STATES OF JERSEY
r
ECONOMIC STIMULUS PLAN 2 (P.55/2009) (S.R.2/2010):
RESPONSE OF THE MINISTER FOR TREASURY AND RESOURCES
Presented to the States on 18th March 2010 by the Minister for Treasury and Resources
STATES GREFFE
2010 Price code: B S.R.2 Res.
ECONOMIC STIMULUS PLAN 2 (P.55/2009) (S.R.2/2010): RESPONSE OF THE MINISTER FOR TREASURY AND RESOURCES
Introduction
The Minister welcomes this second report on the Economic Stimulus Plan and broadly agrees with the key findings of the Corporate Services Scrutiny Panel.
Since the initial review, all bidding departments, the Treasury and the Fiscal Stimulus Steering Group have worked hard to deliver benefit to Jersey's economy whilst maintaining the appropriate level of oversight and control over spending of this allocation of £44 million from the Stabilisation Fund.
It is an inherent characteristic of any forecast that actual events and results will be different to those anticipated in advance. The Jersey economy has proved no different and the outlook reported by the Fiscal Policy Panel (the "FPP") in November 2009 (in its update to the 2009 Annual Report) contained some important differences to its outlook reported in the May 2009 Annual Report. Although the central expectations for 2009 and 2010 were unchanged in November 2009's update, the risks around them were re-evaluated and the FPP believes there is less downside risk, in both 2009 and 2010, than there was at the time of 2009's Annual Report. The FPP also confirmed its earlier recommendation that the fiscal stimulus should continue to be implemented. The Minister has no doubt that the initiative has ensured that more people are staying in work and that Jersey is weathering the downturn well. Economic conditions will be kept under review, but the latest available evidence points to a clear downturn in the economy.
A number of projects of major importance for Jersey have been successfully funded through the programme by virtue of their characteristics of timely, targeted and temporary, including long awaited works in respect of Jersey's infrastructure, such as schemes to improve the road network. In addition, a number of important skills projects have been designed and implemented, in particular the Advance to Work scheme and the States Apprenticeships Scheme. These projects have been invaluable in helping to support young people during this difficult economic environment.
The Minister is appreciative of the Panel's allocation of time within its significant work programme to revisit the economic stimulus package, and welcomes its continued support in delivering an effective stimulus to the Island economy.
Findings
| Findings | Comments |
1 | In October 2009, the Island was suffering from a less intense recession than some other jurisdictions. |
|
2 | There appears to be a slowing down in the pace of the recession in Jersey although the possibility of a stabilisation seems a little over optimistic. |
|
3 | Evidence within the Island extremely patchy. is | The Minister recognises that the information available about the economy on a timely basis has, in the past, been limited, but emphasises that every effort is being made to capture data on a more systematic and regular basis to provide indicators that will facilitate decision making, particularly in relation to the Economic Stimulus Plan. The development of the Business Tendency Survey is an example of a new initiative, which will provide timely information on the performance of the economy and on a quarterly basis. |
| Findings | Comments |
|
|
– The Financial Institutions Survey shows that firms expected a significant fall in profitability in 2009. – The Business Tendency Survey points to falling activity across the economy – in the finance and non- finance sectors. – Labour market indicators are weak with unemployment up, employment down and vacancies at lowest levels for 10 years. – Retail sales are also falling.
