LA COLLETTE WASTE MANAGEMENT SITE – DEVELOPMENT PLAN (P.17/2023): SECOND AMENDMENT

Lodged au Greffe on 4th July 2023 by the Minister for Infrastructure Earliest date for debate: 18th July 2023

STATES GREFFE

2023  P.17 Amd.(2)

LACOLLETTE WASTE MANAGEMENT SITE – DEVELOPMENT PLAN (P.17/2023): SECOND AMENDMENT

1  PAGE 2, PARAGRAPH (a) –

After the words “medium term Plan for”, for the words “Waste Management at La  Collette  Reclamation  Site  Phase  II”  substitute  “the  continuation  of  the management and storage of hazardous waste and inert waste at the La Collette Waste Management site,”.

2  PAGE 2, PARAGRAPH (a) SUB-PARAGRAPH (i) –

After the words “as detailed in drawing”, for “22023-100” substitute “202223- 101” and, for the drawing that forms part of the proposition, substitute the following –

3.  Page 2, PARAGRAPH (a) SUB-PARAGRAPH (ii)

After the words “waste in cells”, for the words “as per plans submitted under application P/2016/1647” substitute “to a maximum height, including capping, restoration soils, and landscaping, of no more than 4.5 metres above the current maximum height of the East Headland”.

4  PAGE 2, PARAGRAPH (a) sub-paragraph (iii) –

For sub-paragraph (iii) substitute the following new sub-paragraph –

“(iii) the formation of the south headland and west headland by deposition of inert waste to a maximum height, including capping, restoration soils, and landscaping, of no more than 4.5 metres above the current maximum height of the hazardous waste mound;”

5  PAGE 2, PARAGRAPH (a) SUB-PARAGRAPH (iv) –

After the words “South Headland”, for the wordsas per the plans submitted under application P/2016/1647” substitute “and West Headland”

6  PAGE 2, PARAGRAPH (a) SUB-PARAGRAPH (v) –

After the words “publicly accessible”, for the words “one-mile-long coastal path around the perimeter of the site once landscaping and restoration is complete” substitute “a coastal walk and cycle path, with appropriate public amenities around the perimeter of the site once landscaping and restoration is complete, and developed in consideration of the safety zone limitations.”

7  PAGE 2, PARAGRAPH (b) –

For paragraph (b) substitute the following paragraph –

“(b)  to request that, prior to the next review of the Island Plan, the Minister

for Infrastructure and the Minister for the Environment develop a long- term strategy for inert and hazardous waste management, to include:

  1. changes to policy and supplementary planning guidance based on the waste hierarchy and with a strict focus on waste minimisation; and
  2. identification  of  future  sites  for  inert  and  hazardous  waste management.”

 MINISTER FOR INFRASTRUCTURE

Note:  After this amendment, the proposition would read as follows –

THE STATES are asked to decide whether they are of opinion

  1. to support the short/medium term Plan for the continuation of the managementand  storage  of  hazardous  waste  and  inert  waste  at  the  La  Collette  WasteManagement site, to include:
  1. a combined waste management approach for hazardous waste and inert soils under a  ‘La Collette Waste Management Site Development Plan’, as detailed in drawing 22023-101;
  2. the formation of the ‘East Headland’ and ‘South Headland’ by deposition of hazardous waste in cells to a maximum height, including capping,restoration soils, and landscaping, of no more than 4.5 metres above thecurrent maximum height of the East Headland;
  3. the formation of the South Headland and West Headland by deposition of inert wasteto a maximum height, including capping, restoration soils, and landscaping, of no more than 4.5 metres above the current maximum heightof the east headland;
  4. the landscaping and restoration of the East Headland and South Headland and West Headland;
  5. the creation of a publicly accessible a coastal walk and cycle path, withappropriate  public  amenities  around  the  perimeter  of  the  site  oncelandscaping and restoration is complete, and developed in consideration of the safety zone limitations; and
  1. to request thatprior to the next review of the Island Plan, the Minister for Infrastructure  and  the  Minister  for  the  Environment develop  a  long-termstrategy for inert and hazardous waste management, to include:
  1. changes to policy and supplementary planning guidance based on the wastehierarchy and with a strict focus on waste minimisation; and
  2. identification of future sites for inert and hazardous waste management.

