Question

When were the original two streams at Bellozanne commissioned?

When was the third stream commissioned?

Are they run simultaneously or individually or in other combinations, and if so, which? What flue gas treatment has been fitted on the three streams?

What are the actual current pollution levels from each stream?

What was the design life of the third stream on commissioning?

What is the remaining design life of the third stream?

Answer

The original two streams were commissioned in 1979.

The third stream was commissioned in 2002/3.

They are operated in any combination of the three, subject to maintenance and availability.

The only flue gas treatment system fitted to all three streams is Electro Static precipitators to remove the larger dust particles from the exhaust gas stream.

The pollutant levels for the existing plant are shown in the table below and provide Members with a comparison between the existing plant and the Waste Incineration directive WID that the new plant will have to comply with:

The design life for the third stream was 20-25 years.

The remaining life of the third stream is between four and nine years but it is not the design life for the third stream that is the deciding factor on how much longer it can operate, it is the current emission levels and the condition of the surrounding plant that was constructed in 1979. This plant on which the third stream is totally reliant is now 30 years old and given its original design life of 20-25 years it is well beyond providing reliable and safe operation for the disposal of the island's residual waste. The most recent examples of the failure of the crane support mechanism and chimney are key indicators that the main plant is beyond continued economic, reliable and safe operation.