Does the annual running costs for the proposed sunken road at the Esplanade Quarter include the fume extraction equipment

The official version of this document can be found via the PDF button.

The below content has been automatically generated from the original PDF and some formatting may have been lost, therefore it should not be relied upon to extract citations or propose amendments.

1240/5(4010)

WRITTEN QUESTION TO THE MINISTER FOR TRANSPORT AND TECHNICAL SERVICES BY DEPUTY G.C.L. BAUDAINS OF ST. CLEMENT

ANSWER TO BE TABLED ON TUESDAY 15th JULY 2008

Question

With regard to the proposed sunken road at the Esplanade Quarter, would the Minister advise whether the annual maintenance and running cost of the fume extraction equipment is budgeted for within the suggested £500,000 annual spend, and would he further advise whether the fumes will be filtered before release into the atmosphere and, if so, the annual cost of so doing?

Would the Minister further advise precisely where, and what height, the fumes will be released? Answer

The estimated energy and routine maintenance costs for the tunnel ventilation plant are included in the suggested figure of £500,000 per annum for the total operating costs for the tunnel.

There are no plans to filter the air exhausted from the tunnel. The pollution extract system will move the air through the tunnel prior to it being discharged at the tunnel portals. The air will not be filtered prior to discharge.