Esso Mobil). Consultations have been carried out with the Health & Safety Officer, Fire Chief, the Emergency Planning Officer and the Port Energy Group for a Major Hazard Assessment.

Waste Management

 

Policy

Policy

Applicable?

Comments / Design mitigation to achieve compliance

WM1

Waste Minimisation and Recycling

Yes

This facility arises out of the Solid Waste Strategy (2005) – Changing the way we look at waste. This facility is an energy recovery facility from waste and therefore is in compliance with the policy.

WM2

Construction and Demolition Wastes Plan

Yes

No buildings would be demolished in order to construct this facility. There would be some inert waste from excavations for foundations which either would be reused on site on deposited in the La Collette Phase reclamation area. This development would not generate a significant amount of waste and would not therefore require a Waste Management Plan as specified by the policy.

WM3

New and Expanded Waste Management Facilities

Yes

This proposed new waste management facility is submitted for planning approval and is accompanied by a full Environmental Impact Statement in accordance with policy G5. Potential impact from pollution and nuisance is assessed within the Environmental Impact Statement and the design would incorporate measures to mitigate these. Design measures and Operational practices would be specified within the Site Working Plan in accordance with the site Licence Conditions.

WM4

Safeguarded Waste Site

Yes

This refers to Bellozanne as a safeguarded site for redevelopment of the incinerator however the favoured option for the site is La Collette Phase 2 Reclamation.

WM5

Land Reclamation and Landfill Sites

No

Policy refers to landfill at La Gigoulande Quarry and to landfill reclamation sites elsewhere on Jersey (other than La Gigoulande and La Collette). La Collette is still referred to as a potential landfill area and although not specifically identified for ash disposal the policy seems to leave the option available.

WM6

Restoration of Land Reclamation and Landfill Sites

Yes

This facility is not a new land reclamation or landfill site.

The proposed facility would include proposed landscaping plans for the La Collette area