REPORT

Introduction

The La Collette Waste Management Site occupies the reclaimed land within La Collette Reclamation Phase II. The site is the location of the majority of the Island’s solid waste management facilities. Since completion of the reclamation site construction, the La Collette Waste Management Site has evolved as land has been progressively reclaimed, waste management facilities in other locations have reached the end of their service life, and in response to the Island’s changing waste management needs. The development of the site has been in accordance with policy and planning permissions have been sought as the site has developed. An application made for permission to create the ‘La Collette Headland’ through the deposition of hazardous waste in cells has recently been refused. A  retrospective  planning  application  has  been  submitted  to  enable  the  receipt  of hazardous waste through to the end of 2023, but thereafter, the island will be without a facility for the management of hazardous waste. Furthermore, permissions for the disposal of inert waste soils at the site will be exceeded in the short term.

The  Minister  for  Infrastructure  is  proposing  a  short  to  medium-term  plan  which responds to the previous application’s reasons for refusal, and proposes a significant reduction in headland height, as shown on drawing number Ref: 22023-101, that will address  the  immediate  issues  the  Island  faces  in  relation  to  the  management  of hazardous waste and inert waste soils. This plan will also provide the necessary time to develop and implement a long-term strategy to deliver on the Government’s solid waste related policy objectives.

Background

The relevant planning history to the reclamation site and in relation to the deposition of waste at the La Collette Waste Management Site is considered as commencing in 1993 when, in the October of that year, permission was granted under application 17742 for the construction of the rock armour revetment (a full breakdown of all related planning applications/approvals can be found in Table 5. In the appendices)

Further planning applications 17742/A and 17742/B enabled filling the reclamation site up to the level of the breakwater for inert waste soils and hazardous waste respectively. Planning application 17742/C allowed landscaped tipping of the North Mound to a height of 10m above the top of the breakwater

On 11th July 2000, the States Assembly approved  proposition P.96/2000 and the proposed La Collette  Reclamation  Site  Phase  II  -  Development  Framework

This  provided  the  framework  for  the  future  development of land at La Collette Reclamation Site  Phase II, including the designation of:  

  1. an  area  of  reclaimed  land  for  the  purposes  of  industrial,  storage  and  warehousing use,  
  2. an area of reclaimed land to be used for  super-filling and subsequently for the  purposes  of  providing  a  major  landscaped  feature  and  an  area  of  

reclaimed land to the south of the tanker berth for the public open space,

  1. purposes of storing aggregate material imported through St. Helier Harbour as an option pending the outcome of a feasibility study to assess the viability of this use,
  2. an area of reclaimed land for access to the water at all states of the tide and for associated facilities for marine leisure craft.

One of the key objectives of this framework was based on the rationale that: “Given the difficulties in finding a satisfactory alternative for the future disposal of inert and non- combustible waste materials, it is considered to be in the Island’s best interests to maximise the lifetime of La Collette as a tip site and to incorporate super-filling. This will also enable the creation a landscaped buffer, screening the site from the east, and provide an area of public open space.”

At the time the framework was adopted, ‘Safety Zones’ around the fuel storage facilities had not been conceived (pre Buncefield event - 11th December 2005), with these now used to determine appropriate types of development in proximity to the bulk fuel storage facilities (which fall predominantly in the DPZ, Inner Zone and Middle Zone). As a result, the nature of the public open space (refer point ii.) that the La Collette Headland can provide is restricted, and likely to be limited to a small range of options which will again be limited by space and commerciality as follows:

A landscaped backdrop

A coastal walk (and/or cycle path) around the perimeter of La Collette

Appropriate public amenities

Recognising Challenges at La Collette – The Island Plan

As early as 2002, the Island Plan recognised that La Collette was filling faster than predicted:

Section 14.28 - The Solid Waste Management Strategy recognises the need to provide additional  capacity  for  waste  disposal  in  Jersey.  The  Strategy  recommends  that additional space be created at La Collette through land raising by developing a landform above the sea wall level.

Furthermore, the current Bridging Island Plan recognises that: ‘The Government of Jersey landfill facility at La Collette is, currently, the only licensed terrestrial inert waste disposal site in the island. The facility is reaching the end of its operational life’.