|
4 | Sustainable real growth rates should be observed. | The Minister agrees with this key finding, provided that it means growth rates should be observed across the whole economic cycle and not at certain points in it. The average growth rate across the cycle will by definition be exceeded in the upward phase of the cycle and fall short during the downward phase of the cycle. It is not feasible or desirable to try and achieve a constant rate of economic growth each year. |
| Findings | Comments |
|
| The Minister also points out that the "testing" process implemented to release funds to departments or third parties which have bid successfully for fiscal stimulus funding is designed to be a further cross-check that stimulus funds do not lead to overheating at the sectoral level. |
5 | The Panel recognised a problem with the communication of the process outside States' Departments in the business world. The Panel noted the Minister for Treasury and Resources acknowledged room for improvement and agreed to take this on board. |
|
6 | The Panel agrees that the continued application of the Economic Stimulus Plan is commensurate with the shape and status of the recession. | The Minister is pleased that the Panel has endorsed his view, based on the available evidence and advice that the Economic Stimulus Plan should continue. |
7 | The process needs to filter through to the economic community immediately for maximum effect. |
|
8 | The slower entry into the recession than expected has permitted a thorough planning process in the preparation of the bids. | A thorough planning and assessment process has been implemented throughout. It is unacceptable to reduce standards of oversight and governance in respect of the spending of public money as part of a programme with such specific objectives as the Economic Stimulus Plan. |
| Findings | Comments |
9 | The extra places at Highlands and the Advance to Work scheme are both unlikely to meet the "temporary" criteria. |
initiatives. |
10 | The 3 T's are being adhered to within the selection process at the time. | The Minister welcomes the Panel's endorsement of the evaluation and assessment process, which continues to be rigorously enforced as projects given an "amber light" come forward for consideration for "green lights" with a commitment to funding. |
11 | The lessons learned from this recession must be recorded for future reference. | This finding is endorsed by the Minister and how the information is intended to be captured is set out below alongside the relevant recommendation. |
Recommendations
| Recommendations | To | Accept/ Reject | Comments | Target date of action/ completion |
1 | Sustainable real growth rates must be established and observed. |
| Accept | The Minister accepts this recommendation provided that it means growth rates should be observed across the whole economic cycle and not at certain points in it. The average growth rate across the cycle will by definition be exceeded in the upward phase of the cycle and fall short during the downward phase of the cycle. It is not feasible or desirable to try and achieve a constant rate of economic growth each year. |
|
2 | The process needs to filter through to the economic community immediately for maximum effect. |
| Accept | The Minister accepts that for the Jersey economy to feel the full effect of the economic stimulus the benefit needs to filter through to the community. However, the nature of the programme means that the cash benefit will be felt in the economy over a period of time, but that confidence improves at the inception of a project or when it first goes to market. The importance of this should not be underestimated and as such measures of spend may underestimate the level of benefit that this States' intervention has delivered into the economy. |
|
3 | Communication outside the States' departments must be improved immediately. |
| Accept | At the time of the Panel's review, work was already under way to improve communications with business, particularly those in the construction sector and allied trades which are looking for the opportunity to tender for fiscal stimulus works. |
|
4 | The lessons learned from this recession must be recorded for future reference. |
| Accept | Comprehensive records are maintained to support the bids, the evaluation and assessment process. Thereafter project progress and performance records are maintained both at a project, department and programme level. On completion of projects the records will be retained. |
|
| Recommendations | To | Accept/ Reject | Comments | Target date of action/ completion |
5 | A comprehensive, defined communication strategy should be immediately put in place by the Minister for Treasury and Resources. |
| Reject | A communications strategy has been in place throughout. The methods adopted at the outset to inform potential suppliers about forthcoming work were considered by the Minister, the Fiscal Stimulus Steering Group and the departments to be appropriate, although the Panel's comments were taken on board. These comments, together with other experiences as the projects progressed, prompted improvements. |
|
6 | The Minister for Treasury and Resources should publish, in an open and transparent manner, all money passed to departments and spent by departments at the end of the year having regard for commercial sensitivities. |
| Reject | The details of the funds passed to departments, and details of the purpose for which those transfers are made, are already published in an open and transparent manner by virtue of the fact that allocations of the £44 million economic stimulus fund can only be made by public ministerial decision of the Minister for Treasury and Resources. All decisions are recorded, approved and made public in the usual way. It is not considered necessary for separate reports to be prepared and published relating to spend other than in aggregate at the end of the programme when any remaining unspent funds will be returned to the Stabilisation Fund. |
|
7 | Departments should publish a report to identify performance of bids on an annual basis. |
| Reject | Departments are already recording progress and performance, and reporting to the Fiscal Stimulus Steering Group on a monthly basis. It is not considered appropriate for this information, which is necessarily reporting a high level of detail, to be made public. |
|
8 | The extra places at Highlands and the Advance to Work scheme must meet the "temporary" criteria by the end of the recession. |
| Reject | The extra places at Highlands and the Advance to Work scheme already meet the temporary criteria by virtue of the fact that there are no commitments to provide any additional funding to these schemes beyond the finite period for which they are being operated. Any decisions to continue the schemes must be based on available funding reprioritised from existing resources from within the Department for Education, Sport and Culture. |
|
Conclusion
The key findings and recommendations of the Panel have, even where the Minister does not wholly endorse the Panel's view or accept their recommendation because an issue has already been addressed, been very helpful in making refinements and improvements to the process as the fiscal stimulus programme develops. This is particularly evident in respect of communications outside the States, where the Panel's comments were accepted and acted on to make improvements as soon as practicable.
The Minister has no doubt that the initiative has ensured that more people are staying in work and that Jersey is weathering the downturn well.