The La Collette Waste Management site  

The waste operation at La Collette  includes  the management  of  municipal and  bulky  waste  through the  Energy  Recycling Facility (ERF), the Clinical Waste  Incinerator  (CWI), Household  Recycling Centre  (HRC),  Metals Recycling Facility (MRF), organic  recycling, aggregate  recycling,  inert waste,  and  hazardous waste, including asbestos.

The  one  hectare  of remaining land is to be used for bulky waste storage to

enable  the  ongoing management of Islanders municipal and bulky waste disposal during the ERF scheduled maintenance periods. This is subject to a future planning application.

With the ongoing high volumes received into the site, issues surround the management of hazardous waste, which is now in breach of its permission condition, and inert waste, which is likely to breach its condition in the short term.

Inert Waste

Inert waste soils are generated through island wide developments. The vast majority of inert waste soils are received at the Inert Waste Soils Reception at the La Collette Waste Management Site, which is one component of the overall inert waste soils and aggregate recycling operation at the site. There are number of small facilities around the island that  can  receive  and  recycle  inert  waste  soils.  However,  the  La  Collette  Waste Management Site is the only facility that has permission for disposal of any surplus non- recyclable content.

Approximately 200,000 tonnes of inert materials are received at La Collette Waste Management site annually. Of this, approximately 120,000 tonnes are recycled into aggregates for use in construction. The surplus 80,000 tonnes are disposed of at the site.

The current planning permissions covering the inert waste soils and aggregate recycling operation permit disposal and landfilling up to the top of the rock armour revetment that forms the perimeter of the site. Stockpiling of soils and aggregates to an average height of 10m and a maximum height of 20m above the top of the revetment is also permitted. The site is currently full and soils and recycled aggregate products are now being stockpiled. At current rates of reception and recycling, it is expected that the permitted stockpiling limits will be exceeded in the short term. This is subject to a future planning application.

Hazardous Waste

Hazardous waste generation is a consequence of essential functions that support Island life. There are three main hazardous waste streams in Jersey:

Ash and residues from incineration of waste (ERF, CWI, and ACI – Animal Carcass Incinerator)

Asbestos containing materials (ACMs)

Contaminated soils

There are other hazardous waste types generated on Island, primarily through industrial activity such as boat cleaning, however, the quantities of these types of waste are relatively small.

The majority of ash and residues come from the ERF and are exported to the UK. This is possible and permitted by the relevant UK authorities as this waste is exported for recovery so is moved up the waste hierarchy by exporting from Jersey. Relatively small quantities of ash and residues arise from the CWI and ACI.

Asbestos containing materials arise from the refurbishment and demolition of buildings, received  from  homeowners  undertaking  work  on  their  property  and  commercial customers and licensed asbestos removal contractors carrying out refurbishment and demolition works for others. Asbestos waste cannot be exported as permission has been refused by the relevant UK authorities.

Contaminated soils are generated through development of contaminated land which exists across the island and are normally the result of historic industrial and commercial operations, for example:

Old gas works sites & petrol stations

Scrapyards

Land reclamation and waste landfilling

Industrial plant waste storage and treatment facilities

Hazardous waste is disposed of in waste containment cells at the La Collette Waste Management Site. The design, construction and operation of these cells is stringently regulated under the Waste Management (Jersey) Law 2005. The site has a Waste Management Licence issued under this law for the receipt and disposal of hazardous waste.  It  is  a  condition  of  this  licence  that  the design  of  cells  is  undertaken  by independent specialists and meets the requirements of international standards. The design must be approved by the Waste Regulator prior to construction. Construction of cells is supervised by an independent Construction Quality Assurance (CQA) Engineer. A  CQA  Validation  Report  confirming  cells  have  been  properly  constructed,  in accordance with the design, must be sent to the Waste Regulator for approval before the cell  can  become  operational.  The  waste  deposition  operation  is  undertaken  in accordance with a Waste Regulator approved Working Plan.

Over the last 10 years, approximately 250,000 tonnes of hazardous waste have been disposed of at La Collette. The producers and sources of this waste is summarised in the following table 1:

 

Producer

Ash  and  residues  from waste incineration

Asbestos containing materials

Contaminated soils

Total

ERF

CWI

ACI

Government

61,900

200

800

500

24,300

87,700

ALO’s

0

0

0

100

145,300

145,400

Third party

0

0

0

6,700

12,700

19,400

Total

61,900

200

800

7,300

182,300

252,500

  1. All quantities are given in tonnes to the nearest 100 tonnes.
  2. The  majority  of  the  24,300  tonnes  of  contaminated  soils  produced  by Government  of  Jersey  was  due  to  the  construction  of  the  New  Sewage Treatment Works.
  3. ALO – Arms-Length Organisation

Some significant activities that will generate hazardous waste in the future are listed in the following table 2:

 

Activity

Producer

Hazardous Waste Type

Quantity (tonnes)

Animal  carcass incineration

Government

Ash / Residue

150 pa

Clinical  waste incineration

Government

Ash / Residue

40 pa

General asbestos removal

-

Asbestos

730 pa

New Healthcare Facilities

Government

Asbestos / Contaminated Soils

Unknown

Tunnel  St  /  Gas  Place development

Government

Contaminated Soils

Unknown

Overdale Hospital works

Government

Asbestos / Contaminated Soils

Unknown

Southwest  St  Helier Masterplan

ALO

Contaminated Soils

360,000

Elizabeth  Harbour redevelopment

ALO

Contaminated Soils

Unknown

With the exception of the ‘North Mound’ which has specific permission linked to the ERF permission (P17742/C), planning permits for disposal of hazardous waste at the site generally give permission for waste to be filled to the top of the rock armour revetment. Hazardous waste super-filling is already above this with the highest point being approximately 17m above the top of the revetment.

Planning Application – Hazardous Waste

In 2016, planning application P/2016/1647 – ‘Construction of La Collette Headland for super-filling with hazardous waste’ was submitted. The resolution of the planning application has been delayed significantly, and in March 2023, whilst the Planning Officer recommended the application be approved, the Planning Committee chose to refuse the application, siting:

  1. Policy MW3 – In this instance, insufficient information has been submitted with the application to satisfy the comprehensive after-use restoration plan requirement of the policy,
  2. Policy GD9 – given the proposed siting, height, scale, and profile of the development proposed, together with a lack of information to demonstrate

how this proposal can be satisfactorily mitigated, the development will result in visual harm to the skyline, and

  1. Policy GD9 – the development given its siting, height, scale, and profile in this location will obstruct significant views to the Noirmont Headland

This is due for formal confirmation of the refusal on the 7th September 2023.

The application included a proposed Landscaping Strategy, Landscaping & Restoration Drawings, Construction Environmental Action Plan, and Working Plan required under the  facility  Waste  Management  Licence  which  were  submitted  alongside  the application. The Landscape and visual impact were covered in the application, and an assessment in accordance with recognised standards was undertaken and described in the Environment Impact Assessment. This EIA concluded that the Headland would see no significant impact, and instead deliver moderate benefits. It was also felt, as the Headland would provide an essential facility for the Island for which there is no viable alternative, that the overall community benefit outweighs the adverse effects. This proposal responds to the reasons for refusal as covered in the short-medium-term plan which follows.

The Impacts of Planning Refusal

Given that the La Collette Waste Management Site is already exceeding its permission with regards to hazardous waste, the site will need to close to the receipt of hazardous waste  from  the  7th  September  2023  once  the  planning  refusal  is  confirmed.  A retrospective planning application (see details below) has been submitted and a future state application is due to be submitted prior to the 7th September. This will allow for the continued receipt of hazardous (and inert) waste at La Collette until such time as the planning application is determined. Should the retrospective planning application or future state application be refused, then the island will be without a facility or solution for the management of Hazardous Waste either from the 7th September or at the point the future state application is refused accordingly.

The result of this means that existing activities generating hazardous materials will need to cease –including:

  1. Clinical waste and animal carcass incineration
  2. Asbestos removal and disposal
  3. Any construction/development on a contaminated site (as listed with Environmental Health or otherwise)
  4. Boat washings and any other small scale domestic hazardous waste creation. e.g. driveway planings, etc.

For a full list of current/ongoing activities that will need to cease, refer to table 6 in appendices.

Additionally, future developments on contaminated sites (detailed in table 2.) would not be able to progress, with Planning already advising likely refusal of some applications on the basis of the Hazardous Waste decision. Finally, there is a significant increase in the environmental risk of fly-tipping hazardous materials on Jersey.

This is likely to impact all aspects of the Governments’ ability to deliver the seven priorities  for  change  under  the  common  strategic  policy.  Furthermore,  this  will significantly hinder the future housing growth strategy as defined in the Bridging Island Plan.

Retrospective Planning Application

Following the refusal of planning application P/2016/1647, the Regulation Department has requested a two-part approach to the hazardous waste and inert waste operation at La Collette:

  1. A retrospective planning application to cover the current state of the super-filled hazardous waste landfill since 2016, including the predicted additional landfill through to the end of 2023.
  2. An additional planning application to address the future use of La Collette with regards to the operation and storage of hazardous waste and inert waste beyond 2023 (see short to medium-term plan)

The retrospective planning application has been submitted as requested and is based on the current and anticipated volumes through to the end of 2023. The proposal has also considered some levelling off of cells to enable the landscaping and restoration to take place.

The overall maximum height of the mound will be realised in the East Headland (North), peaking at 31m above chart datum, and 17m above the height of the armour wall revetment. The Headland will be formed by capping the hazardous waste cells in accordance with all regulatory and environmental requirements associated with this, and thereafter covering with a  layer of soil and landscaping. The Headland has been structured to maximise environmental, landscape, and visual impact benefits.

Short / Medium-Term Plan – The Future State Plan

In the short to medium-term, there are no other viable solutions (refer Table 3 in appendices) for managing non-recyclable inert waste and hazardous waste, and as such extending the life of La Collette with continued filling will provide the island with an ongoing disposal option for these waste streams.

Under this proposition, it is proposed in the short to medium-term to:

Continue filling of hazardous waste in the east headland by a further 4.5m above that contained within the retrospective planning application

The creation of a south headland and a west headland mound for the deposition of  non-recyclable  inert  waste,  also  creating  a  visual  barrier  to  the  waste operation  within  La  Collette  and  enabling  public  open  space  around  the perimeter of the Headland

The south and west headland will not exceed the height of the east headland

The  creation  of  a  publicly  accessible  coastal  walk  and  cycle  path,  with appropriate public amenities developed in consideration of the safety zone limitations around the perimeter of the site once landscaping and restoration is complete

In cognisance of the 2016 planning application (impact on the vista), the height of the mounds in the future state application have been reduced by 5.5m. This is the absolute minimum height to enable the operation of La Collette waste management site to continue through the short to medium-term whilst the long-term plan is developed and implemented. The proposals are illustrated on drawing number 22023-101 below:

The short to medium-term plan will provide a solution to the Islands essential need for the  management  of  non-recyclable  inert  waste  and  hazardous  waste,  whilst  also providing additional community benefit, environmental benefits, and enhancements to the landscape and seascape character as prescribed in the Bridging Island Plan.

Furthermore, this is consistent with the Bridging Island Plan commentary relating to waste operations, in that;

The co-location of complementary waste management facilities and activities on one site can provide environmental benefits through the reduction of overall traffic volumes and by enabling flexible integrated facilities to be developed. The plan is, therefore, supportive of some intensified or extended use of existing facilities where the site is capable  of  withstanding  the  growth  and  where  it  will  provide  integrated  waste management practices in accordance with the waste hierarchy, thus reducing the need for additional sites in new locations across the island.”

It is estimated that the short to medium-term plan would extend the life of La Collette by a minimum of 4-years based on historic normal trend annual volumes of waste material. It is worth noting that the receipt of any significant additional volumes of hazardous waste of non-recyclable inert waste during this period, will reduce the life of La  Collette  and  reduce  the  period  in  which  to  deliver  the  long-term  plan. Notwithstanding this, the creation of the coastal path and other public amenities will be delivered as a matter of priority throughout this period and in line with any Health and Safety and operational constraints.

It is critical that during this period afforded by the short to medium-term plan, that we work closely with Industry and the Department for the Environment – Regulation, to develop and implement waste minimisation solutions, approaches, policy, and pricing.

In response to the refused application P/2016/1647, the future state planning application pays particular heed to the importance of delivering a landscaped solution akin to the character of the area, whilst providing a usable public open space and maximising the opportunity afforded by the La Collette Headlands.

This application also considers the impact on the vista and views afforded by the headland, most notably in relation to the coastal views of the Noirmont Headland. The revised application and associated landscaping plans propose Headlands that are 5.5m lower than those requested in P/2016/1647 and will fall 31.5m below the height of Noirmont Point, thereby minimising any impact on the visibility of this key area of natural beauty.

Long-Term Plan

During the period proffered by the short to medium-term plan within this proposition, it  is  critical  to  commence  work  on  the  long-term  plan  for  the  future  of  waste management on Jersey relating to both hazardous waste and non-recyclable inert waste.

Under this proposition, it is proposed that the Minister for Infrastructure and the Minister for the Environment work collectively to establish the long-term plan, inclusive of the following aspects:

Using policy, regulation, enforcement, and disposal charges to drive behaviour change with the aim to minimise the generation of waste at source

Identify future locations for the management and storage of hazardous waste and non-recyclable inert waste once La Collette has reached capacity as per the short to medium-term plan

Reducing waste at source (and thereby reducing volumes) is fundamental to the lifespan of La Collette, and this can be achieved through the Bridging Island Plan’s waste management policies which reflect and endorse the hierarchy of waste management principles. This hierarchy, illustrated below, ranks the options according to their relative environmental benefits or dis-benefits and seeks to ensure that, before waste is finally disposed of in landfill, all alternative measures have been considered.

Policy WER1 already contains the relevant narrative to enable the change in behaviour, and this could be further supported by using the Solid Waste team as a statutory consultee to planning applications where hazardous waste and non-recyclable inert waste volumes are to be generated. This will enable expert GoJ opinion on waste management and effective treatment, and validate the waste volumes associated with the planning application.

There are several options which will need to be considered for the future location of waste management for hazardous waste and non-recyclable inert waste, and these are:

  1. Continue to use La Collette by way of an additional planning application to further increase the height of the east, south, and west headlands above that made in the future state application
  2. Identify and develop new or existing on-island waste management sites, taking into consideration the proposed use of La Gigoulande Quarry to manage inert waste as part of the current BIP
  3. Utilise non-recyclable inert waste in future reclamation projects (i.e. Shoreline Management Plan) from La Collette, creating capacity for additional hazardous and non-recyclable waste storage

It is also worth noting that there is no option to export hazardous waste given that any Duly Reasoned Request (DRR) to do so would be rejected due to Basel Convention and DEFRA  requirements.  Furthermore  the  cost  to  export  hazardous  waste  would  be significant:

Export existing stock to UK: £100,000,000 (approx. 505,000t over last 20 years) Exporting expected Waterfront volumes to UK: £72,000,000 (over next 10-15 years) Normal operational volumes exported to the UK: £50,000,000 (over next 10 years) £200 cost per tonne

Financial and manpower implications

  1. The  hazardous  waste  budget  is  designed  to  cover  the  operational  and infrastructure costs and therefore there are no financial implications relating to hazardous waste attributed to this proposition. The management operation is outsourced and as such, there are also no manpower implications from this proposal.
  2. Annual budgeted net income for inert waste is £2.3M, with circa £100k of internal manpower resource allocated to the waste management operation for inert waste. Support of this proposition will confirm the States agreement of the Future State Plan, which should enable planning permission to be considered in this context, and the continuation of this operation and therefore, income.
  3. There will be an additional cost incurred for the landscaping and restoration of the east, south, and west headlands, however the quantum of this is unknown at this time.
  4. In the event that the management of inert waste moves to Granite Products as per the Bridging Island Plan, or another on island location, then there will be a reduction of income received at La Collette for the management of this waste stream. This could be up to the total value as detailed in point (ii)
  5. Successful  behaviour  change  brought  about  by  policy,  regulation,  and enforcement will reduce volumes delivered to La Collette, and as such will result in a reduction of income received at La Collette for the management of inert waste.
  6. Changes to inert waste and hazardous waste charges will impact the income received by the solid waste team, although the value of this is unknown as price increase should reduce demand (change behaviour) and so smaller volumes will be  received  at  increased  prices.  The  elasticity  of  demand  in  this  area  is unknown.